COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday,

Slides:



Advertisements
Similar presentations
EPA’s Underground Injection Control Program
Advertisements

What’s in a Name: EPA Region VIII’s (Non-)Application of the E&P Exemption to Natural Gas Condensate
Railroad Commission of Texas Victor G. Carrillo - Chairman Elizabeth A. Jones – Commissioner Michael L. Williams – Commissioner.
EPA’s Proposed Rules for Geo-Sequestration of CO 2 Ben Knape Texas Commission on Environmental Quality.
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
UIC Permit Applications: Technical Review & Public Notification
Field Operations and State-Managed Plugging Overview
Hydraulic Fracturing under Senate Bill 4. Senate Bill 4 - Approved September 20, Requires a permit to conduct a well stimulation treatment, such.
“Sustainable Water Management in the Oil and Gas Industry” John Tintera PG #325 Blythe Lyons Katie Carmichael Texas Alliance of Energy Producers.
Drilling Gas Wells: Beginning to End. Seismic Exploration.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Risk-Based Regulation.
Environmental Regulation and Hydraulic Fracturing in California
CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
The Underground Injection Control (UIC) Program Presentation for the Radionuclide Webcast August 4, pm.
Joseph S. Ball, Jr. Louisiana Underground Injection Control Program Workshop Introduction.
Performance Audit (May 2014) Office of Conservation, DNR Oil and Gas Program Concluded (among others): o Does not perform appropriate routine inspections.
Railroad Commission March 24, 2008 Charles Ross, PE Deputy Director, Field Operations Oil and Gas Division Railroad Commission of Texas
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
August 14, 2001AOGCC / Jt. Committee on Natural Gas Pipelines 1 Alaska Oil and Gas Conservation Commission (AOGCC) Presentation August 14, 2001 to Joint.
EPAs Proposed Ground Water Protection Standards 40 CFR 192 an Industry Perspective Peter Luthiger Mesteña Uranium LLC.
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
Virginia Department of Mines, Minerals and Energy
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
1 Underground Injection Control (UIC) Program Rules.
Copyright © 2014 Holland & Knight LLP. All Rights Reserved Injection Well Regulation in Texas June 2014 Fred Stovall.
8/27/2015 ENDANGERING TYPES OF CLASS V WELLS GEOLOGY SECTION 2012 SEMINAR September 6, 2012 Wichita, KS.
The Injection Connection: A Regulatory Framework for Geologic Sequestration of Anthropogenic Carbon Dioxide  2010 Diane Perkins All Rights Reserved.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
The Underground Injection Control (UIC) Program
RAILROAD COMMISSION OF TEXAS CO 2 Storage Dave Hill 1.
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Developing Green Stormwater Design Solutions For UIC Compliance Presented by: Adam Zucker PE, CWRE 819 SE Morrison Street ● Suite 310 ● Portland, Oregon.
EPA’s Proposed Geologic Sequestration Rule  Administrator Johnson signed July 15, 2008  120 day comment period  Final rule in 2010 or 2011.
Department of Conservation Division of Oil, Gas, and Geothermal Resources Underground Injection Control Program Common Reasons for Injection.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
Revised Definition of Solid Waste Rule Jesse Boultinghouse Waste Permits Division May 6, 2015 TCEQ Environmental Trade Fair.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Ch WAC Geologic Sequestration of Carbon dioxide John Stormon Hydrogeologist Washington Department of Ecology Seattle, WA October.
Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption Jeff Bowman, TEEX.
RAILROAD COMMISSION OF TEXAS CO 2 Sequestration Dave Hill 1.
RAILROAD COMMISSION OF TEXAS Groundwater Protection Determination Letters Norman Gearhart, P.G. Manager Groundwater Advisory Unit.
Thom KerrNovember 17, 2015 Colorado’s Continuous Adjustment to Unconventional Resource Development.
Radioactive Materials Licensing Authorizing licenses for: Low-level radioactive waste disposal By-product material disposal Public water system NORM waste.
Hydraulic Fracturing (Fracking)
W HEN F RACKING I SN ' T C ALLED F RACKING : Flawed Well Stimulation Definition in Proposed State Oil Legislation (HB 191/SB 318) Excludes Most Common.
Waste Associated with a Drilling Operation Kelley Goes, Esquire 500 Lee Street East, Suite 1600, Charleston, WV Phone:
Political Backdrop As non-geologists and seeming without Professional Geology consultation individuals make the following types of comments: "We have a.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Texas Inactive Well Regulations April Texas Inactive Well Regulations In September 2010, the RRC amended statewide rules 1, 14, 21, and 78 and adopted.
Oil & Gas Waste Stream Management and Permitting Options
Chairman Christi Craddick
2017 Environmental Trade Fair Shannon Gibson
Introduction to the Definition of Solid Waste Final Rule
Prioritizing Fossil Fuel Production over Drinking Water
Class I Injection Well Application Issues
Resource Conservation and Recovery Act (RCRA)
Texas Disposal Well Rules And Seismicity Leslie Savage, P.G.
How Well is Your Well? UIC Class I Well Construction Standards
2018 Environmental Trade Fair Shannon Gibson
Meandering Through RRC & TCEQ’s Current MOU David W. Cooney, Jr.
UIC Inspection and Compliance Team
Presentation transcript:

COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday, October 7, 2010 David Andrews, P.E., P.G. Western Colorado Engineering Supervisor

FEDERAL UNDERGROUND INJECTION CONTROL (UIC) REGULATIONS 40 CFR 144 – Underground Injection Control Program 40 CFR 145 – State UIC Program Requirements 40 CFR 146 – Underground Injection Control Program: Criteria and Standards 40 CFR 147 – State, Tribal, and EPA-Administered Underground Injection Control Programs Subpart G - Colorado Spinoff of Safe Drinking Water Act Major objective of this whole program is the protection of drinking water Part 147, Subpart G is codification of Colorado’s primacy

UIC WELL CLASSES All underground injection wells are regulated by the U.S. EPA Class I: wells used to inject hazardous waste or industrial waste below an Underground Source of Drinking Water (USDW) Class II: wells used to dispose of exempt oil or gas waste fluids or wells used for enhanced oil recovery Class III: wells used for solution mining Class IV: wells used to inject hazardous waste or industrial waste above a USDW (banned except for those which are part of an EPA or state approved CERCLA or RCRA project) Class V: all others or wells used to inject nonhazardous fluid into a USDW Proposed Class VI: wells used for underground injection of carbon dioxide for sequestration - will be six classes of wells Class IV wells are now banned – some exist as part of cleanup projects CO2 sequestration is proposed as Class VI (currently Class V) Class II wells are oil and gas – what I will talk about

STATE PRIMACY U.S. EPA often delegates regulation of UIC wells to individual states (primacy) U.S. EPA delegated primacy to COGCC for Class II UIC wells on April 2, 1984 U.S. EPA sometimes delegates primacy for other classes of wells to individual states (e.g., Wyoming has primacy over some Class V wells) In Colorado, only Class II wells have been granted primacy We have been doing this for 25 years We issue about 35 permits per year

COLORADO STATISTICS COGCC currently regulates more than 800 Class II UIC wells in Colorado. Approximately three-quarters of these wells are enhanced recovery wells We have a lot of wells Disposal wells are for the injection of water as a disposal mechanism, enhanced recovery wells are for the injection of water in order to force oil and gas out of other wells in field more demand because less places to put water

COLORADO REGULATIONS Rule 325 defines notice requirements for Class II UIC wells: Written notice to surface owners and mineral owners is required within ¼ mile of the injection well. The notification distance increases to ½ mile for any mineral owners that produce oil or gas from the injection zone. Single-well permits are typically submitted for Class II disposal wells, but COGCC’s rules accommodate applications for multiple well units, which are often necessary for enhanced recovery operations. COGCC publishes disposal well notices in a local newspaper announcing a 30-day public comment period. Application submittals are listed in our rules These are highlights – we have a checklist with about 30 required items of sumbitta If the total dissolved solids is below 10,000 ppm, the formation has the potential to be considered an aquifer

