Operations Management Just-in-Time Systems Supplement 12

Slides:



Advertisements
Similar presentations
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Advertisements

Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
JIT, TPS, and Lean Operations
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Just-in-time.
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
Just-in-Time and Lean Operations
© 2006 Prentice Hall, Inc.16 – 1 Operations Management Just-in-Time and Lean Production Systems Just-in-Time and Lean Production Systems © 2006 Prentice.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S Inventory Management - 60 Min 2. JIT - 30 Min 3. Case Discussion - 30 Min 4. “Final” Problems - 60 Min Agenda:
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
Just-In-Time & Lean Systems
JIT and Lean Operations
Just-in-Time and Lean Systems
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
EMBA-2, BUP EO Just-in-Time / Lean Production.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
Lean Production Just in time - It originally referred to the production of goods to meet customer demand exactly, in time quality and quantity, whether.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
Inputs and Outputs to Aggregate Production Planning
Operations Management
Chapter 12 Just-in-Time and Lean Systems
Just-In-Time and Lean Production
Just-In-Time and Lean Production
Inputs and Outputs to APP
Presentation transcript:

Operations Management Just-in-Time Systems Supplement 12

Outline Just-In-Time Philosophy. Role of inventory. Suppliers. Layout. Scheduling. Quality. Lean Production. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

What is Just-in-Time? Management philosophy of continuous and forced problem solving. Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. Originated in Japan; developed over 40 years. Popularized by Toyota; now used globally. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

Why is Production Difficult? Demand is uncertain and variable. Same equipment and people are used to make a variety of products. Switching products takes time. Things go wrong: Materials are defective. Deliveries are variable (late). Equipment fails, people make mistakes, etc. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

One Solution: Inventory Use inventory to: Match supply with varying demand. Allow production of a variety of products on the same equipment. Overcome defective materials, late deliveries, equipment failures, mistakes, etc. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

“Traditional” Production Forecast demand. Produce in large lots (to reduce expensive setups). PUSH product to customer. Large lot sizes mean: Large work-in-process inventories. Large final product inventories. Slow response to changes and defects. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

Another Solution: Just-In-Time Use just-in-time to identify and solve problems that create inventory. Reduce setup costs to switch products. Eliminate defective materials, late deliveries, equipment failures, mistakes, etc. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

“Just-in-Time” Production Produce in small lots to replenish stock actually sold. Sales PULL product (and parts) through plant. Small lot sizes mean: Small work-in-process inventories. Small final product inventories. Quick response to changes and defects. It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.

Push versus Pull Push system: material is pushed (according to forecasts) downstream (along assembly line, to warehouses, etc.). Pull system: material is pulled (by sales to customers) downstream (along assembly line, to warehouses, etc.) just as it is needed.

What Does Just-in-Time Do? Reduces waste and improves quality. Waste = Anything not adding value to the product. Exposes problems caused by variability. Variability in demand, deliveries, materials, equipment, specifications, etc. Achieves streamlined production by reducing inventory. Reduces delays and increases throughput. Reduces cost and/or increases profit! Provides faster response to the customer.

Waste Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda President, Toyota

Types of Waste Overproduction. Waiting. Transportation. Inefficient processing. Inventory. Unnecessary motion. Product defects. You should ask students to consider why such waste occurs.

Just-in-Time Success Factors Suppliers Employee Empowerment Layout JIT Quality Inventory This side outlines the essential features, more detail is provided in subsequent slides. Preventive Maintenance Scheduling

Inventory JIT objective: Eliminate inventory. JIT requires: Small lot sizes. Low setup time. Just-in-time deliveries. Deliveries direct to point of use (not stockroom). JIT inventory: Minimum inventory to keep system running. Students should be asked to draw their own connection between inventory and problems. Given that inventory exists in case of problems, if we wish to eliminate inventory, we also must eliminate problems. Again the notion that JIT is not simply an inventory methodology.

