John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Lab 09: Performance Test 1 Advanced Energy Vehicle.
Lesson One – Introduction & History
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
John Wloch Wind-Aid Critical Design Review 4/22/2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
The exhibition process The phases of an exhibition.
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
© 2006 Atomic Ninja Design Atomic Ninja Design Presents Advanced Air Vehicles Ted House Veng Lee Jamison Bloechl.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
© 2006 Atomic Ninja Design Atomic Ninja Design Presents Advanced Air Vehicles Ted House Veng Lee Jamison Bloechl.
Foundations of Technology Technology Design Folio [TYPE TITLE HERE] [TYPE NAME HERE] Customize this PowerPoint Template to make it your own. Some slides.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Basic Electrical Circuits Advanced Design Applications Mr. Brooks.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Motors Make the world go ‘round By Jackson Greer, Room 305.
Status Report #3 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/6/2012 Design of an electronic system to track.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Cx Sequence of Events ICE ActivitiesOAC Activities Cx RFP Response to RFPOwner issues Cx contract Initialization Letter to Architect.
Chapter 20 Materials  Wednesday (Today)  Don’t miss the new WA that has been posted.  Today we work on Capacitors from Chapter 20  Look at the chapter.
Sound Therapy Noah Walcutt (ME) and Cindy Hlavacek (BME) Advised by Thomas Anderson, MA.
Kris Blair Nathan Edwards Jonathan Lindsay Daniel Moberly Jacob Rosenthal CUbiC Advisors: Sreekar Krishna and Troy McDaniel Wireless Haptic Belt Preliminary.
This semester you will use an engineer’s notebook to document the process that you will use to design a product. Your notebook will be organized and formatted.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Start Typical student project Advanced student project Level of final response.
Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 3/26/2012 Design an electronic system to track the distance of an object using Bluetooth.
PRACTICAL ELECTRONICS MASTERCLASS ASSEMBLY PRESENTATION (MR BELL) 1.
Project Meeting 12 Paul Capelli, Matt Bernstein, Jared Segal.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
The Proposed NHC/WFO Collaborative Watch/Warning Tool Shannon White Matt Belk Pablo Santos.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
IEEE’s Hands on Practical Electronics (HOPE) Lesson 10: Fabrication.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
ALICE Upgrade Construction management system Adriana Telesca ALICE MFT Plenary meeting 9 July 2015.
10/month is the present production rate 2 FTE + sporadic contributions
Advanced Energy Vehicle
ITEM 5 – ACTIVITY CODING LIST
Resistance and Ohm’s Law
P17082 Biomechanical Elbow Model Build and Test Prep
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
Done In Class – Wed April 6
Regional Technical Support Document
Presentation transcript:

John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp

Current Status – On Schedule Prototype assembly completed Prototype testing ongoing Wind-Aid Show Stoppers: Last week: high startup generator torque None at this time We are on schedule, per group and class project timetables

Wind-Aid High Startup Generator Torque 36 V with open circuit 10 ohm resistor, V, 20W achieved Sustained power Last Week—Show stopper found

Last Week Action Item 1: Completed initial documentation Documentation handed in on CD All necessary graphics have been completed Action Item 2: Electronic Circuits and Coding Multiple preliminary circuits created Final circuit started with focus on Tachometer Tachometer code near completion Wind-Aid

Next Week Action Item 1: Further Prototype Testing Gather more information Test advanced circuits Wind-Aid Action Item 2: Electronic circuits and coding Finish coding for Tachometer Finish constructing complete prototype circuit

Wind-Aid Questions?