Accelerator Plans at KEK

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

ILC Accelerator School Kyungpook National University
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
Overview of SuperKEKB M. Tawada (KEK) Super B Factory Workshop in Hawaii April 20, 2005.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
10 36 ??? 20 Apr K. Oide Super B Workshop.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
1 SuperKEKB Upgrade project of KEKB KEK Yukiyoshi Ohnishi.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
SR Monitors for SuperKEKB J.W. Flanagan KEK Mini-Workshop
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Status of the accelerator upgrade Dec Mika Masuzawa mm 12/10/2008.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Principals of fast injection and extraction R. Apsimon.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
ILC DR Lower Horizontal Emittance, preliminary study
MDI and head-on collision option for electron-positron Higgs factories
T. Agoh (KEK) Introduction CSR emitted in wiggler
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam-beam effects in eRHIC and MeRHIC
SuperB Injection, RF stations, Vibration and Operations
Large Booster and Collider Ring
The PEP-II Interaction e+e- Factories Workshop
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Physics Design on Injector I
Proposal for a CESR Damping Ring Test Facility
MEIC New Baseline: Performance and Accelerator R&D
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Presentation transcript:

Accelerator Plans at KEK John W. Flanagan, KEK Super B Factory Workshop Honolulu 19 January 2004

LoI: Accelerator Design for a Super B Factory at KEK Machine Parameters Beam-Beam Interactions Lattice Design Interaction Region Magnet System Impedance and Collective Effects RF System Vacuum System Beam Instrumentation Injector Linac Damping Ring Construction Scenario

SuperKEKB Machine Parameters

Beam-Beam Interactions Simulation Methods Particle distribution Gaussian: bunch shape fixed Particle-in-Cell (PIC): arbitrary bunch shape possible Should be more accurate, though numerical noise may be a problem. Coherent dipole motion causes growth in beam size and reduction of luminosity in PIC model. (Not seen in Gaussian model). Beam-beam limit (zero crossing angle) Tune difference may help smear out coherent motion. Improvement in luminosity with different tunes (~KEKB)

Simulation: Crossing Angle Dependence Luminosity reduced with a crossing angle Geometric effects Nonlinear diffusion -> beam size growth

Simulation: Crab-Crossing Crab-crossing restores full luminosity of a head-on collision.

Simulation: Other Parameters Lower horizontal beta function improves luminosity. Lower emittance does not. Best current ratio: 10A (LER) / 4.4 A (HER) Energy transparency ratio

Beam Optical Parameters of SuperKEKB: Lattice Design Beam Optical Parameters of SuperKEKB:

Non-interleaved 2.5-Pi Cell Lattice Non-interleaved 2.5-Pi Cell Wide tunability of horizontal emittance, momentum compaction factor. Principle nonlinearities in sextupole pairs cancelled out to give large dynamic aperture

Lattice IR region: main difference from KEKB is greater overlap of solenoid field on final-focus quadrupoles. No major issue found. Transverse dynamic apertures: LER ok HER under study Refine modelling of IR fields LER dynamic aperture Red: injected beam

Interaction Region Crossing angle: +/- 15 mrad is working assumption. Horizontal beta function at IP and horizontal emittance chosen based on beam-beam simulations to maximize the expected luminosity.

Interaction Region Move final focus quadrupoles closer to IP for lower beta functions at IP. Preserve current machine-detector boundary. Rotate LER 8 mrad. QCS and solenoid compensation magnets overlap in SuperKEKB. Issues: QC1 normal or superconducting? Dynamic aperture => need damping ring for positrons, at least.

Magnet System Outside of the IR, will largely reuse present KEKB magnets, with some modifications and upgrades for new vacuum system, crab cavities.

Impedance and Collective Effects Resistive Wall Instability Growth rates (800-1000 s^-1) lower than damping rate of feedback system (5000 s^1). Closed Orbit Instability due to long-range resistive wake (Danilov) Thresholds (12.3/12.2 mA for LER/HER) above design currents. Electron Cloud Instability (Positron Ring) With ante-chambers and positrons in the HER, simulations show that 60G solenoid field should clear the electrons. Uncertainties: Distribution on walls and amounts of electrons. Behavior of electrons inside lattice magnets. Ion Instability (Electron Ring) Currently suppressed by feedback. With electrons in LER, simulated initial growth rate faster than feedback damping rate, leading to dipole oscillation with amplitude of order of vertical beam size => possible loss of luminosity. Coherent Synchrotron Radiation Rough numerical approximation of CSR in LER bends shows that beam pipe radius is small enough to shield beam from energy loss at 6 mm bunch length, but at 3 mm bunch length the transient energy change has an amplitude of 1.5 keV (depending on location in bunch). Investigations just started.

RF System ARES Cavity System Superconducting Cavity (SCC) System ARES Normal-conducting cavities with energy-storage cavities attached. LER & HER Superconducting Cavity (SCC) System High cavity voltage HER only ARES SCC Total number of RF units at KEKB and SuperKEKB. One unit = one klystron + 1 SCC or 1(2) ARES at SuperKEKB (KEKB)

RF Parameters

Coupled-Bunch Instabilities due to RF Cavities Longitudinal bunch-by-bunch feedback system will be needed. New HOM dampers developed for ARES and SCC

Crab Crossing Originally included as an option for KEKB, but have managed to reach design luminosity without them. Simulations indicate that they will be needed to go from 1e35 to 5e35/cm^2/s. New cavity being developed for higher beam currents Current plan is to start at KEKB with a single crab cavity in Nikko Beam will be crabbing all the way around the ring.

Vacuum System Intense synchrotron radiation 27.8 kW/m in LER, twice as high as in KEKB 21.6 kW/m in HER, 4 times as high as in KEKB =>Ante-chamber structure Also motivated by need to reduce photo-electron clouds.

