Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 5, 2004.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
History of Natural Gas in the US In early 1800s, they used manufactured gas to light the streets in the US By 1850, almost 300 separate gas companies In.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 19, 2003.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Chapter 1 – A Brief History We are transitioning from regulation to deregulation for many of our telecommunication, natural gas, and electricity sectors.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Electricity Infrastructure: Overview and Issues (1) H. Scott Matthews February 13, 2003.
BA212: Class 2 An Overview of the Natural Gas and Electricity Industries.
 Detaching AC from MC  Rate Decoupling  Lowers consumption, therefore results in lower emission  Facilitating two-way communication  Increase Reliability.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
The Continuing Evolution of U.S. Electricity Markets
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
The Transmission Imperative November 3, 2011 Jay Caspary.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
By: Amanda Torres BLACKOUTS:What causes them and how to reduce… Energy is the main source that keeps this world alive. When energy blows out it causes.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
1 The Tres Amigas SuperStation VLPGO November 2011.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
Updated 1/28/2011.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
North American Energy Infrastructure Policy Philip Gonda Steven Mays Robert Floyd Josh Kapp.
How the Transmission System Works Really William F. Reinke.
GETTING ENOUGH COAL: MORE THAN A THREE LEGGED STOOL DAY ONE KEYNOTE: NOVEMBER 2, 2006 COAL NEEDS POWER COMPETITION TO SUCCEED John E. Shelk.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Demand Response
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Using Technology for Electricity improvements
RENEWABLES AND RELIABILITY
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010
EE6501 POWER SYSTEM ANALYSIS
Wholesale Electricity Marketing & Trading Fundamentals
The Future of Demand Response in New England
Strategies of Reliable Transmission of Energy In A Competitive Market
Electricity Restructuring and Deregulation
1/16/2019 Univ. of Chicago/Argonne Agents 2002, Oct. 12, 2002 Introduction to Electricity Regulation Randal C. Picker Leffmann Professor of Commercial.
Emeritus Professor of Electrical Engineering Arizona State University
Solar Energy Commercialization
Presentation transcript:

Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 5, 2004

Admin Issues  HW #2 Out Today  Semester Projects  Groups of 1 or 2 (max)  Topic on managing infrastructure  Pricing can be component but should have higher-level, decision type model

Recap of Last Lecture  Source of energy changed dramatically in 100 years in US  Now mostly fuel for transport, elec all else  Electricity still mostly fossil fuel dependent  Nuclear / renewables still very limited  Electricity grid has developed as needed over time with changing requirements/demands affecting it

Interstate Commerce (IC)  In early US history, states treated each other like foreign countries  Taxes, licensing, port restrictions, etc.  States had their own agreements with foreign countries (e.g. Britain)  This activity was not in ‘spirit of Union’  Constitution gave Congress power to regulate IC (as well as foreign nations)  Note regulate was intended to mean “make uniform”

Electric “Utilities” (Utils)  Electricity businesses eventually crossed jurisdictional lines and became regulated  Economies of scale - cheaper to have many users  Regulated as “natural monopoly”  Strategy was vertical integration (ownership of all local pieces - generation, trans, dist)  Started to interconnect - helps reliability, cost  Easier to regulate, but hard to control price  Recently USA decided to ‘deregulate’ and push for wholesale markets to trade power  End result: electricity sent over longer distances and through more systems than originally designed for

System Statistics (End 2000)  127 million “customers” (all sectors)  Total electric power demand = 3500 TWh/yr  Number of power plants  Non-utility: 6500 units, 208 GW (growing - dereg)  Utility: 9350, 600 GW  154,000 miles of AC transmission lines  3,300 miles of DC transmission lines  Next 10 yrs: 6% transmission (line-miles) growth, but 20% capacity/demand growth  Not a problem, if plants sited near demand  But, of course, its not! 

Electric System Challenges  Unique  Instantaneous management of supply and demand  Imagine having built infrastructure that dynamically reconfigured itself to get you to your destination efficiently, without delay  Maintain 60Hz frequency  Passive Transmission  Few control valves  Just open and close switches to dispatch transmission lines

Implications  Every action can affect everyone else  Need to coordinate  Cascading problems  Need to be ready for next contingency dominates design  “what if” planning  Flows near speed of light - need to act fast

Diagram of U.S. Electric Power Grid Removed Due to National Security Implications (Seriously!)

