PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.

Slides:



Advertisements
Similar presentations
Accelerator Plans at SLAC John T. Seeman For the PEP-II Team e + e - Super-B-Factory Workshop Hawaii, USA January 19, 2004.
Advertisements

KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Recent MIA Results Yiton T. Yan Stanford Linear Accelerator Center Acknowledgement: Y. Cai, F-J. Decker, S. Ecklund, J. Irwin, J. Seeman, M. Sullivan,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
The Interaction Region
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
The PEP-II Interaction e+e- Factories Workshop
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
The design of interaction region
Interaction Region Design Options e+e- Factories Workshop
LHC Beam Operations Past, Present and Future
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
BEPCII Background Issues: Collimators and Masks
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
Proposal for a CESR Damping Ring Test Facility
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003

PEP-II Topics FY2002 Results FY2003 Results (first half) FY2003 Plans (second half) FY2004 Plans and Long Range Plans

PEP-II e + e - Collider

PEP-II is a two ring e+e- asymmetric collider

FY2002 Results Run 2 ended June 30, Total integrated luminosity (delivered)= 101 fb -1. Highest luminosity = 4.63 x cm -2 s -1. Down was 4.5 months long for BaBar IFR repairs and PEP-II IP cooling upgrades. Run 3 started November 15, 2003.

2002 Down Time Projects Major projects finished: Support tube bellows cooling (x5 cooling) Forward Q2 chamber (new) HER #6 RF station (new) HER #7 RF station (new) IR2 valve repairs IR2 valve gap rings (repaired) IR2 LER collimator shielding (new) Shortened abort kicker gaps (5%  2.5%) New x-y BPMs at ring sextupoles.

Forward Cooling Collars

New Q2 chamber

IR2 Valve HOM Damage

PEP-II IR2 Vacuum Valve

Shortened Abort Gap

PEP-II FY2003 Run Status (half way) Turn-on started November 15. Winter shutdown December 23-January 1. Power outages (spikes) in December caused hardware damage and run delays. Running has now stabilized. Present data run will end June 30. Run 4 starts September 5, Run 4 stops July 11, 2004, for 10 months. Recall that SPEAR-3 is installed this summer.

PEP-II Energy width measured on the Upsilon 3S resonance

Recent Accelerator Advances By-4 bunch pattern of last spring had very little room to add bunches. Now with By-3 pattern and mini-trains we have open slots to expand the number of bunches and increase the currents. By-3 pattern has extra HOM heating. Poor beam orbits from last spring have been fixed but lowered the luminosity. Restored with selected orbit bumps in LER chicanes and sextupoles have reduced the electron cloud effect, vertical dispersion, and horizontal dispersion. (We now, mostly, know why the orbits had to be poor last spring.) Shortened Abort Gap has allowed 2.5% more bunches and smoother RF operation.

Predicted Integrated Luminosity FY2003

Luminosity Equation When vertical beam-beam parameter limited.  y ~ 0.06 in PEP-II and KEKB. To raise luminosity: lower  y *, raise I &  y.

FY2003 (second half of year) Luminosity Improvements to PEP-II New ring correction algorithms (MIA) –Now works globally to fix beta beats and coupling. So far does not work locally (IR). New local  y * knobs in HER/LER. HER works and LER to be tried this week. Try for 9 mm. Move horizontal tunes to near half integer. We will try soon as MIA now works globally. Increase number of bunches and currents. Need to watch RF trips, vacuum heating, and backgrounds. Try continuous injection.

Scaling factors: Lower  y * in HER/LER with luminosity gain = 12/9 or ~x1.25. “Difficulty = low to medium” Raise currents and number of bunches by x1.3. “Difficulty = hard” (several over heating components) Move tunes to half integer to get lower tune shifts. Gain is about x1.25. “Difficulty = medium to hard” Continuous LER injection: “Difficulty: easy for PEP-II; hard for BaBar”. Gain in integrated luminosity is about x1.2. Total luminosity gain is x2.0. Hope to get x1.4 by July. (Luminosity to 7.0 by July with more later.)

PEP-II Summer 2003 Projects New HER # 8 RF station (+200 mA). New HER collimator (30 m upstream). New Longitudinal feedback kickers. Improved transverse feedback kickers. Improved low level RF feedback circuits (higher I). More x-y BPMs in IR2 region. LER straight section and Arc 11 solenoid upgrade. Octupoles for tune shift with amplitude studies. Bellows fans on all LER bellows (~240) Fix IR vacuum gate valves Air cooling of Feedback Kicker cables More background shielding of PEP-II in IR2

HER Collimator

Old Longitudinal Kicker

New Longitudinal Feedback Kicker Assembly

New Longitudinal Feedback Kicker End Plug

Transverse Feedback Kicker

Octupole Magnets (from CERN)

FY2004 and longer plans Continue to increase luminosity each year  AIP funding (Accelerator Improvement Projects) Big upgrade in the summer of FY 2004 by moving quadrupoles closer the the interaction region and lowering  y * to 6-7 mm. Continue to add RF stations (one station per year for five years) Some higher power vacuum chamber upgrades needed. Better beam controls needed: bunch-by-bunch feedbacks, injection, backgrounds, Electron Cloud Instability,…

Meters Centimeters Possible 3x10 34 Interaction Region with a ±3.25 mrad Xangle M. Sullivan Jun. 14, 2000 QD1 QD4 QF5 QF2 QD4 QF5 QD1 QF2 Extra focusing Extra focusing 3.1 GeV 9 GeV PEP-II upgrade with Permanent Magnet Quadrupoles

Path to higher PEP-II luminosity Luminosity4.8E337.5E331.5E342.5E34Units I mA I mA Beta y* mm Beta x* cm Bun. Length cm # bunches Vert. emit nm Horiz. Emittance40/5035/4535/4540/53nm (+/-) Crossing angle000+/-8 (?)mrad Beam-beam para.(x/y)7.5/4.27.5/4.47.5/5.68.2/5.8x100 Number RF stations Date hardware readyNov 02Mar 03Nov 05Nov 07 Date for luminosityFeb 03July 03Fall 06Fall 08

PEP-II Summary PEP-II has delivered 22 fb -1 in Run 3 and 123 fb -1 since May Starting to take advantage of FY2002 summer down projects. We still have several advances to go! Integrated luminosity is ahead of predicted track. Luminosity has increased to 5.2 x cm- 2 s -1. Upgrades for Summer FY2003 are on track. Long range plans lead towards >2.5 x cm -2 s -1.