Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.

Slides:



Advertisements
Similar presentations
Astrometry and EPIC flux cross-calibration in 2XMMp/2XMM Silvia Mateos R. Saxton, S. Sembay and the XMM-Newton Survey Science Centre.
Advertisements

XMM EPIC Andy Read IACHEC 2013 Leicestershire, UK, 25-28/03/13 XMM-Newton EPIC Cross- Calibration Andy Read With contributions from Matteo.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
Isabel Caballero, Anne Wellbrock Page 1 XMM-Newton ESAC XMM-Newton EPIC relative timing analysis Isabel Caballero Anne Wellbrock M.G.F. Kirsch.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Saclay 24/09/03 Epoch dependant MOS QE and RMF and Cross-calibration with the PN.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
Evaluation of the EPIC flux cross-calibration from 2XMM sources R. Saxton, S. Mateos, A. Read, S. Sembay Mateos et al., 2009, A&A, arXiv
XMM EPIC MOS Andy Read EPIC Calibration Meeting Leicester University 30/09/04 Addendum to 1ES0102 Study - Search for similar low-energy.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
The problem with double event patterns (M. Brusa, K. Dennerl – MPE) EPIC CAL/OPS meeting - MPE.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
Energy Calibration using SNRs: preliminary results Andrea Tiengo INAF, IASF-Milano Mallorca, 6 November 2007 EPIC Calibration Meeting.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Status of EPIC time jump problems Marcus.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
XMM-Newton 1 A.Garcia, ESAC Spectral effects of PSF core excisting Madrid, 24. March 2009.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Frank Haberl EPIC cal meeting, Palermo, April 2007 EPIC-pn effective area and response Effective area above 4 keV Gain/CTI correction TI mode Re-distribution.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
XMM Bruno Altieri -- SCI-SDX EPIC astrometry update EPIC CAL/OPS meeting Vilspa, March 2003 B. Altieri.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Amon Presentation: 23 April 2002Page 1 XMM-Newton In-Orbit.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
Conclusions We established the characteristics of the Fe K line emission in these sources. In 7 observations, we did not detect the source significantly.
PSF in-flight calibration - PN IFC/CNRRingberg, April 2-4, 2002 PSF in-flight calibration for PN camera Simona Ghizzardi Silvano Molendi.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
Two views of brain function Marcus E. Raichle Trends in Cognitive Sciences Volume 14, Issue 4, Pages (April 2010) DOI: /j.tics
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
The reading is 7.38 mm. The reading is 7.72 mm.
Experience with combined Fe55 / Tycho SNR calibration
Some Result of HyCal Resolution
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Long-term trends in EPIC pn energy response
Presentation transcript:

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing Mode Marcus G. F. Kirsch

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 2 XMM-Newton EPIC menu current status of timing mode energy calibration calibration proposal

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton EPIC useful data 1E –OBS –rev 447 –LW and Timing Mode for both cameras

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 4 XMM-Newton EPIC 1E MOS1 black: LW red: Timing

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 5 XMM-Newton EPIC 1E MOS2 black: LW red: Timing

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 6 XMM-Newton EPIC 1E LW-Mode black: MOS1 red: MOS2

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 7 XMM-Newton EPIC 1E Timing-Mode black: MOS1 red: MOS2

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 8 XMM-Newton EPIC fitting the lines: LW vs. Timing Timing mode is overcorrected by up to 1.5 % trend is similar for both MOSs

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 9 XMM-Newton EPIC fitting the lines: M1 vs. M2 differences between both MOSs per mode less than 0.7 %

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 10 XMM-Newton EPIC absolute line pos.diff. M1 LW-T: -8eV eV M2 LW-T: -7eV eV Ti M2-M1: +2eV - -8eV LW M2-M1: 0eV - -7eV

Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 11 XMM-Newton EPIC conclusion energy in Timing mode is overcorrected by up to 1.5 % energy differences between both MOSs in LW mode less than ~0.7 % differences between both MOSs in Timing mode less than ~0.5 % proposal: fix differences between LW and Timing mode with an energy dependent tuning function (as also successfully done for the pn)