NLC - The Next Linear Collider Project Andy Ringwall 3/28/00 Permanent Magnets for the NLC A. Ringwall, C. Spencer, C. Rago(SLAC) V. Kashikhin, V. Tsvetkov,

Slides:



Advertisements
Similar presentations
5/18/2015J-PARC1 High Level Physics Applications Magnets & Beams Day ?, Lecture ? Accelerator View from the Physicist.
Advertisements

Magnets for the ESRF upgrade phase II
Linac Quad Field and Position Stability Chris Adolphsen SLAC.
NLC - The Next Linear Collider Project Andy Ringwall 1/9/00 ME 217 NLC Magnet Project Andy Ringwall, SLAC, Liaison Jeff Rifkin, SLAC, Liaison Shun Takai,
Design of Standing-Wave Accelerator Structure
Magnet designs for the ESRF-SR2
NLC - The Next Linear Collider Project Andy Ringwall 11/11/99 NLC Magnets Permanent Magnet Options Bill Fowler, FNAL Andy Ringwall, SLAC.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Alignment and Beam Stability
Chapter 17 DC Motors. Objectives After studying this chapter, you will be able to: Explain the principles upon which DC motors operate Describe the construction.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 11, 2002 LBNL Jose Alonso, Jin-Young Jung.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Key luminosity issues of the positron source Wei Gai.
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 10, 2002.
NLC - The Next Linear Collider Project Oct 01 MAC James T Volk October 2001 MAC meeting Magnet Systems for the NLC James T Volk October 26, 2001.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Magnets Technologies for NOνA Transfer Line (& RR30 section) July 21-23, 2009.
Principals of fast injection and extraction R. Apsimon.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
1 Figure 17.1 A Rotating Electric Machine. 2 Configurations of the three types of electric machines Table 17.1.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
Two-beam module layout
From Beam Dynamics K. Kubo
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC DR Lower Horizontal Emittance, preliminary study
Some Design Considerations and R &D of CEPCB Dipole Magnet
Page Headline CBETA Splitter.
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
ILC Z-pole Calibration Runs Main Linac performance
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
SC Quadrupole Magnets in ILC Cryomodules
Chris Adolphsen Sergei Nagaitsev
AC and DC motors.
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Large Booster and Collider Ring
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
CLIC Workshop 2016, CERN 20th January 2016
Pierre-Alexandre Thonet
10th Feb 2017, CLIC Implementation Meeting
Compact and Low Consumption Magnet Design The DESY Experience
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Beam-Based Alignment Results
FNAL Superconducting Quadrupole Test
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

NLC - The Next Linear Collider Project Andy Ringwall 3/28/00 Permanent Magnets for the NLC A. Ringwall, C. Spencer, C. Rago(SLAC) V. Kashikhin, V. Tsvetkov, J. Volk, B. Fowler, A. Makarov(FNAL) S. Marks, R. Schlueter, K. Robinson(LBL) A. Johnson, D. Milestone, B. Lynch(Stanford, DFM)

ADR 3/21/00 2 NLC - The Next Linear Collider Project NLC Background Next Linear Collider(NLC): electron-positron collider presently in the conceptual design phase. Collaborators: SLAC, FNAL, KEK, LBL, LLNL Energy: 500 GeV - 1 TeV CM, upgradeable to 1.5 TeV Target luminosity: >5 x (500 GeV); >10 34 (1 TeV) Four primary beamline areas: –Injector(Inj) –Damping Rings(DR) –Main Linac(ML) –Beam Delivery(BD) Test facilities: –NLC Test Accelerator(NLCTA) –Accelerator Test Facility(ATF) –Final Focus Test Beam(FFTB) –Accelerator Structure SET-up(ASSET) Completed first DOE review(CD-1) in 5/99; several more reviews planned CD-0.4, CD-0.8, CDR. FNAL collaboration began in Fall of ‘ km

ADR 3/21/00 3 NLC - The Next Linear Collider Project NLC Magnet Summary Magnet Type Styles Quantity Quadrupole Dipole Corrector 3492 Trims13777 Sextupole6402 Solenoid4~10 Pulsed Magnets623 Others748 Total976967

ADR 3/21/00 4 NLC - The Next Linear Collider Project Magnet Requirements Overview Beam based alignment for quadrupoles: –Beam centered on quad to < 1  m. –All quadrupoles have dedicated beam position monitors(BPM’s). Vibration: –Nanometer level jitter(f > 10 Hz) tolerances. –FFTB quad ‘water on’ vibration excessive. Strength stability(  B/B n ): –Jitter tolerance: < to < 5 x –Short term(minutes) tolerances: < Multipoles(still defining): –Looser in Inj., ML and BD(single pass). –Tighter in DR’s. NLC availability goal of 85 % for a 9 month run. Radiation dose rate(still defining): –High in DR’s (50 W/m, avg.) –Lower in ML(1.4 W/m, avg.) Movers: –All quads and sextupoles on movers. –Achieve < 200 nm step size

ADR 3/21/00 5 NLC - The Next Linear Collider Project Beam Based Alignment Beam centered on quadrupole to < 1  m. Use BPM feedback and mover steering to center quad on the beam. But where is the BPM with respect to the quad(mechanical offset and BPM readout error)? First step is to find the offset of each individual BPM to its quad: –Vary an individual quad’s strength by 20 % in several steps. –Measure the beam kick due to quad/beam offset using downstream BPM’s. –Reconstruct the orbit and determine offset of that quad to its BPM; proceed to next quad magnet. –Repeat procedure weekly, monthly as needed. Implement automated steering procedure using movers. During 20% quad strength variation, quad center must not move by more than 1  m; the lower the better. Magnet design must minimize change in relative pole strengths during this strength variation.

ADR 3/21/00 6 NLC - The Next Linear Collider Project Baseline Electromagnet Design CD-1 Review(Dipoles, Quad, Sextupoles) Assume resistive electromagnets(EM) –Solid core preferred –Round conductors(improve reliability) Power supplies –Individual supplies for each magnet. –Limited stringing (BD bends). –Cables sized over NEC minimums to reduce power dissipation in the tunnel. –Redundant supplies in ‘n out of k’ configuration. Movers(FFTB design) –Cam-style mover design for X,Y, and roll. –Sub-micron step size. Post CD-1 Review Maximize stringing of quads –Use inexpensive shunt supplies for BBA variation and steering trim(5%). –Redundancy on strung supplies. –Cut cost of supplies and cableplant. Main Linac Quad Aperture:.5 in Length:12.5 in B pole tip :8 kG Power:1 kW Damping Ring C-Quad Aperture:4 cm Length:25 cm B pole tip :8 kG Power:4 kW

ADR 3/21/00 7 NLC - The Next Linear Collider Project Baseline Magnet Costs Magnet systems were 9 %(450 M) of the NLC CD-1 cost. Typical ML quad CD-1 cost estimate: –Magnet:$ 8,700 –Power Supply:$ 24,500 –Cables:$ 16,000 –Power bill/yr:$ 315 Facilities infrastructure –Power supply buildings and alcoves –Water cooling Value graph –Power supplies and cables has high worth but a higher relative cost. –Prefer that cost be in line with worth. What about permanent magnets? Cost Worth, EM Quad

ADR 3/21/00 8 NLC - The Next Linear Collider Project Permanent Magnet Option Permanent magnet(PM) idea originated during a reliability exercise for the main linac magnets and was shelved at that time due to BBA and energy flexibility concerns (90 % strength variation required for ML magnets). PM idea resurrected fall of ‘99: –N. Phinney reassessment of BBA requirements, ML strength variation reduced to 20 %. –J. Cornuelle’s visit to Fermi lab, discussions about recycler ring PM’s. Preliminary meeting at FNAL in November of ‘99(SLAC, FNAL) –Design options discussed; J. Volk’s initial PANDIRA runs. –BBA requirement is difficult; need to develop a proof of principle prototype. Second meeting at SLAC January of ‘00(SLAC, FNAL, LBL) –Build one or more ML quad prototypes. –Clearly define magnet requirements across machine and develop rough designs. Rough costing exercise completed; all NLC magnets assumed to be PM –Ballpark savings of $282 M over CD-1 estimates. –Save $187 M over post CD-1 cost reductions.

ADR 3/21/00 9 NLC - The Next Linear Collider Project Permanent Magnet Pro’s and Con’s PM Pro’s Eliminate power supplies: –Supplies and temperature controlled racks. –No alcoves or support buildings. Substantial reduction in cableplant: –Eliminate power cables and trays. –No cable heat dissipation. Eliminate EM power and cooling: –No flow induced vibration. –Reduced cooling capacity: LCW load, pumps, headers HVAC(air cooled magnets, cables) –Operate at lower LCW pressure. –Lower operating costs. Improved availability: –Power supply trips –Water leaks Enhanced machine protection: –No coil shorts, mis-steered beam PM Con’s Difficulty in meeting BBA requirements. PM long term stability: –Radiation resistance –Temperature coefficients –Long term demagnetization effects Limits on energy flexibility. Cost of PM material.

