LARGE SYSTEMS IMPLETATION PROCESS  Overview Review process diagram homework practice.

Slides:



Advertisements
Similar presentations
Enterprise Support Trends
Advertisements

Management, Leadership, & Internal Organization………..
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Chapter 6 Enterprise e-Business Systems.
Chapter 15: Packaged Software and Enterprise Resource Planning
Manufacturing’s Objectives
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Bringing Profitability Into Focus Optimizing the Chemical Value Chain
Omercan Barut Dokuz Eylul University Industrial Engineering.
Session 4808 Using APICS Body of Knowledge to Prepare for APO Stephen Desirey, CFPIM DuPont Company Session Code: 4808.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
1 SYS366 Week 1 - Lecture 2 How Businesses Work. 2 Today How Businesses Work What is a System Types of Systems The Role of the Systems Analyst The Programmer/Analyst.
RATIONALE FOR ERP SYSTEMS  One of the key reasons why managers have sought to proceed with difficult ERP projects is: to end the fragmentation of current.
TUC Thumbs Up Consulting TUC Thumbs Up Consulting April 22, Putting the Enterprise into the Enterprise System TUC Thumbs Up Consulting by Thomas.
Change is a Process Organizational Stages Individual Stages (ADKAR) Business Need Concept and Design Implementation Post-Implementation Awareness Desire.
Iterative development and The Unified process
OPERATIONS and LOGISTICS MANAGEMENT
Types of Systems  Impact of systems implementation on organization change? Transaction Processing Systems (TPS) Management Information Systems (MIS) Decision.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Navision Business Analytics Joyce Leung, Partner Technology Specialist.
Aligning Training with Strategy
 The Fundamental Reasons Behind The Failure Of ERP System SYSM 6309 Advanced Requirements Engineering By Shilpa Siddavvanahally.
ERP, CRM, SCM Source: O’Brien, James. Introduction to Information Systems, 12e, 2005.
Lean Manufacturing Case Study Prototype Design-Build.
1 IT STRATEGY: S ETTING A D IRECTION FOR I NFORMATION R ESOURCES.
ERP Benefits.
McGraw-Hill/Irwin Copyright © 2009 by the McGraw-Hill Companies, Inc. All rights reserved.
Business policy and strategic Management
Electronic Commerce Semester 2 Term 2 Lecture 29.
HOW DO INFORMATION SYSTEM SUPPORT THE MAJOR BUSINESS FUNCTION?
Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 1 Introduction Managers and Managing.
Chapter 7 Weaving Marketing into the Fabric of the Firm Eaton.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Business Across the Enterprise.
7-1 McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved.
Enterprise Resource Planning
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #10.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Chapter 8 Management, Leadership, and Internal Organization Learning Goals Define management and the skills necessary for managerial success. Explain the.
Enterprise Resource Planning module-3. ERP- A curtain Raiser The business has changed more in past five years than it did over the previous five decades.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Slides used in class may be different from slides in student pack Managerial Briefing 13 Enterprise Resource Planning Systems  Enterprise Resource Planning.
1-1 Human Resource Management Gaining a Competitive Advantage Chapter 2 Strategic Human Resource Management McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill.
COMPETENCY MAPPING ASSESSMENT & DEVELOPMENT BY : SUBHASHIS CHATTERJEE Sr. MGR (PERSONNEL)
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
Human Resource Management Gaining a Competitive Advantage
Systems Analysis & Design 7 th Edition Chapter 2.
Jayendra Rimal. Introduction: Compensation Compensation refers to all forms of financial returns and tangible benefits that employees receive as part.
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
E-commerce Strategy Ing. Athanasios Podaras, Ph.D Faculty of Economics
Management Information Systems
SAMPLE Develop a Comprehensive Competency Framework
Navision Business Analytics
Lec 3: STRATEGIC COST MANAGEMENT (SCM)
بسم الله الرحمن الرحيم غرفة صناعة عمان معهد إيجابي
ENTERPRISE BUSINESS SYSTEMS
Continuous improvement is the process by which organizations frequently review their procedures, aiming to correct errors or problems. The most effective.
By Jeff Burklo, Director
ECT 589: E-Commerce Management
Management, Leadership, and the Internal Organization
ERP, CRM, SCM Source: O’Brien, James. Introduction to Information Systems, 12e, 2005.
Management, Leadership, and the Internal Organization
Management, Leadership, and Internal Organization
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
Enterprise Business Systems
Accounting Discipline Overview
Manufacturing’s Objectives
Presentation transcript:

