AGEC/FNR 406 LECTURE 9 Corn growing at site of former rainforest.

Slides:



Advertisements
Similar presentations
AGEC/FNR 406 LECTURE 10 Rice drying on the Philippine National Highway.
Advertisements

Why study natural resource economics?
Cost-Benefit Analysis
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
B280F Introduction to Financial Management
Capital Investment. Lecture Outline Define Capital Budgeting. Explain the importance of Capital Budgeting. Examine the method of implementing and managing.
F28SD2 Software Design Monica Farrow EM G30 Material available on Vision Cost/benefit analysis Accounting methods.
11-1 Lecture 8: Capital Budgeting Decisions Chapter 12 in Brewer.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Capital Budgeting Last Update Copyright Kenneth M. Chipps Ph.D
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
AGEC 608 Lecture 06, p. 1 AGEC 608: Lecture 6 Objective: Outline approach for discounting benefits and costs that accrue at different points in time Readings:
Part I. Principles A.Markets B.Market failure C.Discounting & PV D.Dynamic efficiency E.Pollution solutions.
Valuation Under Certainty Investors must be concerned with: - Time - Uncertainty First, examine the effects of time for one-period assets. Money has time.
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Cost-Benefit Analysis. 2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C)
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
Three-way choice Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous.
1 Total Resource Cost Effectiveness Test Utility Brown Bag Series by Tom Eckman, NWPCC Ken Keating, BPA October 4, 2006.
U.C. Berkeley© M. Spiegel and R. Stanton, BA203 Present Value Fundamentals Richard Stanton Class 2, September 1, 2000.
Why study natural resource economics?
AGEC/FNR 406 LECTURE 8 A rural market in the Philippines.
ENVIRONMENTAL BENEFIT COST ANALYSIS Traditional BCA Decision making without environmental values (too difficult to evaluate, subjective, irrelevant) Modern.
British Columbia Institute of Technology
Class 4 Benefit Cost Analysis
Chapter 4 The Time Value of Money Chapter Outline
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Basic Economic Concepts. OBJECTIVE: The student will become familiar with the following items: Economic Fundamentals –Scarcity –Choices –Basis of Benefits.
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
Economic Analysis: Applications to Work Zones March 25, 2004.
Long-Term (Capital Investment) Decisions
Interest ratesslide 1 INTEREST RATE DETERMINATION The rate of interest is the price of money to borrow and lend. Rates of interest are expressed as decimals.
Assessing Costs for Environmental Decision Making Chapter 8.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
PPA 723: Managerial Economics Lecture 20: Benefit/Cost Analysis 1, Present Value and Discounting The Maxwell School, Syracuse University Professor John.
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
AGEC/FNR 406 LECTURE year old Loblolly Pine plantation.
Time Value of Money, Discounted Cash Flow Analysis (NPV) & Internal Rate of Return.
Benefit-Cost Analysis in Environmental Decision Making Chapter 9 © 2004 Thomson Learning/South-Western.
Chapter 3 Arbitrage and Financial Decision Making
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
LIR 809 LABOR AS A QUASI-FIXED COST: Human Capital Investment.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Investment in Human Capital Model-Part I Topic 3 Part III.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
CAPITAL BUDGETING_LECT 091 The Concept of Opportunity Cost The concept of opportunity cost is used in CBA to place a dollar value on the inputs required.
Chapter 8 Long-Term (Capital Investment) Decisions.
1 5. WHAT ARE THE KEY BENEFIT/COST MEASUREMENT METHODS FOR NATURAL RESOURCE & ENVIRONMENTAL ISSUES? SPRING 2002 Larry D. Sanders Dept. of Ag Economics.
AGEC 608 Lecture 01, p. 1 AGEC 608: Lecture 1 Objective: Introduction to main concepts Readings: –Boardman, Chapter 1 –Kankakee, summary of Draft Assessment.
1 Cost-Benefit Analysis Public Economics Minda DC. Eduarte.
Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions. Does a proposed.
Benefit-Cost Analysis in Environmental Decision Making
Chapter 1 Scarcity and the Factors of Production In this lesson, students will be able to define the following key concepts: Scarcity Economics The Factors.
Investment Appraisal. Investment appraisal This refers to a series of analytical techniques designed to answer the question - should we go ahead with.
How Projects Get Started Conducting a Project Assessment 1.
Capital Budgeting 2 Dr. Clive Vlieland-Boddy. Investment Appraisal.
Accounting for Time In addition to computing all benefits and costs in money terms,… The monetary costs and benefits must be calculated at a single point.
BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets Ch. 3: Decision Rules © Harry Campbell & Richard Brown School of Economics The.
Analytical Tools Marginal analysis Discounted cash flow.
Chapter 18 Financial Mathematics. Learning Objectives Explain why a dollar today is worth more than a dollar in the future. Define future value and present.
CHAPTER 1 ECONOMICS Economic Notes Chap.1 What is Economics ? Section 1-1.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
DMH1. 2 The most widely accepted objective of the firm is to maximize the value of the firm. The financial management is largely concerned with investment,
© 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Rice drying on the Philippine National Highway
Contemporary Engineering Economics
Discounting Future Benefits and Costs
Presentation transcript:

