ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Hongjie Zhang Purge gas flow impact on tritium permeation Integrated simulation on tritium permeation in the solid breeder unit FNST, August 18-20, 2009.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Idaho National Engineering and Environmental Laboratory Two Tube Failure Event for the Helium Cooled Blanket Lee Cadwallader and Brad Merrill INEEL Fusion.
Idaho National Engineering and Environmental Laboratory Safety Issues Related to Flibe/Ferritic Steel Blanket and Vacuum Vessel Placement Brad Merrill.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
SOL Vacuum Vessel FS Shield Gap Thickness (cm) FW Gap + Th. Insulator Winding Pack Plasma ≥  ≥ 149 cm | | Coil Case & Insulator Blanket.
1 LOCA/LOFA Analyses for LiPb/FS System Carl Martin, Jake Blanchard Fusion Technology Institute University of Wisconsin - Madison ARIES-CS Project Meeting.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
Idaho National Engineering and Environmental Laboratory Beryllium-Steam Reaction in Ceramic Blanket Brad Merrill and Lee Cadwallader Fusion Safety Program.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
June 16, 2004/ARR 1 Thermal-Hydraulic Study of ARIES-CS Ceramic Breeder Blanket Coupled with a Brayton Cycle Presented by A. R. Raffray With contributions.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
1 Wilfrid Farabolini 23 feb. 04Direction de l’Energie Nucléaire Tritium Control A Major Issue for a Liquid Metal Blanket.
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Idaho National Engineering and Environmental Laboratory Safety Related Design Issues Brad Merrill, Dave Petti, Lee Cadwallader Fusion Safety Program ARIES.
LOCA/LOFA Analyses for Blanket and Shield Only Regions – LiPb/FS/He System Carl Martin, Jake Blanchard Fusion Technology Institute University of Wisconsin.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Safety Considerations for the EU DCLL DEMO Blanket Dario Carloni 2nd EU-US DCLL Workshop 14-15th November 2014 UCLA.
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Oxidation of Graphite Walls: Preliminary Results from SOMBRERO Safety Analysis S. Reyes, J. F. Latkowski Lawrence Livermore National Laboratory Laser IFE.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
ARIES Meeting University of Wisconsin, June 15 th, 2005 Brad Merrill, 1 Siegfried Malang 2 1 Fusion Safety Program 2 ARIES Consultant Tritium Permeation.
Accident assessment for DCLL DEMO design Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA March 2-4, 2005 Work performed under the auspices of the.
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Design Basis Accidents (DBA) M. T. Porfiri – ENEA UTFUS-TECN (Frascati)
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
R&D for Tritium and Safety Issues in Lead- Lithium Breeders Idaho National Laboratory, June 11 th, 2007 Brad Merrill, 1 Clement Wong 2 1 Fusion Safety.
Investigation into the Viability of a Passively Active Decay Heat Removal System In ALLEGRO Laura Carroll, Graduate Physicist Physics & Licensing Team,
TBM WG Meeting UCLA, March 2-4, 2005 Brad Merrill/Fusion Safety Program DCLL TBM Safety Update.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Finite Elements Modelling of Tritium Permeation
Vessel Vacuum Tritium Permeation & PbLi/Water Safety Issues Paul Humrickhouse INL Fusion Safety Program October 13 th -14 th, 2011 ARIES Meeting Gaithersburg,
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Tritium and Safety Issues for Power Plants Lee Cadwallader Fusion Safety Program ARIES Meeting Bethesda, MD April 4-5, 2011.
IAEA Meeting on INPRO Collaborative Project “Performance Assessment of Passive Gaseous Provisions (PGAP)” December, 2011, Vienna A.K. Nayak, PhD.
ITER and Fusion Safety Aspects H.-W. Bartels, ITER Prague, 13.November 2006.
ERMSAR 2012, Cologne March 21 – 23, 2012 ESTIMATION OF THERMAL-HYDRAULIC LOADING FOR VVER-1000 UNDER SEVERE ACCIDENT SCENARIO Barun Chatterjee 1, Deb Mukhopadhyay.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
ERMSAR 2012, Cologne March 21 – 23, 2012 Analysis of Corium Behavior in the Lower Plenum of the Reactor Vessel during a Severe Accident Rae-Joon Park,
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Helium-Cooled Divertor Options and Analysis
Kick off meeting EFDA Task TW6-TSL-002 Garching 9th/10/2006 ENEA Overview of the task and coordination: refined description of the accident sequences,
FNST Meeting UCLA, August 12 th -14 th, 2008 Brad Merrill 1, Phil Sharpe 1, Dai-Kai Sze 2 1 INL Fusion Safety Program 2 UCSD Tritium Permeation in HCLL/DCLL.
Tritium Permeation Issue, Plan and Progress Dai-Kai Sze University of California, San Diego Presented at the ITER TBM Project Meeting UCLA, Feb ,
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
MELCOR model development for ARIES Safety Analysis
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Integrated Design: APEX-Solid Wall FW-Blanket
Status of ARIES-CS Power Core Engineering
ACT1 LOFA model updates and LOCA analyses
Preliminary Analysis of Loss of Vacuum Events in ARIES-RS
University of California, San Diego
Presentation transcript:

ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS

Presentation Outline Describe the details of a MELCOR model under development for the ARIES-CS dual coolant blanket concept Present MELCOR results for reactor startup Present the results of a decay heat removal analysis for a complete loss-of-flow-accident (CLOFA) as a benchmarking exercise for our MELCOR model Discuss possible accident scenarios that must be considered in assessing the safety of ARIES-CS Present results for two vacuum vessel (VV) pressurization accidents with the use of the ARIES-CS MELCOR model Conclude by discussing future modeling requirements and analyses

Modeling Assumptions and Parameters Modeled one-half a field period segment (1/6 th of three field period reactor) –First wall surface area 1/6 of plasma surface area ~ 135 m 2 –Applied first wall heat flux of 0.5 MW/m 2 –Total operating thermal power for model ~ 372 MW –Decay heat (obtained from “Initial Activation Assessment for ARIES Compact Stellarator Power Plant” paper ~ 10 MW at shutdown and 3 MW at 60 s) –Radial build based on Laila’s Nov. 11 th radial compositions and an ARIES-ST unit blanket cell Helium Loop (~115 m 3 ) –Pressure 8 MPa and inlet /outlet temperature 300/480 °C –Mass ratio (external /in-vessel) ~ 7 to maintain He velocities below 40 m/s in piping PbLi Loop (~255 m 3 ) –Pressure 4 MPa and inlet /outlet temperature 460/700 °C –Mass ratio (external /in-vessel) ~ 4 (assumed from previous studies) Loop configurations based on ARIES-AT confinement building

Header PbLi drain tank Heat transfer vault HXs Pump Circ. MELCOR Model Elevations Based on ARIES-AT ( Need similar information for ARIES-CS)

MELCOR ARIES-CS Model Schematic He toroidal header He concentric pipe PbLi toroidal header PbLi concentric pipe PbLi heat exchanger He heat exchanger IB Shield VV IB blanketOB blanketOB Shield FW Zone 1 Zone 2

Startup Transient Predictions Fluid temperatures Structure temperatures Time (hr) Temperature (°C) PbLi outlet temp PbLi inlet temp Helium outlet temp Helium inlet temp dT/dt ~ 0.8 °C/s PWRs allow ~.008 °C/s => ~ 4 MW to heat loops Time (hr) First wall Ribs of blanket Temperature (°C)

CLOFA Decay Heat Removal Shutdown and complete loss of active cooling flow occurs, with the VV cooling system entering a natural convection mode Latent heat re-distribution results in FW temperature of ~ 630 °C (lower than 730°C predicted by Carl, perhaps due to flow coast down) By 3 hours the temperatures start to decay At ~26 hours the PbLi loop natural convection increases Time (hr) Temperature (°C) First Wall PbLi Back Wall Shield Vacuum Vessel OB blanket IB blanket Time (hr) Mass Flow (kg/sec) Loop