LARGE SYSTEMS IMPLETATION PROCESS  Overview Review process diagram homework practice

LARGE SYSTEMS IMPLETATION PROCESS  Reduction Divide the project into phases Activities in subsequent phase are dependent on the completion of prior phase Simultaneous tasks within each phase

Change is a Process Organizational Stages Individual Stages (ADKAR) Business Need Concept and Design Implementation Post-Implementation Awareness Desire Knowledge Ability Reinforcement

The Processes Stage Description Awareness of need for change -- reasons, and degree of comprehension Desire to participate and support -- motivating factors and consequences and level Knowledge about how to change -- skills and insights Ability to implement new skills and behaviors -- evaluate level and determine shortcomings Reinforcement to keep the change in place -- incentives and constraints to make it stick For Individual Change Management

LARGE SYSTEMS IMPLETATION PROCESS  Phase I: Estimated time duration 9-12 months Build the awareness Emphasis clearly the need to change Motivated people and get them interested in the idea of large system implementation from effectiveness and efficiency point of view

LARGE SYSTEMS IMPLETATION PROCESS  Phase I - Includes: Sales & Operations Planning, Demand management, Rough-Cut Capacity Planning, Master scheduling, Material Requirements Planning, Plant scheduling where practical, and Necessary applications for finance and accounting. Inventory accuracy, Bill of material accuracy and structure, Plus activating the feedback loops from the plant floor and purchasing

LARGE SYSTEMS IMPLETATION PROCESS  Phase II  Estimated time duration: 3 – 6 months  Emphases the desire, knowledge and ability to change to participate and support Knowledge about how to change include skills required Abilityto implement new skills and behaviors  Technical Integrations Within the organization Downstream Upstream

LARGE SYSTEMS IMPLETATION PROCESS  Phase III  Estimated time duration: several months to one year Least defined phase Free form Planned and unplanned problems  Extension to Support Corporate Strategy  Reinforcement to keep the change in place -- incentives and constraints to make it stick

LARGE SYSTEMS IMPLETATION PROCESS  Phase III  Enhancements activities Simulation capabilities, Advanced planning systems (APS), Manufacturing execution systems (MES), Enhanced customer order entry processes, Development of a supplier rating system, and so forth.

Large Systems Implementation Challenges  Its not Priority #1  Leave change management to consultants  Underestimate the amount of work due to lack of experience  People-intensive  Requires senior management leadership and participation

Large Systems Implementation Challenges  Involves the entire enterprise  New thinking and new processes  New tools and retooling  Too intensive for too long  Unplanned problems and changes  Schedule Slippage Work, Time, Resources

The ERP Market Support  ERP supports about 70-95% of a large organizational need  The remaining 5-30% Interfacing the ERP application with existing legacy systems using middleware, which adds to the complexity Interfacing ERP to third-party solutions. Writing custom software to extend functionality. Modifying the ERP source code directly.

Large Systems Implementation  Time Related Issues Total project time can range from one year to 3+ years  Why such a long time span? Organizational size Organization complexity Resources allocation Scope of implementation especially phase

Large Systems Implementation  Critical Time Related Issues Implement basic ERP in phase I If done well you can carry some of the lessons learned to same time in phase II Avoid scope creed.  If it is not basic move it to phase II Identify time zero?

Large Systems Implementation  Getting Ready  First Cut Education What is ERP? Is it for us? Does it make sense for our business? What will it cost? What will it save? What are the benefits we’ll get if we do it the right way and get to Class A?

Large Systems Implementation  Mission Statement The executives’ and managers’ knowledge of: The company and its problems. (Where are we today?) Its strategic direction. (Where are we going?) Its operating environment. (What does the marketplace require?) Its competition. (What level of performance would gain us a competitive advantage in that marketplace?)  What was learned in first-cut education.