2-5-10 Rev 11.  Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps 

Slides:



Advertisements
Similar presentations
Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
Advertisements

Telescoping Mast Design Options Presented by Doug Eddy, GRA and Dr. Sundar Krishnamurty at UMass Amherst For Hoppe Tool.
Cylinders and Actuators
DIT Equipment Inc. Sharky Splitter. High productivity 90 metric ton of force (100 short ton) on a 48” wide split. Split in 2 seconds (including an 8”
VS Series Shears. User-friendly CNC Touchscreen Control Flexibility for Thick/Thin or Narrow/Wide Sheets Automatic Swing-up Back Gauge T-slotted Sheet.
BATTERY BUGGY Mike Johnson. LAY PERSON’S EVENT DESCRIPTION: Teams will construct a battery-powered vehicle that: moves as fast as humanly possible, and…
ATK Automated Bullet/Case Loading University of Idaho, Mechanical Engineering Dept. Team FMJ Chris Doudy, Ryan Kahre, Adriana Foreman, Ryan Bowen, Jordan.
IE 447 COMPUTER INTEGRATED MANUFACTURING CHAPTER 9 Material Handling System 1 IE CIM Lecture Notes - Chapter 9 MHS.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
ISQED’2015: D. Seemuth, A. Davoodi, K. Morrow 1 Automatic Die Placement and Flexible I/O Assignment in 2.5D IC Design Daniel P. Seemuth Prof. Azadeh Davoodi.
Chapter 8 Information Systems Development & Acquisition
Aligning - Proposed Solution. Variable Speed Twin-Belt Conveyor System Outside vendor to supply conveyor system. Possible Vendors: Kleenline Corporation.
Process Improvement for Drill Bit Blanks For MN Twist Drill The Three Orienteers Scott Anderson – Project Leader Andy Johnson – Mechanical Engineer Tony.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Process Improvement for Drill Bit Blanks For MN Twist Drill The Three Orienteers Scott Anderson – Project Leader Andy Johnson – Mechanical Engineer Tony.
Team CNH Design a less expensive propulsion control system with equivalent or better performance than existing hardware for Hydrostatic Windrower Machine.
1 Ryan Bean John Hieb Will McCoy Devon Norman. 2 Contents  Length Motion Motors  Drive Assembly  Length Rail System  Platform Design  Width & Depth.
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Pneumatic Actuators Brief Overview Kunal Sinha Grad General Engineering EFR : 2 per min.
Dan Damon Kevin Hampton Christine Lee Shane Siwinski ADVISOR: Professer Lin SPONSER: General Motors.
1 Project Planning CIS 375 Bruce R. Maxim UM-Dearborn.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Course of MT- 362 Material Handling Lecture # 8.
Detailed Design Review Project # /12/10 1Rev 01.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
8-1 Chapter 8 Information Systems Development & Acquisition.
Systems Level Design Review Project # /15/09 Rev 011.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
BE-BI camera projects HS, SB, EB March outline New digital cameras New rad-hard cameras (vidicon replacement)
MKT May 2012 C850: Fast sliding gate operator. MKT May 2012 Summary  Why a fast slider operator?  USPs  Applications  Details  Technical specifications.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Precision AirConvey Internal Duct Cleaning System December 10, 2007 Sean Darras Nick Rakov Katie Sear Lindsay Martz.
Wegman's Swirl Cake Process Improvement: Detailed Design Review Aaron Delahanty Ryan Norris Arwen Sharp Benson Yu Kenyon Zitzka Nov. 11th, 2011.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
EAST ELECTRIC 1 SYSTEMINTEGRATOR & SALES PARTNER INDUSTRIAL AUTOMATION FROM ONE PROVIDER.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Microscope Review Created by J. Cook.
Automated NOvA Fly Cutting Machine NFCM 07/09/2010Jonas F., Lukas G., Balazs M., Jonas S., Christian W. 1 Automated NOvA Fly Cutting Machine.
KNUDSEN PUMP. WHAT IS IT? Vacuum pump Principal of thermal transpiration temperature gradient causing the gas molecules to move from one side of the tube.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design I.
Chapter 11: Alternative Approach - Purchasing Systems.
T. Freemantle Ltd SPECIALISTS IN SLEEVING EXPERTS IN CARTONING FOOD - HOUSEHOLD GOODS - COSMETICS - HEALTHCARE - PHARMACEUTICAL The UK Market Leader Serving.
T. Freemantle Ltd SPECIALISTS IN SLEEVING EXPERTS IN CARTONING FOOD - HOUSEHOLD GOODS - COSMETICS - HEALTHCARE - PHARMACEUTICAL The UK Market Leader Serving.
Texonics Proposal for Production Line Redesign and Retrofit.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
Procurement to Pay (P2P) Initiative March 2014 “Supporting and Enabling Strategic Sourcing”
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
The Information Systems Development Processes Chapter 9.
 Your Single Source for "to spec" Custom Manufacturing Your Single Source for "to spec" Custom Manufacturing  AMS offers a unique and complete combination.
Copyright © 2012 Rockwell Automation, Inc. All rights reserved.Rev 5058-CO900B Integrated Linear Thruster Steve Feketa June 2012.
Best Practices Consortium
Ethernet Switch Replacement
Fort Stanwix National Monument Energy Audit Contract
2017 STEM 5023 Creativity & Innovation Final Project (100pts)
Equilibrate System upgrade
Garage Parking Indicator
High Speed Machining Time is money….
SION Vacuum Circuit-Breaker For Standard Applications
Tub Lift Rev. 2 Dom Group
World-Views of Simulation
Cnc machine Presented By:.
Chapter 13 Building Systems.
For more information contact: Mike Newsky,
Presentation transcript:

Rev 11

 Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps  Prepare for next week’s detailed design review Rev 12

Based on a given number of minutes per day, 5 days a week, for two years Does not include benefits and other costs associated with employees 10% IRR Flipper and aligner estimate based on repurposing two employees Flipper, aligner and labeler estimate based on repurposing four employees Total cost for 2 lines Rev 13

# Minutes/Day Replace Flipper and Aligner (-R3 from each line) Replaces Flipper, Aligner and Labeler (-2 R3 from each line) 500$89,000$178, $96,000$193,000 Rev 14

Proposed Design Rev 15

6

 Outside vendor to supply conveyor system  Possible Vendors: ◦ Kleenline Corporation ◦ Lipe Automation  Lead Time: Unknown  Capabilities: Full/Half-width product  Cost: Unknown Rev 17

 Electric Linear Actuators are triggered by object detection beam.  Sliding pusher-plate contacts product and gently pushes to center of conveyor.  Logic controller allows for use on all product lines.  Products end up in single file line, to safely continue through x-ray detection.  Very compact system Rev 18

 Pusher System has marginal impact on space constraints  Variable speed twin belt conveyor system Rev 19

10

Rev 111

Proposed Design Rev 112

Rev 113  304SS flipper tray ◦.090”-.105” Thick, Material Cost approx $60-$150  SS wash down type cylinder, 1 1/16” diameter, 3.5” travel ◦ McMaster 6239K155, approx $135

 Prevents jams  Gate opens to allow single piece to advance  Gate closes while piece is flipped  Rotational actuator controls motion Rev 114

 Design considerations ◦ Guides to keep product centered ◦ Mounting solution for system ◦ Utilizing smaller diameter conveyer system to save vertical space ◦ 6.5” vertical change, 14” Length  Flip tray construction out of aluminum for prototype? Rev 115

Progress Implementation Options Rev 116

 Algorithms for camera processing written, not yet coded  Tentative price structure for camera system devised, available upon request  In contact with Cal-Pak to create an all-in- one locator and labeler system Rev 117

1. Automatic labeler 1.Outsource 2.Recommend MSD follow-up project 3.Complete as much as possible 2. Label assist 1.In-house Rev 118

 Cost: TBD  Benefits ◦ Current labor required to hand label product can be reallocated ◦ Increased speed  Potential Problems ◦ Does not rotate to align labels as required by this application, this feature would still need to be developed ◦ Air pressure would need adjusting ◦ Enclosure? Rev 119

 Cost: ~$660  Benefits ◦ Improves speed of labeling ◦ Fast implementation ◦ Ergonomic improvement?  Shortfalls ◦ Does not allow for complete reallocation of required labor Rev 120

 Conduct stress analyses  Integrate system and model  Dimension most important components  Get more information on vendor collaboration  Compile BOM  Detailed Design Review ◦ Next Friday, 2-12 ◦ Time 1:30 pm? Rev 121