Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

TS01 Klystron Modulator Minh Nguyen May 20, 2014 Beam Voltage Stability Improvements.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Status of the MICE Amplifier
RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Electrical & Control Power Supplies Trevor Hartnett.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
L-band test stations in End Station B Richard Swent.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
Circuits Chapter 17.3 Notes. What are circuits? An electric circuit is a set of electrical components connected such that they provide one or more complete.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
MICE RF System Power Supplies, Control and Monitoring Status report
Electrical & Control.
Analog FE circuitry simulation
RF Status 1 4 High Power Amplifier circuits available CERN(2)
POPS Strategy for Restarting & Repairing
PL testing PL device : Chap 7 performance test Equipments 4 tests
PL testing PL31xx data book Chapter 7
Presentation transcript:

Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett

Initial inspections of 4616 circuits LBL equipment arrives Jan 05 Initial inspections 4616 circuits look ok !

Solid state pre drivers ISIS and CERN use Dressler 4.5KW amps Currently these are not available, although this may change Companies in the UK and US have indicated they can produce them ( ~ $70K) Only issue may be the cost, although the original Dressler units were not cheap RAL specification has been sent to a UK company for a price quote Possiblity of MICE, RAL, CERN ? group buy

HT for 4616 New charging PSU’s will be ordered ~ 3k Crowbar switches including firing circuits e2v ~ 14K, ABB ~ 15K Capacitor bank 22uF 40KV PPM ~ 5k Construction costs Visit to CERN to assess obsolete HT equipment, systems were not suitable for MICE, but would be ok as a test set. Orders for charging unit, cap bank and crowbar unit about to be made

ALE 152A 20 kV 1500 J/s charge rate £ μF Capacitor £4102

Crowbar System Two Choices e2v MA3536A Thyratron based. Max HT 25 kV Peak Current 10 kA Price £13,500 ABB Crowbar Switch Semiconductor stack Max HT 20 kV Peak Current 5.5 kA £14,925

e2v MA3536A ABB(52 kVshown) Crowbars

4616 Test set-up AmplifierDirectional Monitor coupler Water load 2.5MW 12 foot long 3 1/8 “ coax 9 3/16 “ coax 9 3/16 “ - 3 1/8” Coax reducer High Power Coaxial Components

Complete System ( TH116) high power test set-up 4616 AmplifierTH116 Amplifier 3 1/8 “ coax9 3/16 “ coax Water load 2.5MW 12 foot long

Items required in the short term 3 1/8” – 9 3/16” coax reducer (to allow 9 3/16” water load to be used on 4616 tests) - £2 k Directional Coupler - £1.7 k x 2 Water Load - £12.2 k Various straights / Bends ~ £10 k Power meters – use existing HP power meters Total = £25.6 k

4616 circuit strip down 4616 tubes sent to RAL for testing Manufacturer's expect the tubes will be U/S New tubes around $40K Sockets look in good condition, possibly only need new finger strip ½ wavelength input couplers tested ok at RAL Original cabinets will be repainted with new panels where needed

MICE test area In an existing plant room Large electrical and water supplies Room to expand if necessary

Services Electrical Dept ready to design and construct power requirements Visit to RAL to see systems in action Water services close by under floor duct Construction of test water panel by Oct 05 Original piping of the circuits looks ok, but will be assessed

The plan Majority of work this year will be on 4616 circuits Expect to run first circuit by the end of the year into a test load Purchase of components to test 1MW systems may be possible, water loads etc 1MW amplifiers will not be striped down this year Still no indication of when TH116 will become available Cost of refurbishment items looks broadly similar to original costing, work continues in this area