Dealing With Uncertainty

Slides:



Advertisements
Similar presentations
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Advertisements

Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 18-1 Developed.
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
COMPARING ALTERNATIVES
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Engineering Economic Analysis Canadian Edition
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
CHAPTER 8 PRICE CHANGES and ECHANGE RATES. Definitions Inflation –An increase in the average price paid for goods and services bringing about a reduction.
Chapter 11 Replacement Decisions
Engineering Economics in Canada
COMPARING ALTERNATIVES
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Sensitivity and Breakeven Analysis
Chapter 15 Replacement Decisions
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
CHAPTER 9 Replacement Analysis.
Financial and Managerial Accounting
Intro to Engineering Economy
Summer Time Value of Money Session 2 07/02/2015.
Chapter 7 Rate of Return Analysis
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Capital Budgeting Decisions
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Engineering Economic Analysis Canadian Edition
Evaluating a Single Project
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
CHAPTER 10 DEALING WITH UNCERTAINTY. RISK Risk and uncertainty are similar in that they both present the problem of not knowing what future conditions.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Copyright ©2015 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Sixteenth Edition By William.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Blank & Tarquin: 5 th edition. Ch.13 Authored by Dr. Don Smith,
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 6: Comparison and Selection Among Alternatives
Discounted Cash Flow Analysis
Chapter 5: Evaluating a Single Project
Lecture slides to accompany Engineering Economy, 8th edition
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Project Cash Flow Analysis
Formalized Sensitivity Analysis and Expected Value Decisions
Chapter 6: Comparison and Selection Among Alternatives
Chapter 11: Breakeven and Sensitivity Analysis
Capital Budgeting Techniques
Chapter 6: Comparison and Selection Among Alternatives
Presentation transcript:

Dealing With Uncertainty CHAPTER 10 Dealing With Uncertainty

RISK Risk and uncertainty are similar Both present the problem of not knowing what future conditions will be Risk offers estimates of probabilities for possible outcomes Uncertainty does not provide estimates of probabilities for possible outcomes This book treats them as interchangeable

Four Major Sources Of Uncertainty Possible inaccuracy of cash-flow estimates used in the study How much source information is available How dependable is the source information Type of business relative to the future health of the economy Some businesses will typically be more at risk when there is a general decline in the economy Type of physical plant and equipment involved Some equipment have more definite lives and MV than the others (general lathe machine vs. mining equipment) Length of study period The longer the study period, the greater the level of uncertainty of a capital investment

Sensitivity Analysis Sensitivity – The degree to which a measure of merit (I.e., PW, IRR, etc…) will change as a result of changes in one or more of the study factor values Sensitivity Analysis Techniques Breakeven Analysis Sensitivity Graph (spiderplot) Combination of factors

Breakeven Analysis Useful for choosing among alternatives when costs or revenues are highly sensitive to a single factor that is hard to estimate (e.g., operating hours per year, useful life, etc.) General Procedure: Write an expression of equivalent worth for each alternative in terms of the common factor. Equate the equivalent worths and solve for the value of the common factor. This value is the breakeven point (B.E.P.). Estimate whether the actual factor value will be higher or lower than the B.E.P. and then choose the appropriate alternative.

Breakeven Problem Involving Two Alternatives Indifference between alternatives (EWA = f1(y); EWB = f2(y) EWA = EWB; f1(y) = f2(y) : Solve for y Economic acceptability of engineering project EWp = f(z) = 0 The value of ‘z’ is the value at which we would be indifferent between accepting or rejecting the project

Example Suppose that there are two alternative electric motors that provide 100 hp output. An Alpha motor can be purchased for $12,500 and has an efficiency of 74%, an estimated life of 10 years, and estimated maintenance cost of $500 per year. A Beta motor will cost $16,000 and has an efficiency of 92%, a life of 10 years, and annual maintenance costs of $250. Annual taxes and insurance costs on either motor will be 1-1/2% of the investment. If the minimum attractive rate of return is 15%, how many hours per year would the motors have to be operated at full load for the annual costs to be equal? Assume that salvage values for both motors are negligible and that electricity costs $0.05 per kilowatt-hour.