AGEC/FNR 406 LECTURE 9 Corn growing at site of former rainforest

Benefit-Cost Analysis First of two related lectures: 1.Overview of benefit-cost analysis 2. Specific benefit-cost tools Remember to review the BCA packet!

Static efficiency is defined as maximization of net benefits for a single time period. Many economic decisions that occur over time are a series of static decisions. Example: Shopping for Food Choose groceries each week, consume them, then start over again next week. Static vs. dynamic efficiency

A dynamic decision is one in which current decisions have impacts on net benefits arising in the future. Many economic decisions with environmental implications are dynamic. Example: Forestry If you choose to harvest trees this year, harvesting next year is no longer an option. Static vs. dynamic efficiency

Benefit-Cost Analysis What is benefit-cost analysis? BCA is an economic technique used to: 1.Evaluate a project or investment over time 2. Compare the merits of a set of projects BCA is conducted by comparing economic benefits of an activity with economic costs of an activity.

Key Point As a tool for economic analysis, BCA seeks to examine potential actions with the objective of increasing well being... …seeking an activity or use that provides greater benefit than cost, or the greatest benefit among competing uses.

Key Point Decisions are typically not made on the basis of BCA alone… but BCA can be useful for providing information on economic features of projects or activities, and can therefore be useful for informing the debate.

Dam construction Costs: Materials = $500,000 Labor = $600,000 Total Cost = $1,100,000 BCA in a timeless world

Dam construction Benefits: Recreation = $400,000 Flood control = $300,000 Electricity = $500,000 Total Benefit =$1,200,000 BCA in a timeless world

Dam construction Total Benefit =$1,200,000 Total Cost = 1,100,000 Net Benefit = 100,000 Benefit exceeds cost, so dam appears to be a good investment BCA in a timeless world

BCA as “Approach” To know whether society should build the dam, other information may be needed: 1. Are there non-economic impacts? 2. What is the opportunity cost of the dam?

Time and Discounting Often the benefits and costs of a project accrue at different times. The technique used to deal with this issue is discounting.

Discounting Discounting is a technique used to convert all benefits and costs to a common point in time, usually the present. The value of a project, expressed in terms of the present, is called the Present Value.

Discounting Discounting is based on the premise that a dollar of benefit received today is worth more than a dollar of benefit received in the future. The bias arises because current resources can be invested. Discounting is the opposite of compounding.

Discounting The rate at which a current value is compounded is called the interest rate. The rate at which a future value is discounted is called the discount rate.

Computing a present value PV = P t / (1 + r) t PV = present value P t = value at time t r = interest (discount) rate t = year in which P t is realized

Dam revisited Total Benefits accrue when dam is finished (t = 1) Total Costs accrue at start of construction (t = 0) Discount rate = 10% Should the dam be built? BCA with discounting

Total Benefits accrue when dam is finished (t = 1), so P t = $1,200,000 and PV of benefit is: $1,200,000 / (1+0.10) 1 = $1,090,909 Total Costs accrue at start of construction (t = 0), so P t = $1,100,000 and PV of benefit is: $1,100,000 / (1+0.10) 0 = $1,100,000 PV(B) < PV(C) The dam shouldn’t be built. Dam construction revisited

Total Benefits accrue in the future (i.e. when dam is finished). The process of discounting reduces the value of those benefits because they occur in the future. Because the merit of a project can hinge on the choice of discount rate, it can be a source of debate. There is no simple rule for choosing a discount rate. Often a “well known” interest rate is used. Why the reversal?

Whenever benefits and costs accrue at different points in time, amounts should be converted to present values for comparison. BCA is a decision-support tool, not a decision- making tool. Discounting can be used regardless of the length of time under consideration, but discounting has implications for equity. Key Points