Drift velocity and tracking Michele Faucci Giannelli, Mike Green, Fabrizio Salvatore.

Slides:



Advertisements
Similar presentations
The Maximum Likelihood Method
Advertisements

MC simulation of test beam events Fabrizio Salvatore (RHUL)
Name:_____________________________________ Date :___________________________________________ Use models, equations, and explain your reasoning to answer.
1 Calice Analysis 02/03/09 David Ward ECAL alignment update David Ward  A few thoughts about ECAL alignment  And related issue of the drift velocity.
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
TRACK DICTIONARY (UPDATE) RESOLUTION, EFFICIENCY AND L – R AMBIGUITY SOLUTION Claudio Chiri MEG meeting, 21 Jan 2004.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Drift Chambers at DESY and CERN Mike Green, Fabrizio Salvatore, Michele Faucci Giannelli.
Status of Tracking at DESY Paul Dauncey, Michele Faucci Giannelli, Mike Green, Hakan Yilmaz, Anne Marie Magnan, George Mavromanolakis, Fabrizio Salvatore.
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
Preliminary analysis of ZHH events (2) Michele Faucci Giannelli, Mike Green, Fabrizio Salvatore Royal Holloway, University of London UK CALICE UK-SOFTWARE.
© Imperial College LondonPage 1 Preliminary Studies of the Tracking Resolution at DESY Hakan Yilmaz.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
ZHH channel: software and detector performances for ILC Michele Faucci Giannelli Fabrizio Salvatore Mike Green, Tao Wu.
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
Applications of Consecutive Integers
MINIDRFIT BEAM TEST APPLY IN-LAB UNIVERSAL CORRECTION EIC Tracking Meeting Oct. 27, 2013 B.Azmoun, M.Phipps, BNL.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
Physics 114: Lecture 15 Probability Tests & Linear Fitting Dale E. Gary NJIT Physics Department.
The LiC Detector Toy M. Valentan, M. Regler, R. Frühwirth Austrian Academy of Sciences Institute of High Energy Physics, Vienna InputSimulation ReconstructionOutput.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
GEM MINIDRIFT DETECTOR WITH CHEVRON READOUT EIC Tracking Meeting 10/6/14 B.Azmoun, BNL.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
Detector Alignment Thomas Naumann DESY Zeuthen n Detector alignment and calibration often imply least squares fits with many parameters : n n global parametersof.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Analysis Techniques for Estimating Intrinsic.
solve x + (-16) = -12 solve x + (-16) = X = 4.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
TB model improvements in Mokka and status of MC production Fabrizio Salvatore Royal Holloway University of London.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
N. Saoulidou & G. Tzanakos1 Analysis for new Period 3 Events N. Saoulidou and G. Tzanakos University of Athens, Department of Physics’ Div. Of Nuclear.
CLAS12 Torus Magnetic Field Mapping Torus Magnetic Field - qualitative look at the field distribution How well do we need to know the B-field? - momentum.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Giuseppe Ruggiero CERN Straw Chamber WG meeting 07/02/2011 Spectrometer Reconstruction: Pattern recognition and Efficiency 07/02/ G.Ruggiero - Spectrometer.
R. Kass/W03 P416 Lecture 5 l Suppose we are trying to measure the true value of some quantity (x T ). u We make repeated measurements of this quantity.
Algebra Core Review. Unit 1: Real Numbers Natural Numbers: Whole Numbers: Integers:
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
9 Sep 2008Paul Dauncey1 Tracking software status Paul Dauncey.
Pattern recognition with the triplet method Fabrizio Cei INFN & University of Pisa MEG Meeting, Hakata October /10/20131 Fabrizio Cei.
3.4 Using Equations to Solve Problems Objective: To use the five-step plan to solve word problems. Warm – up: State three consecutive integers. State three.
11 Sep 2007Tracking - Paul Dauncey1 Tracking Code Paul Dauncey, Imperial College London.
Comparison of algorithms for hit reconstruction in the DTs: Test of calibration procedures for t trig and drift velocity on Test Beam data Test of calibration.
Michele Faucci Giannelli
M. Kuhn, P. Hopchev, M. Ferro-Luzzi
Final Jeopardy Challenge
CLAS12 Torus Magnetic Field Mapping
Tracking System at CERN 06 and 07 test beams
DESY TB05: Drift Chambers simulation
Reconstruction of TauTau events
DESY drift chambers efficiency and track reconstruction
Regression Statistics
ZHH: Linear collider Benchmark
LHCb Alignment Strategy
Michele Faucci Giannelli
ZHH Analysis preliminary results on different detector models
Drift Chamber Monitoring
Test Beam models in Mokka
Beam properties for run
Presentation transcript:

Drift velocity and tracking Michele Faucci Giannelli, Mike Green, Fabrizio Salvatore

Drift velocity Several suggestion, no definitive answer. –Scatter plot –Ratio –Sum of consecutive chambers –Recursive methods –… The fact is this is a system with 8 equations and 10 variables. Some approximations are needed.

Drift velocity ECal DC1 DC2 DC3DC4 t1t1 t2t2 t3t3 t4t4 All quantity have to be considered averaged Offset between DC1-DC2 and DC3- DC4 is 0.2mm, negligible on first approximation Y should be easier because of the better alignment: –OffY DC should be very small

X ECAL vs t DC

(36-X ECAL )/t DC

(T 1 +T 2 )/L

Results First method abandoned, in case fit a 2D Gauss and take the axis. Second method (X only) Third method, v1=v2 and v3=v4 (Y too) RunEnergyDC1DC2DC3DC ,03050,02840,03460, ,0310,02820,03860, ,03050,02840,0350, ,03050,02820,03450, ,03030,02820,03420, ,03010,02780,0340, ,50,02990,02780,03390,0294 DC1-2 X0,0296 DC1-2 Y0,0303 DC3-4 X0,0327 DC3-4 Y0,0273

New proposal Get the mean from DC hits and Ecal hits from 1000 events Plot similar to scatter plot but insensible to beam spread The problem is the Ecal, the mean of the distribution is 19 while should be 0.

Suggestion for tracking software TDCXXX TrackerHit TBTrackProjection TBTrack MCDATA DriftChamberDigitizationDriftChambertoTrack TBTrackCombiner DataBase DBHandler The LCIO class LCVector (DESY) TDCContainer (CERN) DriftChamberParameters +GetDriftVelocity() +GetOffsetX() +GetOffsetY() +Set… -DriftVelocity: real -Errors: real matrix -OffsetX: real -OffsetY: real +GetXatEcal() +GetXatHcal() +GetXatTC() +GetErrorX…() +GetXatZ(real) -Theta: real -Offset: real -Error: real matrix -XTracks: TBTrackProjectionVec -YTracks: TBTrackProjectionVec +NTrack: integer +GetX() +GetY() +GetNTracks() +GetXTrack(int) +GetYTrack(int)

In details Database: –has to contain efficiency parameter? TBTrackProjection: –Get value and error at calorimeters –Get value and error at Z TBTrack: –Number of tracks –Get best X and Y projection –Get requested X and Y projection

Processors DCDigitization: –Need DB interaction to get drift velocity and intrinsic resolution, more news after Roman-Anne Marie meeting. –Re-Check that the hit is well selected DCtoTrack: –New output –New fit class as to be used –How to clean bad hits? I’m using only 34<t<2*peak, any better idea?

Processors(2) TrackCombiner: –Has to be written from scratch –What to do if X has 2 good tracks and Y only 1? DBHandler: –No idea if it has to be rewritten or if we can use the old one.