Possible Reference Accidents In-vessel helium or water loss-of-coolant accident (LOCA) analysis to demonstrate: –Pressurization does not fail first confinement barrier (i.e., ARIES-CS vacuum vessel) –Limited chemical reactions and hydrogen formation (exclude water or limit PbLi) In-blanket (breeder zone) helium LOCA analysis to assess: –Blanket and tritium purge gas system pressurization –Subsequent in-vessel leakage Ex-vessel helium and PbLi LOCA analysis to determine: –Pressurization of reactor or HTS vault is tolerable –Behavior of FW/blanket without active plasma shutdown These accidents are the most likely confinement bypass event initiators because of confinement barrier over-pressurization; it must be demonstrated that for all three events the dose at the site boundary does not exceed 10 mSv for all radioactive sources combined (dust, FW oxidation, Po-210, and tritium)

Pressurization of Module Maintenance Vacuum Vessel Two pressurization accidents were considered A single FW channel rupture ( m 2 ) Helium inlet header (0.04 m 2 ) Design basis events with probabilities in the ~ 1x10 -3 /year range Free volume within the vacuum vessel (VV) was set at plasma volume of ~535 m 3 Immediate plasma shutdown occurs, but radiant collapse was not included

Pressurization of Module Maintenance Vacuum Vessel Shutdown and loss- of-coolant occurs after 1 hour, and VV cooling enters natural convection mode Pressures reach > 18 atmospheres within seconds after the large break while the small break takes ~ 5 minutes to reach 18 atmospheres A pressure relief system will be required for this VV option Time (hr) Pressure (atm) Break size = m 2 Break size = 0.04 m 2

Pressurization of Period Maintenance Vacuum Vessel Two pressurization accidents were considered A single FW channel rupture ( m 2 ) Helium inlet header (0.04 m 2 ) Design basis events with probabilities in the 1x10 -3 /year range Free volume within the vacuum vessel (VV) was set at plasma volume of ~7000 m 3 Immediate plasma shutdown occurs, but radiant collapse was not included

Shutdown and loss-of- coolant occurs after 1 hour, and VV cooling enters natural convection mode Pressures reach ~ 2.0 atmospheres within seconds for the large break while the small break takes ~ 10 minutes to reach 2.0 atmospheres A pressure relief system may not be required for this VV option However, decay heat removal may be an issue Pressurization of Period Maintenance Vacuum Vessel Time (hr) Pressure (atm) Break size = m 2 Break size = 0.04 m 2

Results Summary A decision must be made on which accidents will be selected as Reference Accident Scenarios (pressurization, decay heat removal, and hydrogen generation are concerns) Models are being developed to analyze releases during adopted Reference Accident Scenarios, but more design information and benchmarking is required Decay heat removal analysis suggests temperatures somewhat less than Carl’s analyses, and this difference must be investigated further The VV is the primary confinement barrier and design basis pressurization events must not fail this boundary –The small VV for the module maintenance scheme will not work without an expansion volume available (will also be part of primary confinement boundary) –The large VV for the sector maintenance scheme is very attractive as a primary confinement barrier, if the decay heat removal problem can be addressed

Future Analysis Requirements MELCOR in-blanket (LOCA) model may have to be developed based on choice of tritium and Po-210 (or Bi-208) extraction systems (low or high pressure extraction systems) Tritium inventory, permeation, and accident releases –Annual release limit (0.1 g-T as HTO/a – ITER to 8 g-T as HTO/a – FIRE) translates into an in- building permeation limit of between ~10 to 800 g-T/a, assuming a 99% efficient tritium cleanup system –To meet this limit the tritium extraction method proposed by Siegfried Malang, which is a vacuum permeator (Nb tubes), is proposed for the PbLi to lower the T 2 concentration to levels (produce pressures above PbLi < 0.2 Pa) where losses to the building are below the annual release limit –Will need tritium production rates A TMAP model should be developed to examine tritium permeation in the blanket and from the cooling systems, and to estimate tritium accident mobilization rates Need estimates of VV PFC erosion dust and FW activation product inventories ARIES-AT PFC dust and Po-210 inventories will be used for accident source terms This information will feed into MELCOR LOCA and LOVA predictions for radioactive release estimates and site boundary dose predictions