LIGO-G020480-03-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.

Slides:



Advertisements
Similar presentations
LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
Advertisements

LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
LIGO-G M LIGO - The Laser Interferometer Gravitational-wave Observatory Vibration and Facility Considerations (incomplete) Dennis Coyne TMT Vibration.
LIGO-G D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Annual Review 30 April 2001 Caltech.
G R LIGO Advanced System Test Interferometer LIGO Advanced R&D Review M. Zucker 8 October, 2002.
LIGO-G D Evaluation of EPI Approaches Dennis Coyne 18 April 2003 EPI Design Review #2.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
1 S4 Environmental Disturbances Robert Schofield, U of O John Worden, Richard McCarthy, Doug Cook, Hugh Radkins, LHO Josh Dalrymple, SU I.Pre-S4 “fixes”
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
Status of the LIGO Project
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO Magnetic External Pre-Isolator Richard Mittleman, David Ottaway & Gregg Harry April 18, 2003.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
S4 Environmental Disturbances Robert Schofield, U of O I.Pre-S4 “fixes” II.Some S4 veto issues III. Early coupling results from S4 PEM injections.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
LIGO-G M LIGO Status and Plans Barry Barish LSC Meeting 19-Aug-02.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M 1 Initial LIGO Seismic Isolation System Upgrade Dennis Coyne LIGO Seminar March 29, 2002.
LIGO-G D 1 MEPI electroMagnetic External Pre-Isolator Backup alternative to the Hydraulic actuator approach Goal: maximum commonality with HEPI.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
LIGO-G D Commissioning PAC11, 2001 Daniel Sigg, LIGO Hanford Observatory.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G v1 The LIGO Vacuum System and plans for LIGO-Australia Stan Whitcomb IndIGO - ACIGA meeting on LIGO-Australia 9 February 2011.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
22nd March 2005 LIGO-G R Passive attenuation for the LIGO Output mode cleaner; HAM SAS R. DeSalvo, S. Marka, V. Sannibale, A. Takamori, C. Torrie,
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Status of LIGO Aspen January, 2005 Nergis Mavalvala LIGO-G D Commissioning and detector improvements for S4.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO Commissioning Status
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
LIGO-G D Commissioning and Detector Plans Stan Whitcomb Program Advisory Committee 6 June 2003 Caltech.
LIGO-G W LIGO Detector Commissioning Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Operations Review 26 February 2001 LIGO Hanford Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
23/7/2003LIGO Document G C1 LIGO S2 Overview Philip Charlton California Institute of Technology On behalf of the LIGO Scientific Collaboration.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
LIGO-G D Commissioning P Fritschel LIGO NSF review, 23 October 2002 M.I.T.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
BSC HEPI Pier Amplification
Installation and Commissioning Status Stan Whitcomb
Commissioning the LIGO detectors
LIGO Detector Commissioning
Status of the LIGO Detectors
Status of LIGO Installation and Commissioning
LIGO Detector Commissioning
LIGO Advanced System Test Interferometer
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
HAM SAS Test Plan at LASTI
Presentation transcript:

LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002

LIGO-G M LIGO Laboratory2 Issue l Ground motion at LLO with the initial LIGO seismic isolation system makes it impossible to hold the interferometers locked reliably during the day » Steady-state ambient noise is higher due to anthropogenic sources » Transients, particularly from logging l Wind induced seismic noise at LHO: » exceeds locking threshold at ~25 mph, or 10% of the time » Expect that up-conversion is a problem at significantly lower wind speeds & a large fraction of the time l Upgrade is required to allow both reliable locking and to allow better noise performance while locked » Need 90% duty cycle & lock durations > 40 hours » Need to reduce noise in the control band (< 40 Hz) to permit a smaller suspension actuator authority & lower noise » Suppression in the 1-3 Hz band is most important due to excitation of the lower stack modes (Q ~ 30)

