Life Cycle Cost Analysis

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Capital Budgeting Chapter 12. Capital budgeting: process by which organization evaluates and selects long-term investment projects – Ex. Investments in.
INVESTMENT ANALYSIS OR CAPITAL BUDGETING. What is Capital Budgeting? THE PROCESS OF PLANNING EXPENDITURES ON ASSETS WHOSE RETURN WILL EXTEND BEYOND ONE.
3.2 Investment Appraisal Chapter 19. Investment To purchase capital goods  Equipment  Vehicles  New buildings  Improving existing fixed assets.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
INVESTMENT APPRAISAL NON DISCOUNTING By Lucky Yona.
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
BOND VALUATION AND RISK 1. ■ Bonds are debt obligations with long-term maturities that are commonly issued by governments or corporations to obtain long-term.
EE535: Renewable Energy: Systems, Technology & Economics
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
MGT 326 Ch 13: The Cost of Capital (bdh2e)v1.1 1 The Cost of Capital What is Capital?  In the finance world, capital refers to the sources of financing.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
PRIORITIZATION.
Yield Curves and Term Structure Theory. Yield curve The plot of yield on bonds of the same credit quality and liquidity against maturity is called a yield.
AEC 422 Fall 2014 Unit 2 Financial Decision Making.
Benjamin Krom, PE Michigan Department of Transportation.
FOOD ENGINEERING DESIGN AND ECONOMICS
Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
Establishing the Planning Horizon
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
AEC 422 Fall 2012 Unit 2 Financial Decision Making.
Economic Analysis: Applications to Work Zones March 25, 2004.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
8- 1  2001 Prentice Hall Business Publishing Management Accounting, 3/E, Atkinson, Banker, Kaplan, and Young Capital Budgeting Chapter 8.
Selecting a Minimum Attractive Rate of Return Chapter 15 Mechanical Engineering 431 Engineering Economics.
Long-Term (Capital Investment) Decisions
Economic Evaluation of PV systems in Jordan
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
7 FINANCE, SAVING, AND INVESTMENT © 2014 Pearson Addison-Wesley After studying this chapter, you will be able to:  Describe the flow of funds in financial.
Maintenance & Rehabilitation Strategies Lecture 5.
Highway Costs Spring Highway Transportation Costs Type of CostExamples Highway investment costEngineering design, ROW, grading, drainage, pavement.
CHAPTER 3 Structure of Interest Rates © 2003 South-Western/Thomson Learning.
Conceptual Tools The creation of new and improved financial products through innovative design or repackaging of existing financial instruments. Financial.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Chapter 8 Capital Asset Selection and Capital Budgeting.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Rate of Return Analysis Chapter 7: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Introduction To Transportation Economic Analysis Discounting.
Life-Cycle Cost Analysis (LCCA) of Buildings
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 6 Interest Rates And Bond Valuation.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
Copyright © 2014 Nelson Education Ltd. 11–1 PowerPoint Presentations for Finance for Non-Financial Managers: Seventh Edition Prepared by Pierre Bergeron.
UNIT No. 3 Capital Budgeting Nature Significance Technique of Capital Budgeting Pay back Method Accounting Rate of Return Net Present Value Profitability.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Capital Budgeting Tools and Technique. What is Capital Budgeting In “Capital budgeting” capital relates to the total funds employs in an enterprise as.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Capital Budgeting and Cost Analysis
INVESTMENT ANALYSIS OR CAPITAL BUDGETING
Project Feasibility Analysis
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
Other Long-Run Decisions
Presentation transcript:

Life Cycle Cost Analysis CE 7640: Fall 2002 Tapan K. Datta, PhD, PE

What is Life Cycle Cost (LCC) Analysis? A method of calculating the cost of a system over its entire life span.

Objectives of LCC Analysis Evaluate the economic effectiveness of different mutually exclusive investment alternatives over a certain period Identify the most cost-effective alternative

Analysis Period A time frame that is sufficiently long to reflect differences in performance among different strategy alternatives.

Selection of Analysis Period It is necessary to select an analysis period over which the alternatives are compared.

Pavement Rehabilitation Project Analysis period is considered starting at the end of the performance period of the original pavement.

Rehabilitation strategy analysis period beginning at the end of original pavement performance period

Example 1 Common Performance Period All the investment alternatives have the same performance period.

Common Performance Period Performance curves for rehabilitation alternatives expected to exhibit notably different performance over the common performance period.

