1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.

Slides:



Advertisements
Similar presentations
SiTPC status in Saclay David Attié SiTPC Phone Meeting,
Advertisements

20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.
Detector R&D Jan Timmermans Programme: ≥ 2003
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
D. Attié, A. Chaus, P. Colas, X. Coppolani, E. Delagnes, M. Riallot, M. Titov Saclay, January 5 th, 2012 Status of the R&D in micropixel detectors at Irfu.
Highlights from the Tracking Sessions 12 talks in three sessions Rough accounting: ILD SiD Generic OR- Gaseous Solid State
Status ‘Si readout’ TPC at NIKHEF NIKHEFAuke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans Jan Visschers Saclay CEA.
Recent progress towards a Pixel-TPC 1. Objectives 2. New Structures (Ingrid,Twingrid,…) + Discharge Protection 3. Gas Studies 4. Testbeam at DESY (Medipix+3GEM)
ECFA Meeting, Valencia – November 8, First TimePix tests at CERN David Attié ECFA Meeting – Valencia – 8 November 2006.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
1 Silicon Pixel Readout for a TPC ALCPG Fermilab 23 October 2007 Jan Timmermans NIKHEF.
Annual Meeting – October 8, Status of the CEA Saclay R&D activities on pixelised readout of TPC David Attié, Paul Colas,
Timepix-3 test All-ceramic InGrid The focusing TPC
A. Chaus, D. Attie, P. Colas, M. Titov CEA Saclay, Irfu/SPP, France Ingrid OUTLINE: OUTLINE:  “Octopuce” Uniformity Studies in the Laboratory  DESY Test-Beam.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Annual Meeting 2008 – October 6 th 1 David Attié P. Colas, X. Coppolani, E. Delagnes, A. Giganon, I. Giomataris Status of Saclay.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
Timepix at NIKHEFMedipix meeting, CERN – Some recents results at NIKHEF M. Chefdeville, E. Bilevych, H. van de Graaf, J. Timmermans D. Attié,
1 Readout of a TPC by Means of the MediPix CMOS Pixel Sensor NIKHEFAuke-Pieter Colijn Arno Aarts Alessandro Fornaini Maximilien Chefdeville Harry van der.
O.Bezshyyko, 2-nd French-Ukrainian workshop on the instrumentation developments for HEP, October 1-3, Orsay Taras Shevchenko National University of Kyiv.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
you me  when it all started to work  progress made  outlook.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
1 Some results with NIKHEF Ingrids at DESY test beams EUDET Annual meeting 29 September 2010 Jan Timmermans NIKHEF/DESY.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Snowmass, August, 2005P. Colas - InGrid1 M. Chefdeville a, P. Colas b, Y. Giomataris b, H. van der Graaf a, E.H.M.Heijne c, S.van der Putten a, C. Salm.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 Status ‘Si readout’ TPC at NIKHEF NIKHEFMaximilien Chefdeville Auke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans.
Micromegas (Ingrid)+TimePix 8-chip modules
1 The Silicon TPC System EUDET Extended SC meeting 1 September 2008 Jan Timmermans NIKHEF.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
EUDET Meeting, Munich – October 18, Ongoing activities at Saclay David Attié D. Burke; P. Colas; E. Delagnes; A. Giganon; Y. Giomataris;
November 8, 2006ECFA ILC Workshop1 Recent developments for digital TPC readout Jan Timmermans - NIKHEF Micro Pattern Gas Detector: GridPix Integration.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
GEM+Timepix2 in the framework of project Gabriele Croci, Matteo Alfonsi on behalf of CERN-GDD Group RD51 Miniweek, February 2010.
1 The Silicon TPC System EUDET Extended SC meeting 27 August 2007 Jan Timmermans NIKHEF.
LCWS Bangalore, March 13, 2006 P. Colas, Digital TPC R&D1 R&D for a digital TPC The SiTPC project The digital TPC concept and advantages VLSI electronics:
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
1 The Silicon TPC System The “final” status report EUDET Annual meeting 30 September 2010 Jan Timmermans NIKHEF/DESY.
Status report NIKHEF NIKHEFAuke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans Jan Visschers Saclay CEA DAPNIAMaximilien.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
Micromegas projects and future tests Phone meeting August 26th, 2009.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
The digital TPC: the ultimate resolution P. Colas GridPix: integrated Timepix chips with a Micromegas mesh.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
Status of the TPC readout electronics
Pixel panels and CMOS Read-out electronics
Progress with pixelised readout of gaseous detectors
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Progress with pixelised readout of gaseous detectors
TPC Large Prototype Toward 7 Micromegas modules
TPC Paul Colas Technical meeting, Lyon.
EUDET Extended SC meeting 31 August 2009
SALTRO16 activities in Lund
Presentation transcript:

