Mike Fuqua Colby Janisch Ryan Kobos Steve Opsitnick Joey Tordella

Slides:



Advertisements
Similar presentations
1 Wire Harness Sealing Technology CTIS # Prepared By John Yurtin Updated Connection Systems Training.
Advertisements

Offshore Safety Cockpit of Tomorrow Offshore Safety Cockpit of Tomorrow Design Concept by: Sonny Hawkins and Tom Stanley Presentation by Tiger Performance.
1.Twist top casing to release top platform 2.Turn switch to on position 3.Wait 12 seconds for full injection 4.Turn switch to off position 5.Wait 4 minutes.
Sino Pipe Fitting Mould Co. is the professional and high classic pipe fitting mould manufacturers in the world. To consider the big moulds investment.
Air Release Valve Series ARV Product Education Course.
Caskets Cap Openings.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Kysor Panel Systems Product/ Tools Training
Tom’s Tips for Silencing Your Model “A” 2014 Missouri Valley Region Membership Meet.
© 2012 Delmar, Cengage Learning Engine Sealing, Gaskets, and Fastener Torque Chapter 51.
ModICE Modular Integrated Connector Enclosure
Lecture 2 SANDWICH COMPOSITES
Line of Products of Rain Pro/LOGIC Lindsay, California.
Plastics vs. Metals in Automobiles Greg Boehm Kendall Chapman Gordon Clarke II Gary Gomlak April 10, 2001.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Welcome to Flexco ® Rivet Hinged HEAVY-DUTY FASTENER SYSTEMS.
Ken YoussefiUC Berkeley 1 Design for Manufacturing and Assembly Design for manufacturing (DFM) is design based on minimizing the cost of production and/or.
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Product presentation. Solar Energy Content USP‘s Specification Design Technical Buildup / Concept Fastening Mounting –Fastening –System Installation Packaging.
Casing Spacers & End Seals
Project Presentation: The AccuDrill Company: AccuTools Inc.
Ken YoussefiUC Berkeley 1 Design for Manufacturing and Assembly Design for manufacturing (DFM) is design based on minimizing the cost of production and/or.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Presentation of Phase 3 Monday 12/11/2006 Nick DePompeo, Brian Hufe, Mike Sacra, Ben Stuchlik.
SE-4000 Portable Eye Wash Spray Fixture The Speakman Company University of Delaware Team: Wes Doyle Nate Griffith Matt Jaskot Jason McKnight.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Jigs and Fixtures.
BY DAVID HAFFEY IAN KARLE JACOB KENT
Machine design 2 Joints 1. loads mechanical  forces, moments… thermal  chemical changing in place/ time … static cyclic dynamic 2.
Heated Lavage Joe McFerron, Justin Miller, and Ashley Danicic Dr. Dinakar Golla, M.D Linda Huckenstein, R.N.
Die Cast – Nickel Die Cast – Black Metalized Plastic Black Plastic Grey Plastic Plastic - Assorted Colors –Available only on 972 Series.
Team West Pharmaceutical Services Sponsors: Reginald Motley and Chris Evans Advisor: Dr. Singh BMEG: Ryan O’Boyle, Madison DeFrank, and Derek Hunter MEEG:
Asahi/America Thermoplastic Check Valves Ball Check Valves ½” - 4”PVC, CPVC, PP, PVDF Uniseat/ Seal.
Hair Straightener Redesign
Cell Culture Stirrer for YSI Design overview: past and present New features Manufacturability improvements.
Integrated GPS and Shock Collar Housing Nathanael Skiver, Brent Berg, Blaine Hutchinson, and Ryan Pedersen Advised by: Dr. Peter Gorder and Dr. Valmiki.
Gaskets & Seals Nizwa College of Technology.
Hydro-Flex PIR Heat Reflective Polyurethane Topcoat Visit Us Toll Free:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Prefabricated Houses Steel structure prefab house system.
Calculating k Values for Pipe Insulation By Russell Peterson & Chris Mabey.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
Armaflex Solutions High Temperature and Solar Installations.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Total Filtration Services The audio portion of this session is being broadcast through your computer speakers. If you can’t hear anything, please look.
HT/Armaflex.
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
OptiLine Mini-trunking Safe and smoothly shaped – and a joy to work with.
Product Information Thermosyphon February 2012 Stefan Manglberger Head of Technical Services TiSUN GmbH HERZLICH WILLKOMMEN Welcome | Benvenuti | Bienvenue.
WALK-IN COOLERS & FREEZERS All contents of this presentation © Master-Bilt Products a division of Standex International, Inc.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
PLASTICS PRODUCT DESIGN.
ommitment to long-life _ from Durability ey structure for packaging _ from Structure roductivity & High quality _ from Balance pplication for various.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Glass Patio 51 Full glass balcony system
Gasket Fabricators Association Technical Committee Presentation Estimator’s Guide to Basic Gasketing Module 2 of 5 Material Selection December 2009.
Design for Manufacturing and Assembly
ModICE Modular Integrated Connector Enclosure
Permanent Lifting Magnets
“COMPANY PROFILE” R.B.S.ENTERPRISES Plot No. 22, Sector – 8,
WEEP or VENT HOLES, for drainage and venting
Warranty Details Product ID /Deal code Launch Type
Why InterTrade Industries
Piping Flow Maintenance
Clamping and Boring Tools
Single Detector Design
SCITEQ End closure series
PRESENTATION CONTENT INTRODUCTION USES DESIGN POTENTIAL STOCKISTS
Presentation transcript:

Mike Fuqua Colby Janisch Ryan Kobos Steve Opsitnick Joey Tordella SE-6000 Outdoor Safety Shower Shell Mike Fuqua Colby Janisch Ryan Kobos Steve Opsitnick Joey Tordella

Sponsor Goal / Project Scope Improve existing SE-6000 safety shower to be more appealing to market Reduce costs and labor Update/improve current design of SE-6000 Outdoor Safety Shower Focus on improving shell and seal Improve insulation

Current Shell Design 18 x 3’’ ID PVC pieces Long assembly time Difficult maintenance Custom made for various options

Wants and Requirements Speakman’s Requirements Easy Access Shell No painting Modular Weatherproof Retain durability Minimize cost Customer Wants

Key Metrics Rate of Importance

Benchmarks ABS plastic shell Vacuum molded Clamshell seal Pros Cons Easy assembly Less costly than PVC Cons Not watertight

Forming Methods Structural Foam Vacuum Forming Very precise High stiffness ratio Very expensive molding and tooling costs Vacuum Forming Accurate Low cost All necessary properties are possible

Sealing and Fastening Methods Gaskets K profile EPDM P profile EPDM High density PVC foam EPDM foam rubber Polyurethane foam rubber EPDM, Neoprene, and SBR foam Fasteners Latches Slide Pins Zip ties Spring loaded clamps Ratcheting ties Compression pins Bolt and Fastener

Concept Selection Vacuum formed outer casing ABS plastic Internal gasket seal Reusable nylon rivets Pre-slit Armacell pipe insulation

Exterior Shell Design Incorporate all options into shell Use rounded edges to avoid sharp corners Part mating

Sealing Testing Gaskets and grommets tested for water tightness under 4.5 GPM for 30 minutes

Sealing Selection ¾” wide by 1/8” thick EPDM Closed Cell Foam Strip Temperature rating -90o to 257oF Self adhesive backing: Temperature rating -40o to 250oF Rubber Lip Seal Grommet

Prototype Cheaper than existing shell by over $160/unit EPDM Gasket ABS Shell EPDM Gasket Foam Insulation Heat Tracing Tape Internal Pipe 3.25”

Prototype vs. Competition Similar shell design New innovative sealing method New fastening method Better sealing of protrusions >

Path Forward Fix problems with dimensions Test in outdoor environment Prepare assembly instructions to decrease factory installation issues and reduce production time Develop shipment method Begin production in spring 2006

Questions ? THE MOON RULZ #1