LIGO-G M LIGO Laboratory3 Scope Retrofit design »Original design included expansion capability for active control »No commercially available systems with acceptable performance »Accelerate the existing advanced LIGO R&D effort for an active pre-isolator –An LSC effort scientifically led by Joe Giaime (LSU) and Brian Lantz (Stanford) –Digital servo controls (flexibility & graceful degradation under failure) –Two alternative actuator designs »Install without disturbing in-situ optics alignment »BSC & HAM chambers »Prove performance with full scale prototypes at LASTI Active Isolation with the Fine Actuation Systems (FAS) on Test Mass chambers »Use of the FAS actuator for active control is known as PEPI: Piezo-electric External Pre- Isolation »PEPI is an interim solution for LLO; installed for S1 »PEPI is the planned solution for LHO Number of retrofit systems: »All chambers with suspended optics at LLO (8 systems) »Addition of PEPI systems to Test Mass and Mode Cleaner chambers at LHO (6 systems per interferometer)

LIGO-G M LIGO Laboratory4 External Pre-Isolator performance requirements Basic tenets: The pre-isolator must not increase the present noise in the GW-band, and Must bring the day LLO environment to the level of the LHO night environment.

LIGO-G M LIGO Laboratory5 Daily variability – and requirement Stuff REQUIREMENT (95% of the time)

LIGO-G M LIGO Laboratory6 Initial Vibration Isolation Systems HAM Chamber BSC Chamber »Reduce in-band seismic motion by orders of magnitude »Little or no attenuation below 10Hz; amplification at stack mode resonances »Large range actuation for initial alignment and drift compensation »Quiet actuation to correct for Earth tides and microseism at 0.15 Hz during observation

LIGO-G M LIGO Laboratory7 Seismic System Performance Horizontal Vertical HAM stack in air BSC stack in vacuum

LIGO-G M LIGO Laboratory8 Planned Initial Detector Modifications HAM BSC

LIGO-G M LIGO Laboratory9 Piezo-electric External Pre-Isolator (PEPI) Single (longitudinal) degree of freedom isolation Employs Fine Actuation System on End Test Mass Chambers (also used for Tidal and Microseismic control) Added to Input Test Masses at LLO for the S1 Run Baseline approach for LHO for S3

LIGO-G M LIGO Laboratory10 Actuators for an External Pre-Isolation (EPI) System Large range (300 microns p-p) required for tidal & microseismic correction »Goal of 1 mm for coarse positioning/alignment »Piezo-electric actuation may not be suitable Quiet Hydraulic Actuators »Hydraulic Wheatstone bridge »Used for precision diamond turning vibration isolation »High range, high stiffness, high bandwidth, high velocity »Developmental system (not commercially available) Electro-magnetic actuators »Different actuator (force instead of displacement) »Increased robustness of EPI solution – a second path »Familiar technology (in contrast to quiet hydraulics) »Reduced risk of contamination »Less complexity in power supply »Same performance requirements, mechanical superstructure, sensors »Concern regarding EM coupling to the magnets on the suspended optics

LIGO-G M LIGO Laboratory11 Hydraulic External Pre-Isolators (HEPI) Working fluid is high-viscosity fluid (glycerin/ethanol or mineral oil) Bellows hydraulic pistons apply force without sliding friction, moving seals Laminar-flow differential valves control forces Stabilized “power supply” is remote hydraulic pump with fluid-equivalent “RC” pressure filtering Technology adapted from precision machine tool applications

LIGO-G M LIGO Laboratory12 MEPI Installed on HAM at LASTI Alternative to the developmental hydraulic actuator Uses commercially available voice-coil actuator ‘Pin-compatible’ mechanically Simpler electronics ‘Soft’ mechanical back impedance

LIGO-G M LIGO Laboratory13 Status & Decision Points MEPI »Installed at LASTI & under Test »Interaction of HAM structural support modes with the control system may limit performance, add control complexity or cause us to consider structural modifications/additions »Initial MEPI/HAM Chamber results are promising; Hope to demonstrate control to required performance in the next 2 months HEPI »3 rd generation hydraulic actuator in test on the Stanford test stand »Pump station tests at CIT have demonstrated pressure noise performance requirements »Installation at LASTI to start in 2 weeks »Compliance of the BSC pier may likewise limit gain-bandwidth and performance »Initial test results are expected by early December Design Review & Long-Lead Procurement Review, Jan, 2003 »After prototype installation & some preliminary experience will decide whether to go forward with the hydraulic actuator or the electro-magnetic actuator »Commissioning will continue to improve performance and transition from dSpace to VME based controllers Installation start at LLO, April, 2003 »Following the S2 run