1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups

2 Full post-processing of a TimePix · Timepix chip + SiProt + Ingrid: IMT Neuchatel: 15 or 20 μm highly resistive aSi:H protection layer Timepix chip: 256x256 pixels pixel: 55x55 μm 2 active surface: 14x14 mm 2 MESA+: Ingrid Now also Si 3 N 4 protection layers (7 μ m)

3 Develop the Timepix chip that allows to measure the 3 rd coordinate (drift time) Implementation of Timepix together with GEM and Ingrid into diagnostic endplate system (with GEM working; with Ingrid in progress) Performance measurements in test infrastructure at DESY (analysis GEM+Timepix data in progress) Develop simulation framework (continues) Develop DAQ system and integrate in overall DAQ of EUDET infrastructure (first used in June’09) Reminder of “SITPC” tasks within EUDET:

4 “final” SITPC deliverable is endplate infrastructure consisting of (at least) one LP module with Timepix readout Original “due” date was Dec Later delayed to (and done in June 2009) Reasons: Difficulties with control and readout of 4 or 8 chips on multichip PCBs Difficulties with reliable production of integrated grids (INGRIDs) in ‘wafer’ postprocessing technology Today: most of the difficulties overcome, although large quantities are still not trivial

5 Bonn/Freiburg Nikhef

6

7

8

9

10

11

12

13

14

15

16 Saclay 8 Timepix chips bug in Pixelman software fixed Now waiting for Ingrids from Nikhef/Twente Expect module for test in fall 2009

17 TimePix/Ingrid Panel 23 cm Vue de dessusBottom side TimePix panel with a 2x4 matrix of TimePix chips + InGrids for the TPC Large Prototype 6-layers PCB Transfert card for VHDCI cable

18 First tests 8 TimePix chips have been connected on the PCB - issues for the wire bonding  two chips were broken by the bonding factory Electrical test - an error of routing was found and corrected using external wires - power supply by MUROS only was insufficient (0.2 A per puce)  3 voltage to stabalize (LV) to 2.2V

19 Test with 2 chips The 8 chips were removed and replaced by only two New test at CERN (January 20 th, 2009) - the hardware was validated - but, correction needed in the official software Pixelman

20 New card in progress A new card was designed taking into account what we learn with the previous New design : - the 2x4 matrix is place on top a mezzanine to make easier the wire bonding - power regulators was implemented Waiting for Ingrid  a batch of 8 Ingrids was produced in August’09, but after final probing only 3 were still accessible in readout (under investigation) Should be tested on the Large Prototype TPC by the end of this year

21 NIKHEF: emphasis on Ingrids QUAD chips board tested OK in 2008 Equiped with Ingrids in June ‘09 Could become standalone “traveling” TA infrastructure within Relaxd project: 4x4 Medipix chips in compact mounting Will evolve in 8x8 Timepix chips for EUDET

22 NIKHEF within Relaxd project: 4x4 Medipix chips in compact mounting Will evolve in 8x8 Timepix chips for EUDET/LCTPC

23 Several single chip systems produced for: Test detector performance with different thickness of Si 3 N 4 protection layers (in DESY T22 beam) Test efficiency and resolution in Gossip-like geometry (only 1.5 mm gas layers) in CERN testbeam -Data analysis in progress -Sometimes still discharges that kill Timepix chips; some indication it is on the ‘outside’ edges of Ingrid/Timepix

24 All groups have established contacts with outside institutions for 8” wafer scale post-processing: Freiburg Metallforschungszentrum (pixel enlargement) IZM Berlin: Ingrid technology SMC (Scottish Microelectronics Centre) Edinburgh: Ingrid technology LAAS (CNRS) Toulouse (max. 6” wafers)

25 Conclusions SITPC final infrastructure deliverable available (1 st “leg”) – analysis beam data in progress Waiting for sufficient number of Ingrids to equip 2 nd “leg”; 8 Ingrids hopefully soon Test of 2 nd “leg” at LP possibly still before end rd “leg” with Quad-Ingrid detector(s) ready for tests in coming weeks Longer term (end 2010): working on larger systems of 64 and 119 chips