Formulation Decision Criterion: Minimize Equivalent Uniform Annual Cost (AC) AC = CR + Operating cost + Taxes & Ins. + Maintenance Alpha Beta Purchase Price $12,500 $16,000 Maintenance Cost/yr 500 250 Annual Taxes & Insurance 12,500(0.015) 16,000(0.015) Efficiency 74% 92% Useful Life (yrs) 10 10 Note: Electrical Efficiency = power output , and 1 hp = 0.746 kW At breakeven, ACa = ACb $2,490 + $5.04X + $500 + $187 = $3,190 + $4.05X + $250 + $240 or $3,177 + $5.04X = $3,680 + $4.05X. Solving for X, we find X = 508 hrs/year

Sensitivity Graph (Spiderplot) Makes explicit the impact of uncertainty in the estimates of each factor of concern on the economic measure of merit Annual revenue and expenses Rate of return Market (or salvage) value Equipment Life Capacity utilization

Example A machine for which most likely cash flow estimates are given in the following list is being considered for immediate installation. Because of the new technology built into this machine, it is desired to investigate its PW over a range of 40% in: (a) initial investment, (b) annual net cash flow, (c) salvage value, and (d) useful life Based on these estimates, how much can the initial investment increase without making the machine an unattractive venture? Draw a diagram that summarizes the sensitivity of present worth to changes in each separate parameter when the MARR = 10% per year

Example: Solution PW(10%) = -11,500 + 3,000(P|A,10%,6) + 1,000(P|F,10%,6)= $2,130 a) When the Initial Investment varies by ±p% PW=(1± p% /100)(-11,500) + 3,000(P|A,10%,6)+ 1,000(P|F,10%,6) b) When Net Annual Cash Flow varies by ±a% PW = -11,500+(1± a% /100)(3,000)(P|A, 10%,6)+1,000(P|F,10%,6) c) When Salvage Value varies by ±s% PW = -11,500+3,000(P|A,10%,6)+(1± s% /100 )(1,000)(P|F,10%,6) d) When the Useful Life varies by ±n% PW = -11,500+3,000[P|A,10%,6(1± n% /100 )] +1,000[P|F,10%,6(1± n% /100)]

Sensitivity Graph (Spiderplot) Of Four Factors PW (10%) 7000 Capital Investment 6000 5000 Annual Net Cash Flow, A $2130 Useful Life, N 4000 3000 Market Value, MV 2000 %Deviation Changes in Factor Estimate % Deviation Changes in Factor Estimate 1000 - 40 -30 -20 -10 +10 +20 +30 +40 -1000 -2000 -3000 -4000

Revelations Of Spiderplot Shows the sensitivity of the present worth to percent deviation changes in each factor’s best estimate Other factors are assumed to remain at their best estimate values The relative degree of sensitivity of the present worth to each factor is indicated by the slope of the curves (the “steeper” the slope of a curve the more sensitive the present worth is to the factor) In this example: Present worth is insensitive to MV Present worth is sensitive to I, A, and N

Measuring Sensitivity By A Combination Of Factors Develop a sensitivity graph for the project Use sensitivity graph to select most sensitive project factors. Analyze combined effects of these factors on project’s economic measure of merit

Example - Continued Which parameter is most sensitive to change? PW(10%) = 0 when Initial Investment increases 18.5% PW(10%) = 0 when Net Annual CF decreases 16.3% PW(10%) = 0 when Salvage Value decreases 378% Note: requires a negative Salvage Value PW(10%) = 0 when Useful Life decreases 21.7%

Optimistic - Pessimistic Estimates Exploring sensitivity by estimating one or more factors in a favorable direction and in an unfavorable direction to investigate the effect on study results. Optimistic - 95th percentile (desirable) Pessimistic - 5th percentile (undesirable) Not only do we examine the Equivalent Worth (EW) for all three estimation conditions, we examine the EW for all combinations of estimated outcomes for the key factors being estimated.

Problem 10-18 (page 455) Suppose for an engineering project the optimistic, most likely, and pessimistic estimates are as shown below Optimistic Most Likely Pessimistic Capital Investment -$80,000 -$95,000 -$120,000 Useful Life 12 years 10 years 6 years Market Value $30,000 $20,000 0 Net Annual CF $35,000 $30,000 $20,000 MARR 12%/yr 12%/yr 12%/yr a) What is the AW for each of the three estimation conditions? b) It is thought the most critical elements are useful life and net annual cash flow. Develop a table showing the AW for all combinations of estimates for these two factors, assuming that all other factors remain at their most likely values.

Problem 10-18 Set up AW(12%) = Set up a table to illustrate summary results: Useful Life Net Annual O ML P Cash Flow (12 yrs) (10 yrs) (6 yrs) O $35,000 ML $30,000 P $20,000

Dealing with Uncertainty Uncertainty causes factors to become random variable in engineering economy analysis Risk-Adjusted MARR A widely used industrial practice for including some consideration of uncertainty is to increase the MARR Reduction of useful life By dropping from consideration those revenues (savings) and expenses that may occur after a reduced study period, heavy emphasis is placed on rapid recovery of capital in early years of a project’s life This method is closely related to the discounted payback technique and suffers from most of the same deficiencies