ATCA and Mopra Phil Edwards. VSOP 1997-2003 80 observations with ATCA 190 observations with Mopra.

Slides:



Advertisements
Similar presentations
VLBI progress Down-under Tasso Tzioumis Australia Telescope National Facility (ATNF) 25 September 2008.
Advertisements

E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
E-VLBI progress in the South Tasso Tzioumis ATNF, CSIRO September 2006 “Towards e-VLBI”  “e-VLBI”
A supercomputer-based software correlator at the Swinburne University of Technology Tingay, S.J. and Deller, A.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
CABB Observations Preparations and Observing Mark Wieringa.
A MOPRA CS(1-0) demonstration survey of the Galactic plane G. Fuller, N. Peretto, L. Quinn (University of Manchester UK), J. Green (ATNF ) All dust continuum.
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
Millimetre Facilities in Australia Andrew Walsh. Australia Telescope Compact Array.
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Panorama of the Universe: Daily all-sky surveys with the SKA John D. Bunton, CSIRO TIP, Ronald D. Ekers, CSIRO ATNF and Elaine M. Sadler, University of.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Science Operations Philip Edwards Head of Science Operations 26 May 2010.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Wideband Imaging and Measurements ASTRONOMY AND SPACE SCIENCE Jamie Stevens | ATCA Senior Systems Scientist / ATCA Lead Scientist 2 October 2014.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
(Spectral Line) VLBI Chris Phillips CSIRO ATNF Chris Phillips CSIRO ATNF.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
ATUC Meeting, 14 May 2009, Astro Issues Robert Braun.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
Operations Philip Edwards Head of Science Operations 28 October 2008.
Observing Strategies at Millimetre Wavelengths Tony Wong, ATNF Narrabri Synthesis Workshop 13 May 2003.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Мulti-frequency VLA observations of M87. Observations’ parameters Test VLA observations (configuration D) of M87 (RA=12:28, Dec=12:40) took place on November.
Molecular Clouds in in the LMC at High Resolution: The Importance of Short ALMA Baselines T. Wong 1,2,4, J. B. Whiteoak 1, M. Hunt 2, J. Ott 1, Y.-N. Chin.
Adaptive Filters for RFI Mitigation in Radioastronomy
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Pulsar luminosity distribution in 47-Tuc Tim Connors, Vacation student University of Sydney.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
MOPS Spectrometer Dick Ferris 29/6/06 MOPS, the Mopra Spectrometer Dick Ferris ATNF 29/6/06.
Australia Telescope Users Committee Technologies Report - Nov 2007.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
CABB support and ATCA flux calibration Jamie Stevens ATCA Senior System Scientist 26 May 2010.
Мulti-frequency Algorithm at Russian Software Package ASL L. Kogan, S. Likhachev, N. Kardashev, E. Fomalont, F. Owen, E. Greisen.
Australia Telescope Users Committee - Technologies Report - May 2008.
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Мulti-frequency Simulation of Space VLBI using VLA and VLBA L. Kogan, S. Likhachev, N. Kardashev, E. Fomalont, F. Owen, E. Greisen.
Correlators ( Backend System )
S. Likhachev (1), L, Kogan(2), E. Fomalont(2), F. Owen(2)
Observing Strategies for the Compact Array
Science Operations Phil Edwards | Head of Science Operations
The Development of Broadband VLBI Technologies in SHAO
Mattia Mercolino, ESA/ESOC
Radio Astronomy in Japan
From Russia with love!!!.
Early indications of performance
Prototype Correlator Testing
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
Australia Telescope Users Committee Technologies Report – October 2011
Presentation transcript:

ATCA and Mopra Phil Edwards

VSOP observations with ATCA 190 observations with Mopra

VSOP

ATCA Five of six antennas tied together for VLBI observations 8 GHz (since 1991), 22 GHz (since 2003) and 43 GHz (from 2007) bands SEFDs of ~430/n Jy at 8 GHz, ~530/n Jy at 22 GHz (n=no. of antennas) CABB will extend maximum bandwidth from 128 MHz to 2 GHz in 2008 Two 6 month semesters per year (Apr-Sep and Oct-Mar) C007 ATCA calibrators project ongoing

February 2007

Mopra 8 GHz (from 1991) and 22 GHz (from 1997) 43 GHz from 2008? Mm observing season runs from May to October Remote observing from Narrabri

Mopra or CA06 as a tracking station antenna? The segmented design concept has been successfully demonstrated But Mopra only available for <6 months of the year, CA06 only potentially available in compact configurations Source of funds not identified

ATNF Synthesis Imaging School

Looking forward to 2012!