COLORADO REGULATIONS Rule 325 requires submittal of downhole construction methods, surface facility information, and a list of Class II waste sources: Packer, tubing, casing, and cement design details which demonstrate how the operator will maintain mechanical integrity of the well and ensure that injected fluids will be confined to the injection formation. A surface facility diagram showing all pipelines and tanks associated with the injection system. A list of all sources of Class II fluids to be injected, by lease and well. Anticipated injection rates and pressures. Application submittals are listed in our rules These are highlights – we have a checklist with about 30 required items of sumbitta If the total dissolved solids is below 10,000 ppm, the formation has the potential to be considered an aquifer

Casing and Cement Design (Conductor)

Casing and Cement Design (Surface)

Casing and Cement Design (Production)

- Cement must cover aquifers and top of hole

COLORADO REGULATIONS Rule 325 requires a successful Mechanical Integrity Test (MIT) prior to approval of a UIC application, and Rule 326.a. defines MIT requirements for UIC wells. 5-year MIT’s (pressure tests) on the tubing-casing annulus or monthly pressure monitoring events are performed to determine whether significant leaks are present in the packer, tubing, or casing. Tracer surveys, cement bond logs, and/or temperature surveys are also required to determine whether there are significant vertical fluid movements above or below the injection formation. Injected fluids must be confined to the injection formation. If a UIC well lacks mechanical integrity, the operator must immediately cease injection. Injection cannot resume until the well is repaired and pressure tested. Application submittals are listed in our rules These are highlights – we have a checklist with about 30 required items of sumbitta If the total dissolved solids is below 10,000 ppm, the formation has the potential to be considered an aquifer

COLORADO REGULATIONS Rule 324B defines requirements for aquifer exemptions Water quality test data is required from the disposal formation. If total dissolved solids (TDS) is greater than 3,000 milligrams per liter (mg/l) and less than 10,000 mg/l, then an aquifer exemption is required in addition to a UIC permit application. COGCC publishes notices of aquifer exemption requests in a local newspaper for a 30-day public comment period. The notice is also forwarded to U.S. EPA for their review. -reasons to grant aquifer expemptions – this water isn’t really going to be used as drinking water -This public notice specifically lists which of these reasons exemption is being sought

COLORADO REGULATIONS Aquifer exemptions are granted for formations that are not currently used as a source of drinking water and meet one of the following criteria: The formation contains commercially producible minerals or hydrocarbons; The formation is so deep that recovery of water for drinking water purposes is economically or technologically impractical; or, The formation is so contaminated that it would be economically or technologically impractical to render the water fit for human consumption. Aquifer exemptions are not approved for formations with TDS equal to or less than 3,000 mg/l TDS. -reasons to grant aquifer expemptions – this water isn’t really going to be used as drinking water -This public notice specifically lists which of these reasons exemption is being sought

UIC PERMIT APPLICATION REVIEW COGCC local engineering staff reviews Form 2 (Application for Permit to Drill, Deepen, Re-Enter, or Recomplete). Form 2 review is intended to verify that casing and cement design is adequate to ensure that groundwater aquifers, hydrocarbon production zones, and the injection formations are isolated from each other to prevent cross-migration of fluids between each zone. -31 is for formation -33 is for well -26 lists where injected water is coming from – requires water analysis -Division of Water Resources is our expertise for evaluating that the well will not contaminate any aquifers or drinking water wells in area ¼-mile AOR – I will discuss in a bit

UIC PERMIT APPLICATION REVIEW COGCC’s UIC Engineering Supervisor reviews Form 4 (optional, Sundry Notice request to perform injectivity test), Form 31 (Underground Injection Formation Permit Application), Form 33 (Injection Well Permit Application), Form 21 (Mechanical Integrity Test), and Form 26 (Source of Produced Water for Disposal). Form 4 review defines testing limits (duration and volume) to ensure that the injectivity test approval does not authorize continuous injection. -31 is for formation -33 is for well -26 lists where injected water is coming from – requires water analysis -Division of Water Resources is our expertise for evaluating that the well will not contaminate any aquifers or drinking water wells in area ¼-mile AOR – I will discuss in a bit

