Friday, 25.3. 06h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 30th September De-bunching test
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Wednesday h18: 228b fill lost just before start of ramp.
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36: Injection:  Bunch length (too long, > 1.7ns) giving injection problems (BQM prevents extraction). SPS working on problem. Improved but not fully solved.  SIS interlocks because of timing mismatch of BPM’s (old acquisition stamp). Solved by SIS reboot. 12h14: Abort gap cleaning commissioning. In shadow: Update BI-QP fixed display (more memory allocation). 14h11: Injection for physics. 14h23: Trip of RB in 81. Water problem on bridge B (Thyristor bank). Access required. LHC 8:30 meeting 25/03/2011

1.38 TeV Stable Beams LHC 8:30 meeting 25/03/2011

1.38 TeV Lifetimes and Intensity LHC 8:30 meeting 25/03/2011

1.38 TeV Beam Dump LHC 8:30 meeting 25/03/2011

Why the Interlock? A single bunch with larger loss rates and low intensity is no problem  collimation takes care of it. Problem comes from BPM for dump protection:  A BPM is used to verify that local IR6 orbit is in allowed range for a beam dump (dump kick depends on offset in quadrupole).  Interlock checks that every bunch is inside orbit specification. Interlock due to intensity dependence of BPM readings:  In the region of 4-5e10 p per bunch, the BPM reading diverges.  If all bunches have low intensity  no problem, sensitivity range is switched (only possible for all bunches).  If only one or few bunches have low intensity  BPM reading for these bunches becomes artificially large and triggers interlock. Interlock due to instrumental effects + single bunch logic. Known but we could live with it so far due small beam- beam effects at 3.5 TeV LHC 8:30 meeting 25/03/2011

Abort Gap Cleaning The cleaning is considered operational again. It can be activated/stopped by the sequencer tasks:  Physics -> ALL RF tasks -> Sequence operate abort gap cleaning  Switch on AG cleaning B1  Switch off AG cleaning B1  Switch on AG cleaning B2  Switch off AG cleaning B2 Lack of time: re-commissioned with one bunch in the bucket 1:  Window function:120 x 40MHz buckets (b), aligned with abort gap. 5 b zero, 10 b rising edge, 30 b flat top, 10 b falling edge, rest zero.  The window function needs to be fine tuned in order to minimize impact on bunches in the very last buckets  more time.  New gating delays for VB1: 317, VB2: LHC 8:30 meeting 25/03/2011 D. Valuch

Friday, h55: Injection. 19h05: Ramp. Tuning at flat top:  Reduce chromaticity from +16 to +5.  Octupoles on. 20h03: Stable beams. Fill # h37: Beam dump:  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 23h31: Trip power converter RB.A78.  No beam, just getting ready for injection.  Active filter problem.  Several accesses: Deactivated bridge B but still not staying on. Status 09h00: Repair ongoing… LHC 8:30 meeting 25/03/2011

See Effect of Collisions LHC 8:30 meeting 25/03/2011

Lifetime and Losses LHC 8:30 meeting 25/03/2011

Seen also in Bunch Length (blue, purple) LHC 8:30 meeting 25/03/2011

Incoming LHC 8:30 meeting 11 24/03/2011 Sat + Sun1.38 TeV, 1.38 TeV, 1.38 TeV Mon – ThuTechnical stop FriBack to physics program Scrubbing run delayed: Discussion in LMC After fix of RB.A78… Assume that we can change IR6 interlock to get longer fills (checked last evening, not possible for second fill but agreed to look at it today). Can consider going down in bunch intensity for 1.38 TeV as an option, but this costs time (requalification of orbit, collimation + protection at least to some extent).