Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Development of beam-based intra-train feedback systems Glenn B. Christian Post-doctoral Research Assistant on Feedback on Nanosecond Timescales (FONT)
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
NLC - The Next Linear Collider Project Intra-Pulse Feedback at the NLC Interaction Point Steve Smith SLAC Snowmass 2001.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Phase Feed-Forward Piotr Skowroński (CERN)
Dither Luminosity feedback versus Fast IP feedback
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Presentation transcript:

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows Queen Mary, University of London People FONT1 (2002) FONT2 (2003/4) Future FONT plans

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Queen Mary: Philip Burrows (faculty), Glen White (RA), Tony Hartin (prog.) Stephen Molloy, Shah Hussain (grad. students) Daresbury Laboratory: Alexander Kalinine, Roy Barlow (elec. eng.), Mike Dufau (des.) Susan Smith, Rob Smith, Mike Dykes, Mike Poole Oxford: Colin Perry (elec. eng.) + technicians Gerald Myatt (retd. faculty) Simon Jolly, Gavin Nesom (grad students emeritii) SLAC: Joe Frisch, Tom Markiewicz, Marc Ross Chris Adolphsen, Keith Jobe, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley + technical support FONT Group

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Beam-based Feedback (FONT) Intra-train beam feedback is last line of defence against ground motion Key components: Beam position monitor (BPM) Signal processor Fast driver amplifier E.M. kicker Fast FB circuit

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT Luminosity Recovery (NLC ‘H’) For small offsets (< 5 sigma), and appropriate gain: system can recover > 80% of design luminosity Much easier (and required) at TESLA: 2820 bunches X 337 ns

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT at NLCTA 2 available sections of NLCTA beampipe: 170ns long train, bunched at X-band (87ps) significant charge variation (50%) along train large beam (1mm), train-train jitter O(100 microns)

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 NLCTA charge variation along train 170ns long train Need to deconvolve this from BPM signal (NLC design charge variation << 1%)

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: beamline

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: magnets SLC dipole and post-damping ring kicker

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: BPM New button type BPM for X-band bunch structure Initial readout w. diode detectors

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: BPM processor Read each y pickoff signal: Formed sum and difference, mixed down from X-band to baseband. Charge normalisation: 1/sum performed w. AWG (slow) with real-time first-order correction

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: charge normalisation/feedback

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: kicker driver amplifier 3kW amplifier: 3 planar triode tubes; 7.5 A, 350V o/p Allows us to move 65 MeV beam by +- 1 mm

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: expected latency Time of flight kicker – BPM: 14ns Signal return time BPM – kicker: 18ns Irreducible latency: 32ns BPM cables + processor: 5ns Preamplifier: 5ns Charge normalisation/FB circuit: 11ns Amplifier: 10ns Kicker fill time: 2ns Electronics latency: 33ns Total latency expected: 65ns

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT1 at NLCTA: results 10/1 position correction of 65 MeV e- beam achieved latency of 67 ns system tested in feed forward and feedback modes

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 at NLCTA: outline Goals of improved FONT2 setup: Additional 2 BPMs: independent position monitoring Second kicker added: allows solid state amplifiers Shorter distance between kickers and FB BPM: irreducible latency now c. 16 ns Improved BPM processor: real-time charge normalisation using log amps (slow) Expect total latency c. 53 ns: allows 170/53 = 3.2 passes through system Added ‘beam flattener’ to remove static beam profile Automated DAQ including digitisers and dipole control

Philip Burrows ASTeC, Daresbury Lab 22/12/03 FONT2 at NLCTA: expected latency Time of flight kicker – BPM: 6ns Signal return time BPM – kicker: 10ns Irreducible latency: 16ns BPM processor: 18ns FB circuit: 4ns Amplifier: 12ns Kicker fill time: 3ns Electronics latency: 37ns Total latency expected: 53ns

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 at NLCTA: new beamline configuration Dipole and kickers New BPMs

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2: new front-end IF processor

Philip Burrows ASTeC, Daresbury Lab 22/12/03 FONT2: new front-end IF processor 2y on beamline: 6y+6x outside tunnel: 14 channels: 2y on beamline, 6y + 6x outside

Philip Burrows ASTeC, Daresbury Lab 22/12/03 FONT2: synchronous demodulator PCBs 6 boards outside tunnel: (y1-y2)/(y1+y2) w. log amps

Philip Burrows ASTeC, Daresbury Lab 22/12/03 FONT2: new solid state amplifiers Total drive same as last year Amplifier pair w. shielding: FB o/p signal into amp (0.9c):

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2: new DAQ/control system SBPMS? DAQ AWG DS EPICS GPIB BOX FONT DIPOLE FB BPM BPM 2BPM3 TOR1750 SCOPE SIS 1SIS 2 TRIG GATE SIG GEN AMP FB BPM ELECTRONICS

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 run Nov/Dec 2003 Nov 7-9: commissioned system of 3 BPMs and new electronics resolution measured using ‘triplets’: c. 15 microns Opportunistic runs Nov 24 – Dec 13 (10 shifts) operating conditions difficult due to 8-pack + high-gradient structure tests Dec 3: commissioned new amplifiers, kicker, FB circuit + DAQ full system run in feed-forward and feedback modes Dec 9: commissioned beam flattener in standalone mode Dec 13: ran full system with beam flattener

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2: first results Nov 2003 Beam registered in all 3 BPMs w. dipole scans Resolution measured: c. 15 microns BPM1 BPM2 BPM3 charge Time (ns)

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 initial results: beam flattener Performance bandwidth limited: 80 MHz (AWG) 30 MHz (amp) Flattener corrects to average beam position: removes ‘static’ structure Feedback off for illustration:

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 initial results: beam flattener

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 initial results: feedback mode More data to analyse: stay tuned… System works in FF + FB modes New witness BPMs commissioned

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 FONT2 crew

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Ideas for further development work e+e- background studies in SLAC A-line World’s smallest emittance e- beam is at KEK/ATF Scaling: 1 micron at ATF (1 GeV) ~ 1 nm at LC (1000 GeV) Beam-based feedback at ATF could be scale model for LC

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Comparison of ATF with NLCTA NLCTAATF Train length170 ns300 ns Bunch spacing0.08 ns2.8 ns Beam size (y)500 mu5 mu Jitter (y)100 mu1 mu Beam energy65 MeV1.3 GeV ATF has ‘right’ bunch spacing and train length, and the beam is smaller and more stable than at NLCTA -> much better place for fast feedback prototypes

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Possible future developments for FONT at ATF 3 suggestions: 1. Stabilisation of extracted bunchtrain at 1 micron level: low-power (< 100W), high stability amplifier stripline BPM w. ~ 1 micron resolution these are exactly what are needed for the LC! 2.Stabilisation of extracted bunchtrain at 100 nm level: requires special BPM and signal processing useful for nanoBPM project 3. Test of intra-train beam-beam scanning system: high-stability ramped kicker drive amplifier very useful for LC

Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Development of Improved Feedbacks Beam angle-jitter: correction best done near IP with RF crab cavity (needed anyway): system needs design + prototyping Ideally, feedback on luminosity: bunch-by-bunch luminosity measurement would allow intra-train luminosity feedback