UIC PERMIT APPLICATION REVIEW During the Form 31, Form 33, and Form 26 review, COGCC evaluates well construction details and injection formation water sample results. COGCC submits a request to the Division of Water Resources for their opinion regarding the well construction and its ability to protect groundwater resources. COGCC reviews well construction details for all oil and gas and water wells within ¼ mile of the proposed injection well. If necessary to ensure protection of groundwater aquifers and hydrocarbon zones, remedial work on offset wells may be required by COGCC. -31 is for formation -33 is for well -26 lists where injected water is coming from – requires water analysis -Division of Water Resources is our expertise for evaluating that the well will not contaminate any aquifers or drinking water wells in area ¼-mile AOR – I will discuss in a bit

Importance of AOR Below injection pressure curve fluid can move upward from injection zone into aquifer We require dry holes to be properly cemented to prevent this

UIC PERMIT APPLICATION REVIEW COGCC reviews all mineral and surface owner notifications and the surface owner agreement or the BLM Sundry Notice which authorizes surface use of the facility for injection of Class II waste. COGCC evaluates the technical merit of all protests and public hearing requests. COGCC hearings may be scheduled for any protests that demonstrate that the proposed injection well has the potential to cause injury to mineral or groundwater resources. notifications must be hand-delivered or sent by registered or certified mail Permit review process does not begin without Bureau of Land Management sundry (BLM land) or Surface Use Agreement (other land) We take pubic hearings on a injection wells Not everyone automatically gets a public hearing If protests are of land use, such as traffic, we refer them to the county

STANDARD CONDITIONS OF APPROVAL All UIC permits are approved with the following stipulations: COGCC requires financial assurance for plugging and well reclamation. Additional financial assurance is required for surface facilities at commercial injection sites. COGCC assigns a maximum allowable pressure for continuous injection, which is set below formation fracturing pressure. COGCC assigns a maximum allowable injection volume for disposal wells, which is calculated to hold the pore volume within a radius of influence of ¼ mile. There are no volume restrictions for enhanced recovery wells. Operators must monitor and report injected water volumes on a monthly basis, and water samples are required periodically to monitor any significant TDS changes in the injected fluids. - Mechanical Integrity Test must be to injection pressure enhanced recovery wells have oil and gas coming out as water goes in therefore no volume limit I’ll talk more about casing

UIC ENFORCEMENT All UIC wells (disposal wells and enhanced recovery wells) are inspected annually. Injection pressures and annular pressures are checked for anomalies and recorded. Pressure anomalies may indicate that a leak has developed and the packer, tubing, or casing lacks mechanical integrity. MIT’s are performed on all UIC wells every five years. Failed MIT’s are an indicator that a packer, tubing, or casing leak may be present. Notices of Alleged Violation are issued for any UIC wells that lack mechanical integrity. Operators are required to shut-in these wells until repairs are made or the wells are plugged and abandoned. - EPA requires state to witness 25% of Mechanical Integrity Testss. We witness over 50%.

CLASS II WASTE EXEPTIONS ARE DEPENDENT ON THE FLUID SOURCE, NOT ITS CHEMISTRY Class II waste includes waste materials that are intrinsically derived from primary field operations associated with the exploration, development, or production of crude oil and natural gas. “Because the RCRA exempt status of an oilfield waste is based on the relationship of the waste to E&P operations, and not on the chemical nature of the waste, it is possible for an exempt waste and a non-exempt hazardous waste to be chemically very similar.” - It is how waste is generated that defines E&P waste (RCRA exemption)

CLASS II EXEMPT E&P WASTES Drilling fluids Rig wash Produced water Spent well completion, treatment, and stimulation fluids Accumulations and deposits in tanks and pipelines used to store or transport Class II exempt wastes. Gas plant dehydration and sweetening wastes - Things that can be injected

NON-EXEMPT WASTES Unused fracturing fluids or acids Painting wastes Waste solvents Refinery wastes Used equipment lubricating oils and hydraulic fluids Sanitary wastes Pesticide wastes Radioactive tracer wastes - Things that cannot be injected

Colorado Oil and Gas Conservation Commission Questions Denise M. Onyskiw, P.E. Colorado Oil and Gas Conservation Commission 303-894-2100 ext. 5145 Denise.Onyskiw@state.co.us