Selection of analysis period for alternatives with common performance period, but different performance

Options for Defining the Analysis Period The least common multiple of the performance periods of all the alternatives The shortest of the performance periods among the alternatives The longest of the performance periods of the alternatives Some other time period

Comparisons of Various Options For relatively longer performance periods, use of least common multiple of the performance periods can result in an extremely long and unrealistic analysis period. The use of shortest performance period may adversely affect those alternatives with better long-term performance and favor those with short performance periods. The longest performance periods is recommended as the analysis period.

Example 2 Unequal Performance Periods Alternatives having different performance periods, which are expected to be able to keep the pavement condition above the minimum acceptable level for different lengths of time.

Unequal Performance Periods The analysis period is recommended to be no less than the performance period of the longest surviving alternative. Using a shorter analysis period (equal to the performance period of one of the shorter-lived alternatives) would not fully capture the anticipated differences in performance.

Selection of analysis period for alternatives with unequal performance periods

Unequal Performance Periods While using a longer analysis period, the follow-up rehabilitation treatments would have to be assigned to all three alternatives.

Selection of analysis period to encompass follow-up rehabilitation for all alternatives

Comments One or more of the alternatives may have a follow-up rehabilitation performance period which extends beyond the end of the analysis period. FHWA recommends an analysis period of at least 35 years for all projects (new construction as well as rehabilitation)

Bottom Line of Analysis Period Analysis period should be selected sufficiently long to reflect significant differences in performance among the different strategy alternatives.

Discount Rate Refers to the rate of change of true value of money over time, considering fluctuations in both investment interest rates and the rate of inflation. Discount rate is approximately equal to the interest rate minus the inflation rate.

Selection of Interest Rate Philosophy 1: A zero interest rate is appropriate when tax monies are used for financing. Philosophy 2: The interest rate need only reflect the “societal rate of time preference”.

Selection of Interest Rate Philosophy 3: The appropriate interest rate is dictated by the opportunity cost of those investments forgone by private investors who pay taxes or purchase bonds.

Selection of Interest Rate Philosophy 4: The appropriate interest rate is dictated by the opportunity cost of those investments forgone by budget agencies due to budget constraints.

Selection of Interest Rate Philosophy 5: The interest rate should match that paid by government for borrowed money. The rate at which governments can borrow money is felt to be appropriate for evaluating highway improvement projects.

Typical Discount Rate Discount rates used by State DOTs in life cycle cost analysis vary from 0 to 10 percent, with typical values between 3 and 5 percent, and overall average rate of 4 percent.

Monetary Agency Cost Costs associated with the alternative that are incurred by the agency during the analysis period, which can be expressed in monetary terms.

Monetary Agency Cost Includes the following: Initial rehabilitation design and construction costs Follow-up rehabilitation design and construction costs Annual maintenance costs Traffic control costs during construction Demolition and removal costs, or residual value of the pavement structure

User Costs Costs associated with the alternative that are incurred by the users of a roadway over the analysis period, which can be expressed in monetary terms.

Categories of User Costs Vehicle operating costs - fuel and oil, wear on tires and other parts, registration, insurance, and others Delay costs - due to reduced speed and/or use of alternate routes Crash costs - damage to the user’s/other vehicles, public/private property, as well as injuries

Vehicle Operating Costs In-service vehicle operating costs are a function of pavement serviceability level, which is often difficult to estimate. Tools are available to model these costs, such as World Bank’s Highway Design and Maintenance Standards Model (HDM-III), FHWA’s Highway Investment Analysis Package (HIAP-Revised), AASHTO Red Book, and others.

Delay Costs Costs associated with the value of time. Vary by vehicle class, trip type and trip purpose. A function of demand for use of the roadway with respect to roadway capacity. Work zone user delay costs may be significantly different for different rehabilitation alternatives.

Crash Costs In-service crash rates for different roadway functional classes and crash severities are well known. Work zone crash rates may differ significantly for different rehabilitation alternatives.

Other Monetary Costs Those incurred by parties other than the agency or the users of the roadway. Owners of properties and businesses adjacent to or near the route under study. Municipalities whose sales tax receipts might be reduced during the period that the nearby businesses were adversely affected.

Salvage Value The residual value that can be attributed to the alternative at the end of the analysis period. The value that the item would have in the market place. Must be defined the same way for all alternatives.

Compare Strategies Present Worth Equivalent Uniform Annual Cost Future Worth Internal Rate of Return External Rate of Return Benefit/Cost Ratio Payback Period Capitalized Worth

Sensitivity of Life Cycle Cost Analysis to Key Parameters Factors that are more sensitive: The analysis period and performance period The predicted traffic over the design and analysis periods The initial investment The discount rate The timing of follow-up maintenance and rehabilitation activities The quantities associated with initial and follow-up maintenance and rehabilitation