ADR 3/21/00 10 NLC - The Next Linear Collider Project NLC PM Candidates Original list of NLC PM candidates(from N. Phinney’s): –If injector is centralized, then transport line quads could be PM. –Bunch compressor bends and quads. –Damping ring bends and sextupoles. –Main linac quads up to 150 GeV(use EM’s from 150 to 250 GeV for energy flexibility). –Main linac quads past 250 GeV(drift lattice for an initial 500 GeV CM machine). –Only soft bends, final doublet, and extraction lines in beam delivery area. –Trims, correctors, pulsed magnets, solenoids, septums, spin rotators are not candidates for PM technology. Presently assuming 50%(about 3321) of NLC magnets would be viable for PM’s. Prototype results will help define limits of applying PM technology to NLC.

ADR 3/21/00 11 NLC - The Next Linear Collider Project PM Material, Basics Net dipole moment, m (A-m 2 ), from aligned domains. Dipole moment per unit volume defines magnetization, M(A/m), along the magnetization or ‘easy’ axis. M related to surface currents, Js(A/m). MMF(A) is product of surface currents and easy dimension. B-H curve: –Remanent induction, Br –Intrinsic induction curve, J –Coercivity, Hc –Intrinsic coercivity, Hci –Flux density at op. point, Bd –Field at op. point, Hd –Permeance coefficient, Pc = -Bd/Hd –Recoil permeability, ur –Field at 90% Br, Hk m M Jms Jms = M X n B-H Curve B = u o (H + M(H)) [inside brick] MMF = Jms d easy d easy Initial curve Intrinsic Curve, J B Curve, B Br Bd HdHkHcHci + B (T, kG) -B -H +H (kA/m, kOe) Pc   PM Brick

ADR 3/21/00 12 NLC - The Next Linear Collider Project PM Material Choices CERAMIC Strontium or barium ferrite Inexpensive Radiation resistant Low Br,.38 T High temp coefficient, -.2 % / C  ( Br increases, Hc decreases w/ incrrease in temp ) Brittle RARE EARTH COBALT (REC) Sm-Co 1:5, 2:17 Expensive Small industrial base Radiation resistant(2:17 good, 1:5 is worse) High Br, 1.05 T Low temp coefficient, -.03% / C  ( Br and Hc decrease w/ increase in temp ) Brittle Nd-Fe-B Ceramic < $ < REC Large industrial base Poor radiation resistance Highest Br, 1.2 T High temp coefficient,.1% / C  ( Br and Hc decrease w/ increase in temp ) Plated to prevent corrosion

ADR 3/21/00 13 NLC - The Next Linear Collider Project PM Material Processing and Properties Rare Earth PM Processing Receive cast material Crush, hydrogen decrepitate(brittles Nd-Fe-B) Jet mill to a fine powder, separate to desired particle size(single domain or other) Chromatographic inspection, micro-alloy Die press; at around 50 % compaction, apply domain orienting field(develops anisotropy) Sinter, quench, and age(defines Hci) Saw and grind bricks to shape Pulse magnetize Thermally stabilize(age) in the open circuit condition Helmholtz inspect Plate(Nd-Fe-B), package, and ship Properties Property variations: –Can only hold B-H curve properties(Br, Hc, ur, Hk) to a few %. –Variations in composition and heat treatment vary microstructure even within same batch. Magnetization angle tolerance: –Easy axis defined during die or hydrosatic pressing. –Can only define axis to a ground datum to within a few degrees. Recoil permeability –Non unity, –Orthotropic, u  /u //  1.1 Brick size can be limited due to cracking during quench(Sm-Co 2:17). Thermally stabilizing magnet in final permeance configuration can help limit long term demagnetization.

ADR 3/21/00 14 NLC - The Next Linear Collider Project Hybrid PM Design Variants PM Options Fixed Strength PM only Variable Strength Fe Pole Variable Strength Fixed Strength Hybrid + rotating PM elements Hybrid + integral trim coil Hybrid Hybrid + stand-alone trim coil Hybrid w/ counter-rotating sections Hybrid + rotating outer PM ring PM segments(Halbach magnet) PM w/ counter-rotating sections Hybrid + moving shunts

ADR 3/21/00 15 NLC - The Next Linear Collider Project Prototype Main Linac Quad Prototype requirements: –Aperture:.5 in –Nominal length:12.75 in –Pole tip field:8 kG max –Range:-20 % –Center shift:< 1  m –Absolutie field accuracy:<.5 % –Multipoles:b 3 /b 2 < 2 % –Good field aperture:10 mm –Op. temp. variation:+/- 1  C Electromagnet version in fabrication: –Solid core: C1008 plate –Round Cu conductor: .25” X.063” W –Power:1 kW –Voltage:6 V –Current:167 A –Total flow:1 gpm