Vacuum System Prototype ante-chamber tested at KEKB Combined with solenoid field is very effective at reducing photoelectron build-up.

Vacuum System HOM power losses Excessive heating Minimize loss factors Largest loss factors at movable masks which protect detector from particle background Resistive wall and bellows are next. HOM absorbers to be installed near large impedance sources T0 = revolution period (10 usec) k = loss factor I = beam current nb = number of bunches

Vacuum System HOM dampers have been developed for masks, to reduce heating of pump elements near masks. Winged damper with SiC rod based on type developed for ARES. Successfully cured pressure rise due to heating of pump elements at KEKB Absorbs 25% of 20 kW generated HOM power of mask in SuperKEKB will reach 200 kW Efficiency and capacity of HOM damper need to be improved.

Vacuum System Pumping scheme Flange and Bellows Pressure requirement: Average pressure of 5e-7 Pa to achieve a beam lifetime of 10 hours. 1e-7 around IP to minimize beam background in detector. <1e-6 locally in electron ring to keep ion trapping below level that can be handled by feedback. Adopt distributed pumping scheme, a strip-type NEG. To reduce number of high-current feedthroughs, U-shaped strip is used. Flange and Bellows Helocoflex outside with copper (MO?) RF bridge inside Bellows heating requires better RF shield

Vacuum System Comb-type RF shield developed to replace RF fingers. Tests at KEKB very promising. Development continuing.

Beam Instrumentation Beam Position Monitors Bunch-by-Bunch Feedback System Synchrotron Radiation Monitors HER and LER SR Monitors Damping Ring SR Monitor

Beam Position Monitors Use same front-end electronics. New button electrodes New connector design for improved reliability. 12 mm -> 6 mm diameter Signal power same as at present, at higher beam currents, to match dynamic range of existing front-end electronics.

Bunch-by-Bunch Feedback New BPMs for higher beam currents. Transverse feedback similar to present design Detection frequency 2.0 -> 2.5 GHz. Automated LO phase and DC offset tuning. Transverse kicker needs work to handle higher currents Improved cooling, supports for kicker plates. Longitudinal feedback to handle ARES HOM and 0/Pi mode instability Use DAfNE-type (low-Q cavity) kicker. QPSK modulation with center frequency 1145 MHz (2.25 x RF freq.) Digital FIR and memory board to be replaced by new GBoard under development at/with SLAC. Low noise, high speed (1.5 GHz), with custom filtering functions possible. Extensive beam diagnostics.

SR Monitors Current extraction chamber (copper) may need increased cooling. HOM leakage needs to be measured (500 W predicted at full current). May need absorbers Direct mirror heating from SR irradiation should be minimized. Increase bend radius of weak bends Lowers total incident power. Also increases visible light flux – desirable to help see effect of single crab cavity.

Second SR Monitor for Dynamic Beta Measurement Build a second SR source in each ring Using known phase advance between two locations, can measure the dynamic beta effect due to beam-beam collisions. Correct beam size estimation at IP More importantly, can monitor beam-beam parameters directly, in real-time. Useful for luminosity tuning. Second source: create a local bump near current source Minimize disturbance to lattice Can use existing optics huts.

Damping Ring SR Monitor Gated camera for imaging turn-by-turn bunch size damping. Up to 4 bunches in ring at one time, at two different stages of damping. Diffraction-limited resolution below 10% if optical line not too long (~10 m).

Injector Linac Intensity Upgrades Energy Upgrade Electron: increase bunch current from pre-injector Positron: stronger focusing field in capture section after target Energy Upgrade Replace S-band (2856 MHz) RF system with C-band (5712 MHz) system to double field gradient in downstream section of linac.

Energy Upgrade Pulse beam kicker installed before positron target for quick switching between beams (50 Hz).

C-Band Klystrons Prototype C-band structure installed and tested at linac using actual beam (2003). Measured field gradient of 41 MV at 43 MW agrees with expectation.

Linac BPMs Upgrade read-out oscilloscopes with newer models capable of full 50-Hz read-out.

Damping Ring Positron emittance needs to be damped, to pass reduced aperture of C-Band section and to meet IR dynamic aperture restrictions. Electron DR may be considered later to reduce injection backgrounds in physics detector, but for now only positron DR considered. Damping ring located downstream of positron target, before C-Band accelerating section.

Damping Ring Energy Compression System (ECS) in Linac-To-Ring (LTR) line, to meet DR energy acceptance requirements. Bunch Compression System (BCS) in Ring-To-Linac (RTL) line to accommodate short bunch length needed by C-Band accelerating structures.

Damping Ring Parameters RF: Use KEKB ARES cavity (509 MHz)

Damping Ring Lattice FODO cell has large dynamic aperture, but large momentum compaction factor increases required accelerating voltage. Reversing one of the bends reduces the momentum compaction factor. Adopt reverse/forward ratio of ~1/3 FODO cell w/alternating bends Dynamic aperture Green = injected beam, red = 4000 turns max deviation (thick = ideal machine, thin = machine errors included)

Construction Scenario The upgrade of KEKB to SuperKEKB is proposed for around 2007. R&D and production of various components will be done in the first four years in parallel with the physics experiment at KEKB. The installation will be done during a one year shutdown in 2007, and then the commissioning of SuperKEKB will begin.

Summary LoI is in draft stage. SuperKEKB at L=~5e35/cm^2/s can be built.

Machine Parameters Luminosity: Beam-beam parameters: Energy transparency:

Beam-beam blowup Evolution of luminosity and beam size in weak-strong (PIC) and exact solution (Gaussian) models