LIGO-G020223-01-W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
8/13/2004 Stefan Ballmer, MIT / LIGO Hanford 1 Length and angular control loops in LIGO Stefan Ballmer Massachusetts Institute of Technology LIGO Hanford.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
LIGO Laboratory1 Thermal Compensation Experience in LIGO Phil Willems- Caltech Virgo/LSC Meeting, Cascina, May 2007 LIGO-G Z.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G W LHO Status Fred Raab 8/5/02. LIGO-G W Raab - LHO Status Both Interferometers Lock Nicely Last 4 days are typical:
LIGO-G M Photon Calibrator DRR & CDR: Response to Reviewers’ Report Phil Willems, Mike Smith.
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
LIGO-G W Where Did the LSC Signals Come From? Fred Raab 27 June 02.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
G R DC Readout for Advanced LIGO P Fritschel LSC meeting Hannover, 21 August 2003.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Interferometer Control Matt Evans …talk mostly taken from…
Commissioning work on the low temperature interferometer 5/17/2010 GWADW at Kyoto Osamu Miyakawa (ICRR, U-Tokyo) and CLIO collaboration 5/17/2010 GWADW.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
Displacement calibration techniques for the LIGO detectors Evan Goetz (University of Michigan)‏ for the LIGO Scientific Collaboration April 2008 APS meeting.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
G D LSC Changes in Preparation of High Power Operations Commissioning Meeting, May 5, 2003 Peter Fritschel, Daniel Sigg, Matt Evans.
Matt Evans, LSC March 2003 (G E)1 Lock Acquisition in LIGO  Who am I? »Matt Evans »Caltech graduate  What is Lock Acquisition? »The process.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
08/24/2004 Stefan Ballmer, MIT / LIGO Hanford G I 1 Hanford 4km Recent improvements and currently limiting noise sources Stefan Ballmer Massachusetts.
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Modeling of the Effects of Beam Fluctuations from LIGO’s Input Optics Nafis Jamal Shivanand Sanichiro Yoshida Biplab Bhawal LSC Conference Aug ’05 LIGO-G Z.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
LIGO Laboratory1 Thermal Compensation in LIGO Phil Willems- Caltech Baton Rouge LSC Meeting, March 2007 LIGO-G Z.
LIGO-G W LIGO Detector Commissioning Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO-G D “Bi-linear” Noise Mechanisms in Interferometers Stan Whitcomb LIGO/Caltech GWDAW 15 December 2000.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO Livingston Observatory Commissioning Status and Proposed Commissioning Activities Prior to S1 Mark Coles May 13, 2002.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Calibration and the status of the photon calibrators Evan Goetz University of Michigan with Peter Kalmus (Columbia U.) & Rick Savage (LHO) 17 October 2006.
LIGO Commissioning June 10, 2002
Main Interferometer Subsystem
Daniel Sigg, Commissioning Meeting, 11/11/16
First Lessons from the Advanced LIGO Integration Testing
ALS Noise Budget and Model Status Report
ALS HIFO-X Noise Budget and Model Status Report
Progress toward squeeze injection in Enhanced LIGO
Commissioning Progress and Plans
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
The Advanced LIGO Angular Control System (ASC) (Hanford edition)
Homodyne readout of an interferometer with Signal Recycling
Commissioning the LIGO detectors
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
LIGO Detector Commissioning
Status of LIGO Installation and Commissioning
Frequency Noise in Virgo
LIGO Detector Commissioning
Improving LIGO’s stability and sensitivity: commissioning examples
LIGO Photon Calibrators
Status at the Prague meeting
Presentation transcript:

LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02

LIGO-G W Raab: Status of LIGO Installation & Commissioning2 H2 Status It locks again after fixing ETMX problems Normal configuration is 5 W in, but low light at AS diode Displacement noise ~2e-15 m/Hz 1/2 at 100 Hz, about 100X worse than achieved in 40-m interferometer A number of electronics noise checks detailed by P. Fritschel (stop-band tests) have cleared much of electronics as low noise contributor Above 500 Hz, noise is consistent with dark noise Attempts to put more light on AS diode showed decrease in both noise and lock stability, as well as hints of another noise source RMS displacement ~2e-12 m by integrating AS_Q WFS 1 and 2 have been engaged

LIGO-G W Raab: Status of LIGO Installation & Commissioning3 H1 Status Locking is touchy,but once locked it tends to stay locked if we don’t poke it De-whitening filters are ready to be engaged, but knocked IFO out of lock in a few seconds after engagement; maybe too much frequency noise Common-mode servo electronics have been checked out and they have worked on a single arm lock, but attempts to engage in full IFO configuration have failed and locking has made tuning difficult No WFS Parasitic interferometer found before MC?

LIGO-G W Raab: Status of LIGO Installation & Commissioning4 H1 Tasks Extend drive range on ETMs Implement common-mode servo Switch in de-whitening filters Implement WFS1 (at least) Increase light into interferometer & onto AS diode Noise hunting Implement remaining WFS

LIGO-G W Raab: Status of LIGO Installation & Commissioning5 H2 Tasks Hunt noise at low f Hunt noise at high f Improve stability and lock times Investigate non-stationary noise

LIGO-G W Raab: Status of LIGO Installation & Commissioning6 Track Down Source of Low-f Noise Most, but not all electronics noise cleared »Should inject notched noise at analog front end »Will check all coils and document Unlikely to be real displacements »Structureless »Suspensions too similar to 40-m for creep »Pendulum thermal noise has different f distribution and measured Qs are way too good Laser light delivered by IO appears good in checks so far »Laser Intensity noise »RF amplitude noise »Beam jitter »Parasitic interferometers?

LIGO-G W Raab: Status of LIGO Installation & Commissioning7 Evidence for Single Parasitic Interferometer Sharp edge 1-sec period Taken with RM aligned to light; rest of IFO misaligned; 45 dB whitening gain Design Spec was to place edge below 30 Hz under normal conditions (i.e., LIGO Standard Spectrum)

LIGO-G W Raab: Status of LIGO Installation & Commissioning8 Parasitic Interferometer Noise Typically Has Sharp Cutoff ~180 dB/octave

LIGO-G W Raab: Status of LIGO Installation & Commissioning9 Gain Fluctuation Noise Investigation Read out given by: x(f) =  x(f) + x static  A(f)/A) + (bilinear in  x,  A/A) A is total gain,  A the fluctuation We have ruled out ( < 1e-7) »RF power fluctuations at modulator »intensity fluctuations on laser light from input optics Not ruled out »Fluctuations of carrier power in arms »Fluctuations of sideband power in PRM »Both fluctuate as much as 20-30% »Fluctuating overlap between sidebands and carrier at AS photodiode »Fluctuations of RF phase

LIGO-G W Raab: Status of LIGO Installation & Commissioning10 How Bad Could Gain Fluctuation Noise Be on H2? Limit on x static < 2e-10 m from laser intensity noise measurement, expect it to be far smaller Mostly at pendulum frequencies, but suppose a fraction of the gain noise was distributed like f -3 No good reason to expect f -3 distribution, but should rule it out experimentally

LIGO-G W Raab: Status of LIGO Installation & Commissioning11 Improve H2 Noise Above 1 kHz Daniel believes raising light at AS diode reduces margin for holding lock against RMS fringe motion »Need more gain at intermediate to low f »Rolf has included additional filters in new LSC code After reconfiguring gains, increase light at AS diode We expect to lock with ~4x better sensitivity but we have had hints of another noise source Take spectra with good calibrations regularly