OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting2 1.– Starting Data 2.– OLYMPUS – BLAST Water 3.- Pressure Reduction 4.- Supply Power Cable Cooling 5.- Summary
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting3
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting4
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting5 10 bars Pressure 70 m 3 /h Flow 200 mm Diameter
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting6 168,3 mm Diameter Some Flanges Available More Pipes Needed
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting7 2.– OLYMPUS – BLAST Water
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting8 Water Enters this Side
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting9 2 OUTs Manifold Distributes Water 1 IN
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting10 Distributing Manifolds
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting11 Water to Manifolds Space Available at DESY Pit: Alignment of the Tank Thread with Pipes Going to Manifolds
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting12 Shift Tank Thread
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting13 Double Water Circuit (In – Out) Connection with Tank Thread Separated Circuit for Mounting-Beam Position
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting14 1 Tee 2 Valves
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting Pressure Reduction
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting16 Restriction Orifice Plate From 10 to 8 Bars
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting17 Screw 7 to 8 bar 10 bar d ~ 38 – 41 mm Water Pressure Reduction FEASIBLE Water Flow: To Be Checked Pressure Release Valve
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting Supply Power Cable Cooling
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting19 BLAST: Cooling of Cables Going to the Coils
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting20 Needed for OLYMPUS?
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting21 Summary - Layout of the Pipes Circuit Done - More Pipes Needed - BLAST Pipes and Fittings Available - Separated Circuits for Mounting-Beam Position - Orifice Plate for Pressure Reduction - Water Flow to Be Checked - Supply Power Cable Cooling Needed?
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting22 Personal Contact: Tel: +49 (0) /1634 web.mit.edu/OLYMPUS Thank you!