OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY 23. 02. 2010.

Slides:



Advertisements
Similar presentations
Water Hydraulic Valves
Advertisements

Pipes Single Wall Pipes Double Wall Pipes
1 I. Troubleshooting ◆ Troubleshooting of hydraulic machine FailuresReasonsCountermeasures Hydraulic driving motor can ’ t start 1)Fuse burnt 2)Electric.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
Experiment 8 : Minor Losses
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro HIM / Mainz University OLYMPUS Collaboration.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Making an IMPACT on Water Treatment Industry
Valves and Appurtenances
Mechanical Design Of Cooling Layout Thermal Test of Test Module Type 0
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Bulk flow—Pressure difference Plant Physiology UNI 2009.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Fire Pump Functions The main function of a fire pump is to increase the pressure of the water that flows through it. Inadequate or nonexistent municipal.
Water piping design.
HVAC523 Circulator Pumps.
OIL & GAS FIELD SUPPLIES DIVISION Oil & Gas Field Supplies Division deals in supply of Gate Valves, Ball Valves, Butterfly Valves, Control Valves, Check.
HEAT EXCHANGER.
Air Conditioning Circuit
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
ADS / PHX SERIES SYSTEMS ADVANCED TOPICS. F O R T H E NEM ILLE NN I U M F O R T H E NEM ILLE NN I U M Advanced ADS / PHX Topics Halon retrofits Directional.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
FC Flow Control: Centrifugal pump with constant speed (rpm) Orifice plate sensor Globe valve FC Flow Control: Positive displacement pump Orifice plate.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Florian Buchsteiner (HEPHY Vienna)
Machinery Auxiliary Systems
Unit 7 Gas Heat: Natural and LP
Feedback on transfer line sizing and flow calculations for UT
Climate Control Systems Service
How to Select and Optimize Abrasive Blasting Equipment
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Ti/SS transitions A.Basti INFN-PISA*
Update of MVD services and requests
Connection methods in district heating networks
Tracker cooling loop “check out” draft for discussion
Integration issues at IHEP
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
INTRODUCTION TO PNEUMATICS
Welcome! Drafting 2323: Pipe Drafting
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Water Distribution Networks Under Intermittent Pumping: Development of a hydraulic model and Assessment of water losses Prepared by Mohammad Jihad Abdo.
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Tracer Applications.
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting2 1.– Starting Data 2.– OLYMPUS – BLAST Water 3.- Pressure Reduction 4.- Supply Power Cable Cooling 5.- Summary

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting3

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting4

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting5 10 bars Pressure 70 m 3 /h Flow 200 mm Diameter

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting6 168,3 mm Diameter Some Flanges Available More Pipes Needed

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting7 2.– OLYMPUS – BLAST Water

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting8 Water Enters this Side

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting9 2 OUTs Manifold Distributes Water 1 IN

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting10 Distributing Manifolds

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting11 Water to Manifolds Space Available at DESY Pit: Alignment of the Tank Thread with Pipes Going to Manifolds

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting12 Shift Tank Thread

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting13 Double Water Circuit (In – Out) Connection with Tank Thread Separated Circuit for Mounting-Beam Position

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting14 1 Tee 2 Valves

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting Pressure Reduction

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting16 Restriction Orifice Plate From 10 to 8 Bars

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting17 Screw 7 to 8 bar 10 bar d ~ 38 – 41 mm Water Pressure Reduction FEASIBLE Water Flow: To Be Checked Pressure Release Valve

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting Supply Power Cable Cooling

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting19 BLAST: Cooling of Cables Going to the Coils

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting20 Needed for OLYMPUS?

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting21 Summary - Layout of the Pipes Circuit Done - More Pipes Needed - BLAST Pipes and Fittings Available - Separated Circuits for Mounting-Beam Position - Orifice Plate for Pressure Reduction - Water Flow to Be Checked - Supply Power Cable Cooling Needed?

Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting22 Personal Contact: Tel: +49 (0) /1634 web.mit.edu/OLYMPUS Thank you!