Blackout of November 9, 1965  By 1965, electricity part of everyday life  Most of NE US (and Canada!) dark  Sign that we were not managing well  Six days to realize source of problem  1 relay failed at station in Canada (Niagara Falls)  Caused transmission line to go ‘open’  Caused series of cascading failures all the way back to New York City  Took only 15 minutes to blackout NE US  Caused people to rethink dependence  Until then, power systems design geared around ‘isolation’ to prevent damage

As a Result of 1965 Blackout..  Consumers made contingency plans  As did firms and large industrial users  At high/policy levels, coordinating entities were formed to manage  North American Elec. Reliability Council (NERC)  New York Power Pool (NYPP)  Developed industry equipment standards  Developed reserve gen. capacity  Interconnection and reliability methods  Isolation had led to islands/points of failure  Now we more heavily ‘network’ the system so there are multiple paths for power to flow

NERC  Voluntary organization to promote reliability  Alternative to being regulated  Sets standards, collects data, etc.  No longer sufficient after dereg. Three major interconnected power systems in US that coordinate actions to keep reliability

Reliability Components  Adequacy  Does (projected) Supply = Demand?  A long-term planning process  Security  Robust system against failures (short-term)  NERC transitioning to have enforcement power to meet reliability

Electric Power ‘Jurisdiction’  FERC - Fed Energy Regulatory Comm.  Regulates trans/sale of energy and fuels  Electricity : regulate bulk power  Oversees environmental issues  Budget from fees to regulated firms  NERC (already done)  Control Areas - fundamental entity (150)  Vary: PJM (50,000 MW) others 100 MW  Regional Reliability Councils (10)  Interconnects (3)  Note State PUCs not mentioned

Deregulation Effects  Transmission built primarily over 100 years by vertically integrated utilities  Originally built close to fuel supply  Recap: at first only local transmission built  Some interconnections built for reliability, relief  Utils cooperated - in mutual best interest  Dereg. sought to lower elec prices by:  Making capital available for new capacity  Increasing efficiency of operations  Trans. grid ‘interstate’ for wholesale electricity  But highway congestion just means delay  Electric transmission congestion = lost energy!

Deregulation (cont.)  Now > 50% of power sold wholesale first  Congestion - demand & construction of new generation not matched with new trans.  Incentives to cooperated reduced  What happened in California? Depends!  Imbalance in supply/demand - not much new supply approved for construction, demand higher  Big part of problem was faulty market design  Lack of adequate transmission for competitive power to come into market to ease prices  1996: FERC opened ‘wires’ to non-utilities  Basically opened market to competition

Energy Policy Act  1980s: electricity trading had taken off  Act pushed trading: Gen & Trans competition  Non-utils to have power plants  By 1998: nonutils 13% market share  Called Independent Power Producers (IPP)  Don’t forget regulatory process!  Congress : laws + authority, implementation : agencies  FERC Order 888: encouraged ISOs  Independent System Operators  Independent of commercial interests  Could own no generation

Recent changes  ISOs - Independent System Operators  Open and fair access to regional grid; non- discriminatory governance structure; facilitating wholesale electric rates; independent - don’t own gen/trans  1999: FERC Order - RTOs  Regional transmission organizations

Factors for Transmission and Distribution Losses  Location of generating plant and load connection points (how close to demand)  Types of connected loads  Network configuration  Voltage levels and voltage unbalance  Dynamic factors (e.g. power factor, harmonics, control of active and reactive power)  Length of the lines - almost linear relationship  Current in line - a square law relationship  Design of lines, particularly the size, material and type of cables  California / US about 10%

Cost Issues  Average electricity price 7 cents/kWh  Decreasing by new const and coal prices  Expected demand growth 2%/yr til 2020  Transmission costs ~10% of total cost  Resulting bottlenecks cause short-term price increases and thus higher costs!  Problem areas California, PJM, NY, New England  $500M / yr in these areas alone

Management Metrics  Capacity Margin = Generation/Demand  Base load - min. amount electricity required over a given time interval, at steady rate  Peak load - max load requirement during a given time interval  Intermediate load - between base & peak

Energy Balance for Typical Coal Plant efficiencyinpowerstat/energylosses/energylosses.htm