Beam Based Survey and Alignment of Ring Magnets David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.

Slides:



Advertisements
Similar presentations
Low Emittance Tuning (LET). Through Dispersion Free Steering.
Advertisements

Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th /11/2014M.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
XXII ESLS, Grenoble Basic approach to managing transverse coupling in Elettra: strategy and simulations S. Di Mitri S.
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
Author - Title (Footer)1 LINEAR LATTICE ERRORS AT THE ESRF: MODELING AND CORRECTION A. Franchi, L. Farvacque, T. Perron.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
“AC” Dispersion Measurement David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Alignment and Beam Stability
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Beam Tests of DFS & WFS at FACET Andrea Latina, J. Pfingstner, D. Schulte, D. Pellegrini (CERN), E. Adli (Univ. of Oslo) With the help of F.J. Decker,
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Dynamic Aperture Study for the Ion Ring Lattice Options Min-Huey Wang, Yuri Nosochkov MEIC Collaboration Meeting Fall 2015 Jefferson Lab, Newport News,
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
11/18/2004 FNAL Advanced Optics Measurements at Tevatron Vadim Sajaev ANL V. Lebedev, V. Nagaslaev, A. Valishev FNAL.
CEPC DA due to magnets' error Sha Bai, Dengjie Xiao, Yiwei Wang, Huiping Geng, Dou Wang, Tianjian Bian, Feng Su, Jie Gao The first IHEP-BINP CEPC Accelerator.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
M. Woodley ATF Studies Meeting (April 30, 2008) 1 QM7R Vertical Bump Study March 14, 2008.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Alignment and beam-based correction
Orbit Response Matrix Analysis
Orbit Control For Diamond Light Source
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
Coupling Correction at the Australian Synchrotron
Beam-based alignment measurements
FCC-ee Lattice with Misalignments
3rd ATF2 Project Meeting, December 18-20, 2006
Low Emittance Tuning in CESR TA
Analysis and Optimization of Orbit Correction Schemes
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
LHC Closed Orbit For Beam 2
Status of Low Emittance Tuning at CESR TA
CesrTA Low Emittance Program David Rubin Cornell Laboratory for
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Optics Measurements in the PSB
BEAM REALISTIC ERROR ORBIT IMPACT ON SASE PERFORMANCE
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Error Sensitivity in MEIC
Presentation transcript:

Beam Based Survey and Alignment of Ring Magnets David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education

July 8, 2008 ILCDR08 2 Beam based alignment -Measure zero vertical corrector orbit -Use analysis tools to identify offset quadrupoles and tilted bends and to quantify - Move magnets and repeat.

July 8, 2008 ILCDR08 3 Zero corrector orbit

July 8, 2008 ILCDR08 4 Wave analysis Interaction region

July 8, 2008 ILCDR08 5 Identify misaligned magnet “Correct” for misalignment in IR with nearby steerings (1E,1W) Identify 17E as source of vertical orbit error (y_offset = +300 microns)

July 8, 2008 ILCDR08 6 Move magnet and remeasure After 300 micron move

July 8, 2008 ILCDR08 7 Change in vertical orbit Orbit difference data: after move ref: before move (data-ref)-model The model is the orbit with a 300 micron offset of Q17E

July 8, 2008 ILCDR08 8 Optimize IR correction We managed to reduce RMS from 0.805mm to.771mm

July 8, 2008 ILCDR08 9 Conclusions -With wave analysis we can effectively identify “biggest” misalignments -Combination of wave analysis, fitting, and survey data can identify more subtle errors -Magnet moves have predictable outcomes Future plans SVD analysis to identify misaligments? Include dispersion as a constraint (insensitive to BPM offset) Limited by performance of BPM system so looking forward to upgrade