Lowering Inventory Reduces Waste Scrap Work in process inventory level (hides problems) Unreliable Vendors Capacity Imbalances The analogy presented in this and the next four slides may help to illustrate the action of inventory in hiding problems.

Lowering Inventory Reduces Waste Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP

Large Lot Sizes = Large Inventory Time Inventory Level Lot Size 200 Average inventory = 100 Average inventory = (Lot size)/2 The next several slides look at the process and consequences of reducing inventory.

To Lower Inventory, Reduce Lot Size Inventory Level Average inventory = (Lot size)/2 Lot Size 80 Average inventory = 40 Lot Size 200 The next several slides look at the process and consequences of reducing inventory. Time

EPQ Minimizes Total Costs Holding Cost Setup Cost Optimal Lot Size Lot Size

Reducing Setup Costs Reduces Lot Size and Total Cost! Holding Cost Original optimal lot size New optimal lot size Lot Size

Steps to Reduce Setup Time Separate setup into preparation (while machine is running) and actual setup (while machine is stopped). Do as much as possible while the machine is running. Move material closer and improve material handling. Standardize and improve tooling. Students should be asked to draw their own connection between inventory and problems. Given that inventory exists in case of problems, if we wish to eliminate inventory, we also must eliminate problems. Again the notion that JIT is not simply an inventory methodology.

Suppliers JIT objective: Frequent on-time deliveries of small lots of high quality. Buyer and supplier form JIT partnerships to eliminate: Unnecessary activities. In-plant inventory. In-transit inventory. Poor suppliers. You might point out here that both buyer and supplier gain from this relationship.

Characteristics of JIT Partnerships Few nearby suppliers. Frequent deliveries in small-lot quantities. Deliver small lots several times each day. Suppliers encouraged to extend JIT to their suppliers. Steady output rate & long term contracts. Minimal paperwork. Ask students to consider what these benefits mean to the production departments of buyers.

Layout JIT objective: Reduce movement of people and material. JIT requires: Delivery directly to work areas – not to stockroom. Short distances to ensure on-time deliveries. Little space for inventory. Flexibility: Moveable or changeable machines. Often use work cells. If students have not yet gained the impression that JIT is not about inventory - but rather about the philosophy and design of the entire productive system - the issue should be raised at this point.

Scheduling JIT objective: Simple system to pull product through plant in small lots. JIT requires: Communicating schedules to suppliers. “Level” schedules: production each day equals demand. Freezing part of schedule nearest due date. Small lots. Kanban techniques. Students should be asked what problems they would expect to encounter when trying to introduce schedules appropriate to JIT.

Kanban Japanese word for card. May be a card, flag, verbal signal etc. Pronounced ‘kahn-bahn’ . Authorizes production from downstream operations. ‘Pulls’ material through plant. May be a card, flag, verbal signal etc. Used often with fixed-size containers. Add/remove containers to change production rate.

Figure S12.5

Preventive Maintenance (PM) JIT objective: Prevent failure. JIT requires: Scheduled & daily preventive maintenance. Operator performs preventive maintenance. Operator knows machine and is responsible for product quality. Cleanliness and simplicity are keys. That the operator is the one to perform the PM is another example of the need to empower employees if JIT is to be a success. Only when systems are reliable will JIT work. Preventive maintenance is a prerequisite to reliability. Variability must be removed for JIT to work.

Quality JIT exposes quality problems by reducing inventory. JIT limits number of defects produced with small lots. JIT requires TQM. Statistical process control. Worker involvement & empowerment. Immediate feedback.

Lean Production Use JIT to eliminate virtually all inventory. Build systems to help employees produce a perfect part every time. Reduce space requirements. Develop close relationships with suppliers. Educate suppliers and workers. Eliminate all but value-added activities. Enrich jobs.

Just-In-Time and Japan Area of Japan = 144,000 square miles. California = 158,000 square miles Missouri = 70,000 square miles Population of Japan is about 1/2 of USA. Japan is islands (80% mountainous). Land is expensive. Facilities are not far apart. Natural resources are limited. Minimizing waste is crucial.