ADR 3/21/00 16 NLC - The Next Linear Collider Project PM Prototype: Corner Tuner Design Preliminary design: –Sm-Co 2:17 bricks outboard of poles. –Rotating Sm-Co 2:17 tuners in corners. –Pole supports between poles. –Temperature compensator(if needed); applies to all hybrid PM designs. Advantages: –Similar to recycler ring quads. –Large space available for pole supports. Disadvantages/issues: –PM material is not used most efficiently. –High demag field in some areas. –Non-symmetric demag fields across element, could affect center shift tolerance. PM Quad Prototype: FCS217

ADR 3/21/00 17 NLC - The Next Linear Collider Project PM Prototype: Wedge Design Preliminary design: –Sm-Co 2:17 bricks outboard and between poles. –Rotating tuners(Nd-Fe-B) outboard of poles. –Tuning washers outboard of lateral bricks(optional). –Flux return rotated 90°. Advantages: –PM material is used efficiently. –Symmetric demag. field across elements. Disadvantages/issues: –More complicated assembly. –Diamond flux return does not integrate well with cam-style mover. PM Quad Prototype: FWS217 PM bricks, 12X Poles, 4X PM tuner elements, 4X Flux return

ADR 3/21/00 18 NLC - The Next Linear Collider Project PM Prototype: Shunt Design Preliminary design: –Bricks located between the poles. –Steel shunts outboard of bricks. –Shunts translate on the horizontal and vertical axes. Advantages: –Shunt material properties have less variation than a PM element. –Shunt tuner less expensive than PM. Disadvantages/issues: –Modulating the permeance of each circuit might change relative strength of poles leading to a center shift. –Large forces in shunts. –Unison translation scheme required. PM Quad Prototype: FRS217 PM bricks, 4X Poles, 4X Shunts, 4X Flux return

ADR 3/21/00 19 NLC - The Next Linear Collider Project Rotating Tuner Forces and Torques

ADR 3/21/00 20 NLC - The Next Linear Collider Project Prototype: Rotating Tuner Concept Cylindrical PM elements magnetized  to their cylindrical axis. Align and epoxy in housing. Measure strength and orientation then balance: –Add or rotate additional PM element material. –Counter rotate two end elements; set strength and orientation. –Use rotating element(s) to correct center shift. Supported tuner by bearings in endwall, max radial load  200 lb –Limit deflections –Limit bearing play Attach gears to one end; element access at opposite end Rotating tuner: Single adjustable element Rotating tuner: Counter-rotating elements

ADR 3/21/00 21 NLC - The Next Linear Collider Project Prototype: Rotating Tuner Actuation Allow tuner elements to self align with field; lock tuner housing with set screw. Connect elements using sprockets, chain or timing belt; remove backlash. Rotate using single worm gear and stepper motor: –Torque  200 in-lb(four elements). –Gears always loaded by magnetic torque; no backlash. – Non back-driveable; no brake required. –Second worm drive for perturbation studies. Transduction: encoder for stepper motor; potentiometer or RVDT on elements; limit switches and hardstops. Endwall Sprocket, lg Sprocket, sm, 3X Worm gear, aux Worm, aux Worm Base plate Worm gear Element assy, 4X A A Section A-A

ADR 3/21/00 22 NLC - The Next Linear Collider Project Prototype Measurements Measuring center shift: –Use rotating coil with two offset windings in the same plane; buck quad and measure change in dipole. –Using an FFTB EM quad, T. Slaton was able to resolve center shift to 2  m using a rotating coil. –Difficulty with set-up: thermal variations, vibration, cable loads, etc. New measurement set-up for SPEAR 3: –Granite table, lower working height off table. –Use integrator, slower rotation speeds and low vibration. –Add thermal enclosure, temp control as needed. –EM prototype will precede PM prototype; piggyback off of this work. Taut wire systems available –Taut wire on precision translation stages(SPEAR 3) –Pulsed taut wire system also available. Brick and tuning element measurements –Helmholtz coil measurements of brick and tuner moments; sort to help balance poles and tuners. –Magnetic knockdown to uniform strength(optional). Small Bucking Coil Taut Wire Setup

ADR 3/21/00 23 NLC - The Next Linear Collider Project Summary and Future Work Summary –Permanent magnet technology for the NLC holds promise for cost reduction, facilities simplification, improved reliability, and meeting magnet vibration tolerances. –Initial assessment and design development is underway(FNAL, SLAC, LBL) –The center shift tolerance required for BBA will be the most difficult requirement to meet. High radiation areas may not be suitable for PM. Future work –Prototype development: Choose magnetic designs for prototyping early April ‘00. Continue magnetic analysis and perturbation studies. Final design review in mid-May ‘00. Prototype built and tested by mid-September ‘00. –Other NLC PM candidates: Complete first pass at requirements by early April. Develop parametric sizing and costing models for bends, quads, and sextupoles. Refine PM machine configuration and costs.