ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.

Slides:



Advertisements
Similar presentations
What about type tested assemblies?
Advertisements

Introduction to Linux Video task 1. Five reasons to use Linux Data security Price Reliability It is modified for the needs of a user It is easy to use.
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
Understanding Electrical TransmissionDemonstration C2 A Guide to the National Grid Transmission Model Demonstration C2 Why are high voltages used for transmission?
Understanding Electrical TransmissionDemonstration C1 A Guide to the National Grid Transmission Model Demonstration C1 Transformers and power.
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Week 4 Deliverables Team Highlander. Patent 1-Motorized Walker Pat No Date 12/08/1992 A motorized walker includes a base upon which a person.
AVANTE HYBRID Battery Dismantling Manual. Precautions for handling the hybrid battery Battery dismantling procedure Turning off the engine Disconnecting.
Jocelyn Connolly Seth Gregor Chris Gigliotti Soyeon Jeon October 7 th, 2011.
James Kast Andrew Kuharske Timothy Lenberg Daniel Taylor 1.
JUICE Senior Design Team The University of Idaho Fall 2010 Kyle Gray Kyle Griner Cameron Gordon Aldo Lopez Prof Dean Edwards.
ME 495 EV Presented by team BJCANE: Brett Joseph, John Jolly, Colin Bates, Alex Fabbiano, Nick Smith and Eric Yost ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
Adjustable Art Table Team 9 Bruce Bassi Kristen Haldeman Richard Sierra Client Coordinator: Dr. Brooke Hallowell Supervising Professor: Dr. John D. Enderle.
ME 495 EV Team 1: Alex and Eric ME 495 EV: Electric Pontiac Fiero Project.
University of Washington Presented by Eric Yost University of Washington Electric Pontiac Fiero Project.
ME 495 EV Presented by BJCANE ME 495 EV: Electric Pontiac Fiero Project.
Team Bi-directional -Keith Beland -Christian Brinegar -Justin Marsha.
ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
Multi-function apparatus for secondary distribution
The Great Team1 Week 6 : Midterm Presentation Bunk Bed Converter Adam Brown Blaine Gardner Sarah Gleaton Jimmy Jiang Addisu Lemlem Lee Tschaepe 6/21/2006.
myDAQ Biomedical Instrumentation Board
Recruitment Info Session January 26 th, Agenda 2 The Team Our Goal Technical Organization Timeline Recruiting and Expectations.
Brian Rosen Abandoned Call and Premature Disconnect.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Common Electrical Devices John Jones. Single Pole Switch Used to control a light from one location.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Mid – Semester Presentation Senior Design February 18, 2010.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Mid – Semester Presentation Senior Design February 25, 2010.
V-CLEAT ATTACHMENT/PROSTHETIC FOR ADAPTIVE SAILING DPM Final Presentation Fall Quarter 2012.
ME 4182 Problem Statement, Design Partition, Project Plan, Task Assignments Team: GT Rack 2:00 pm September 7, 2005 Ryan Glenn Andrew Mrasek Japheth Nelson.
John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
Group Members: Dan Brownlee Sean Harriman Andrew Robison James Evans Joshua Doores.
Bicycle Safety System We got your back David Korobov – B.S. Computer Engineering – Dec Zeyuan Yu – B.S. Electrical Engineering – Dec
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Engineering World Health: Aspirator
BRAKING SYSTEM COMPONENTS AND PERFORMANCE STANDARDS
MAX Program Transportation Questions
RS 232- interface 2fold, MDRC EA/S 232.5
PRG 410 Competitive Success/snaptutorial.com
HRM 600 Enthusiastic Studysnaptutorial.com
PM 598 RANK Education Your Life / pm598rank.com
PM 598Competitive Success/tutorialrank.com
PRG 410 Education Begins / Snaptutorial.com. PRG 410 All Assignments For more classes visit PRG 410 Week 1 Individual Math Tutor.
PM 598 RANK Lessons in Excellence-- pm598rank.com.
PM 598 Education for Service-- snaptutorial.com
PM 598 Teaching Effectively-- snaptutorial.com
PM 598 RANK Education for Service-- pm598rank.com.
Recliner-Boy Benefits Problem Solution How the lift mechanism works:
ME 495 EV: Electric Pontiac Fiero Project
Presented by Team 2: Colin Bates, and Nick Smith
ME 495 EV: Electric Pontiac Fiero Project
Megan Anders, ryan bradley, austin roden, and laura van winkle
Presented by Team 2: Colin Bates, and Nick Smith
DUALL Deliberative approach to the living lab Dr Richard Bull and team
Work Breakdown Structure Tasks and Sub-Tasks
Phase 4 PROTOTYPE Review the previous weeks assignment for 20 – 30 mins before beginning the presentation. This week is to make the students learn about.
ME 495 EV: Electric Pontiac Fiero Project
LightBend™ 1xN Fiber Optic Switch
Hybrid Electric Vehicles
Presentation transcript:

ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project

1.Motor Kill Switch 2.Motor Shielding / Waterproofing Team Assignments:

Design a mechanical system that allows the user to terminate the connection between the power source and motor Problem Statement 1:

Project Requirements: Safe Easy to use / access No accidental activation Mechanical Operated from driver’s seat and from trunk Inexpensive Available parts Driver interface location must be moveable Reliable

Physical Decomposition:

Interface location Interface design Front to rear connection Physical Disconnect Parameters

Order motor Acquire transmission Establish sub task deadlines Obtain product specs Begin systems modeling Revisit project goals and timeline This Week: