Green Investment Scheme (GIS) in the Czech Republic Petr Jan Kalaš Moscow Carbon Market Forum 2008 Ministry of Environment Vršovická 65 100 10 Praha 10.

Slides:



Advertisements
Similar presentations
The Hungarian Green Investment Scheme Gyorgy Lazi THE WORLD BANK Energy and Infrastructure Unit, Europe and Central Asia Region.
Advertisements

Financial tools to support mitigation projects and programes in the Slovak Republic Helena Princová, Mario Gnida Climate Change Policy Department Climate.
Climate Change and Finance for Small and Medium-sized Enterprises Sofia, Bulgaria 9 October 2013 International Policy on Climate Change Diana Todorova.
1 CF Assist Activities in Central and Eastern Europe Helmut Schreiber Annual Meeting of the Host Country Committee on Carbon Finance February 15-16, 2005.
The KfW Carbon Fund 37th REGULAR MEETING OF THE ALIDE GENERAL ASSEMBLY 2007 May 2007.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Green Investment Scheme in Romania: lessons learnt and challenges ahead Maria Khovanskaya Climate Change Department REC Kiev,Ukraine 6 April 2007.
Lithuania: in position to GIS Asta Skrockaite Budapest April 24-25, 2008 Lithuanian Environmental Investment Fund.
AAU trading standards: the Latvian Approach Ilze Prūse Head of the Pilot Projects Implementation Division of the Climate and Renewable Energy Department.
The Hungarian Green Investment Scheme Gyorgy Lazi THE WORLD BANK Energy and Infrastructure Unit, Europe and Central Asia Region.
1 Latvia’s Participation in International Emissions Trading The World Bank Assistance in Options Study and Advisory Service Kyoichi Shimazaki The World.
Overall overview of GIS instrument, its developments and prospects for the Russian Federation Alexander Averchenkov World Bank, Consultant Moscow carbon.
GIS in Hungary Context and architecture József Feiler.
Domestic Offsets - first experiences POLAND Brussels, 1 March 2010 Roundtable: Domestic Offsets under Article 24 (a) Izabela Zborowska, KASHUE-KOBiZE.
Green investment scheme and climate change mitigation policy in Ukraine Stavchuk Iryna Climate change program coordinator National ecological centre of.
Ad Hoc Working Group on Article 3.9 of the Kyoto Protocol Battling global climate change - the EU’s perspective (Part II) Artur Runge-Metzger European.
UNFCCC Workshop, 9/ /1 2004, Dublin. September 30 – October 1, 2004, Dublin, Ireland Jiří Spitz ENVIROS, s. r. o. Czech Republic UNFCCC Workshop,
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
Case Study: Hungary Jozsef Feiler Climate Protection and Energy Unit.
The Austrian JI/ CDM programme Forum MPD Maroc Marrakech, April the 21st and 22nd 2004 Mag. Angela Friedrich Ministry of Environment, Austria.
Ralf Goldmann JASPERS Activities in the sector of Renewable Energy and Energy Efficency Jaspers Workshop 28 November 2007.
GERMAN SUPPORT for CDM CAPACITY BUILDING Marrakesh, Morocco 22. April 2004 Holger Liptow Climate Protection Programme (CaPP) CaPP.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Status of Joint Implementation and Green Investment Scheme Vlad Trusca Ministry of Environment and Sustainable Development Romania - Annual meeting of.
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
Brewer - Stockholm Uncertainty about Emission Rights and Energy Prices - and Impact on Economic Growth Thomas L. Brewer Associate Professor,
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Overview of Carbon Markets Voluntary & Compliance Markets: Existing Carbon Reduction Units Vladimir Litvak RBEC Energy and Environment Practice Leader.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. State and Trends of the.
DER SPEZIALIST FÜR PUBLIC CONSULTING GIS from the perspective of a governmental Buyer – Experience & Expectations The Austrian JI/CDM Programme Birgit.
1 Flooding in Europe Reference : PESETA. 2 Impacts in European coastal areas Impacts in European coastal areas Impact of adaptation Impact of adaptation.
POLAND AS JOINT IMPLEMENTATION HOST COUNTRY – GREAT POTENTIAL CONTRA POOR MANAGEMENT? Anna Pasławska, EPA SP. Z O.O. European Wind Energy Conference &
Green Investment Scheme in Bulgaria Christo Christov, Energy Institute, Bulgaria Workshop Facilitation Green Investment Scheme: first lessons learnt and.
Carbon Trade & Finance is a joint venture between Dresdner Bank and Gazprombank Opportunities and challenges in the Russian carbon market Moscow Carbon.
Latest on Bioenergy in the EU Emissions Trading System and in the CDM Latest on Bioenergy in the EU Emissions Trading System and in the CDM B. Schlamadinger.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Energy Efficiency in District Heating and Joint Implementation Mark van Wees CAP SD Energy and Climate Consultants Moscow, August 2006.
Green Investment Schemes: Maximizing their benefits for climate and society Diana Urge-Vorsatz 24th. April.2008.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Joint Implementation in the Czech Republic - building on our own experience Climate Change Department Tomas Chmelik Pavel Zamyslicky Climate Change Department.
Tenth meeting of the EAP Task Force’s EECCA Environmental Finance Network Environmental Financing Trends in South Eastern Europe Joanna Fiedler Senior.
Joint Implementation by the Netherlands Maurits Henkemans Ministry of Economic Affairs Netherlands Moscow.
First UNFCCC Workshop on the implementation of JI projects under Article 6 of the Kyoto Protocol Moscow, May, 2004 Proposal on procedures of registration.
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
1 Technology Transfer and Investment Risk in International Emissions Trading FP6 – Priority 8 - Policy-oriented Research Funded by: European Commission,
Role of the Fund in supporting ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES PROJECTS in Croatia - general informations REPUBLIC OF CROATIA ENVIRONMENTAL.
Portfolio of Biomass Projects in the Czech Republic David Viduna BTG Central Europe s.r.o. San Salvador, March 28, 2003.
Climate Action Meeting the EU’s Kyoto commitments & Avoiding a gap after 2012 Doha, 27 November 2012 Paolo CARIDI Policy Coordinator DG Climate Action.
Experience with JI projects in the Czech Republic Climate Change Unit Tomas Chmelik Climate Chnage Unit Ministry of the Environment of the Czech Republic.
Green Investment Scheme in Russia: Perspectives and Constraints Julia Dobrolyubova Expert on Climate Change and Kyoto Protocol REC/CEU GIS Workshop
Climate Change October Main concepts Climate change – lasting change of some or all characteristics, describing the average weather condition Greenhouse.
UNFCCC Technical Workshop on JI: Incentives and Barriers Jan-Willem van de Ven Head of Secretariat Multilateral Carbon Credit Fund October 16, 2007.
GHG projections of Romania-How much is available? April 30 Bucharest, Romania Gamze Celikyilmaz-Aydemir Climate Change Department The Regional Environmental.
Status of Joint Implementation in Russia Helmut SCHREIBER The World Bank Europe and Central Asia Region Infrastructure and Energy Services Department.
Land Use, Land Use Change and Forestry (LULUCF) European Commission expert group on forest fires Antalya, 26 April 2012 Ernst Schulte, DG ENV on behalf.
Policy, normative base and experience of Kyoto Protocol implementation in Bulgaria and other Central European Countries Daniela Stoycheva Consultant emissions.
How green the Hungarian energy policy? The efficiency and renewable developments and trends by Dr.Miklós Poós Director, Ministry of Economy and Transport.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
EBRD and Emissions Trading Financing GHG emission reduction projects 29 September 2009, Sofia Friso de Jong Carbon Finance Analyst Energy Efficiency and.
Estonia’s strategies regarding Joint Implementation and Green Investment Scheme Eve Tamme Estonian Environment Information Centre.
September 29, 2009 Sagacarbon seminar, sofia.
Sellers’ strategies regarding Joint Implementation Company Perspective
Spanish Policy on flexible mechanisms
Joint Implementation in Romania
UNFCCC Technical Workshop on Joint Implementation
Implementation of the Kyoto protocol mechanisms in the Czech Republic
Valdis Bisters Director Climate Policy and Technology Department
UNFCCC JI Workshop, Bonn
Possibilities for promoting environmental protection projects
Presentation transcript:

Green Investment Scheme (GIS) in the Czech Republic Petr Jan Kalaš Moscow Carbon Market Forum 2008 Ministry of Environment Vršovická Praha 10 Czech Republic Moscow, 28 April 2008

Last development in the Climate Change Agenda 14 November 2007 – Czech government made decision about the further GIS implementation steps 1 January Kyoto Commitment Period and the second EU ETS period were started 21 January EU Commission published the EU Climate-Energy Package proposal 24 February Czech Republic is fully eligible under the Kyoto Protocol

GHGs Emissions trends GHGs comparison 1990 vs – 24%

Joint Implementation (JI) overview About 35 projects – LoA was issued (possibility to choose between Track 1 and Track 2) Problems with future potential for new JI projects EU ETS (Linking Directive - limited potential for new JI projects in the current regime in all EU MS) Question of additionality (feed-in-tariff, Operational Programme Environment, Operational Programme Enterprise and Innovation, etc.) New JI projects – only heating (biomass, biogas) and non – CO2 projects (landfill gas projects) Reserve allowances per year in NAP2 for indirect linking (only RES projects with LoA) EU ETS operators can use 10 % (CERs and ERUs) in the second NAP

GIS Implementation in the Czech Republic (I) MoU – Denmark, Austria (under preparation - Japan, Netherlands, Spain, Finland, etc. ) Expected (surplus) amount 100 million AAUs per Kyoto commitment period ( ) Potential buyers – governments/private sector Greening facility – State Environmental Fund ( “The resources from the SEF are one of the most important instruments of state environmental policy. Domestic resources (mainly in some kind of measures) are limited“.

GIS Implementation in the Czech Republic (II) In programming goals of the Czech Government till 2010 is mentioned that revenues from IET will be used for financing energy savings in family houses and flats, administrative and public buildings. Czech government priority – Housing sector fuel switching from lignite (still approx households is heating directly by coal) to biomass (potential approx households - 2 Mt CO 2 per year), or/and improvement of thermal insulation, eventually fuel switching from lignite to central heating system/gas (additional potential around - 1 Mt CO2 per year ) Other sectors --- has not been decided yet (gaps between various type of funds, avoid „double-counting“ situation)

Energy savings need to be improved in the building sector 1,2 Mio flats / ~15 PJ / ~ - 35 Mt CO 2

Organisational scheme of GIS

GIS Implementation in the Czech Republic (III) Ministerial GIS WG was established Main tasks – on the international/domestic side Pending issues –Legal/Financial (amendment of law about conditions of trading with allowances etc., preparation of auction, taxes, accounting questions, ERPAs) –Technical/Organizational (preparation of grants, documentation, criteria, validation, reporting, verification, call of proposal) general question – connection of CITL/ITL Pilot transaction should be done by the end of 2008 –Both, bilateral contracts, auction could be used

Thank you for your attention !