04/27/2010 Acceptance Test 1. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 04/27/2010 Acceptance.

Slides:



Advertisements
Similar presentations
Requirements Specification Presented By: Code Shark Solutions 11/3/10.
Advertisements

Preliminary Design: Smart Scheduling Client: Dr. Robert Yoder.
April 29, Simnet View Acceptance Test by InnoSmart Technologies.
Acceptance Test: Smart Scheduling Client: Dr. Robert Yoder.
November 28th, Simnet View Preliminary Design by InnoSmart Technologies.
5/2/2006 SaintSoft: Acceptance Test 1 Environmental Monitoring System Acceptance Test by Saint Soft.
Presents: MediTrak We’d Like to Welcome: Dr. LaRow & Guests.
10/28/2005 SaintSoft: Requirements Specifications 1 Environmental Monitoring System Requirements Specification by SaintSoft.
9/25/2009 Software Plan. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 9/25/2009 Software Plan.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /25/2009Digital Evolutions | Software.
Alumni Spotlight Web Systems Software Plan Presentation by Initrode Solutions 9/23/2006.
1 Remote Monitoring System EIN Systems Environmental Intelligence Network Systems Remote Monitoring System - Requirements Specification - Welcome Mr. Ken.
Tavern Review Website As Presented By Team Yale. Requirements Goal – Create a website that appeals to a college-aged crowd, but also useful for any Chicagoan.
October 26th, Simnet View Requirements Specification by InnoSmart Technologies.
9/21/2007SKYNET Software Plan Dynamic Network Device Mapping System (DNDMS) Software Plan By SKYNET Software.
Welcome to the Acceptance Test Presentation Mr. Jay Bebb & Mr. Brian Peppiatt.
Software Plan: Smart Scheduling Client: Dr. Robert Yoder.
Software Plan MAJIK Software Solutions Virtual Network Device Mapping System Software Plan By MAJIK Software Solutions.
Requirements Specification MAJIK Software Solutions 1 Virtual Network Device Mapping System Requirements Specification By MAJIK Software Solutions October.
Alumni Spotlight Web System Acceptance Test by Initrode Solutions.
5/1/07Acceptance Test1 Automated Excel Grading System Welcome Ms. Jami Cotler and Dr. Scott Hunter And Guests.
Title 1 Software Linked Interactive Competitive Environment Software Plan September 23 rd, 2011.
2/21/2006 SaintSoft: Detailed Design 1 Environmental Monitoring System Detailed Design by Saint Soft.
School of Science Network Device Display System Requirements Specification by Orion Technologies Roger Bacon Hall Room 328 October 24, :15 AM.
Alumni Spotlight Web Systems Requirements Specification by Initrode Solutions 10/25/2006.
School of Science Device Networking System Software Plan by Orion Technologies Roger Bacon Hall Room 328 September 21, :15 AM.
IOS Detailed Design Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) DETAILED DESIGN Roger Bacon Science Center, Room 328.
Requirements Specification: Smart Scheduling Client: Dr. Robert Yoder.
FSH Technologies Preliminary Design: F.I.L.E.T. December 9, 2011.
Welcome Mr. Jay Bebb & Mr. Brian Peppiatt. September 24, 2003Advanced Digital Data, Inc.2 Christopher Conway, Design Consultant Jessica Gallo, Team Leader.
12/02/2005 SaintSoft: Preliminary Design 1 Environmental Monitoring System Preliminary Design by SaintSoft.
11/4/2009 Requirements Specification. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 11/4/2009.
10/24/2007SKYNET Requirements Specification Dynamic Network Device Mapping System (DNDMS) Requirements Specification By SKYNET Software.
Alumni Spotlight Web System Detailed Design by Initrode Solutions 03/06/2007.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Preliminary Design 12/7/2011 Presented By: ExoNET Solutions 1.
Detailed Design: Smart Scheduling Client: Dr. Robert Yoder.
February 21, Remote Monitoring System EIN Systems Environmental Intelligence Network Systems Remote Monitoring System - Detailed Design - Welcome.
Software Plan Presented By: Code Shark Solutions 9/24/10.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Acceptance Test 05/01/ GUEST REGISTRATION ADVANCEMENT SUNNY SOLUTIONS ACCEPTANCE TEST.
Title 1 Software Linked Interactive Competitive Environment Acceptance Test April 26 th, 2012.
Hobb-IT Hobby Information Tracker By Illumination Technologies Requirements Specification October 28 rd Illumination Technologies Hobb-IT.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
CCRS Comprehensive Conference Registration System Acceptance Test May 1 st,
DIT314 ~ Client Operating System & Administration CHAPTER 5 MANAGING USER ACCOUNTS AND GROUPS Prepared By : Suraya Alias.
March 19 nd /19/2014 Detailed Design 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling.
Title 1 Software Linked Interactive Competitive Environment Detailed Design March 1 st, 2012.
Online Friends’ Community Presented by: Stuart Monaghan HND in Computing th May 2002.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /2/2009Digital Evolutions | Requirements.
R.O.S.E.S. Preliminary Design Presented By: Code Shark Solutions 12/8/10.
Detailed Design Presented By: Code Shark Solutions 03/01/11.
April 30 th 2014 oldGMCtrucks Mapper. 4/30/2014 Detailed Design 2 oldGMCtrucks Mapper Client: Dr. Timoth Lederman Guests & Class.
FSH Technologies Acceptance Test: F.I.L.E.T. April 26th, 2012.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Acceptance Test 04/25/2012 Presented By: ExoNET Solutions 1.
Johnson Lab Database Senior Design Project Management II Spring 06 Mark Nelson.
1 March 2005Spartacus Computing Solutions1 WELCOME to the Detailed Design Presentation Ms. Kate Zimmerman, Siena College Academic Program Administrator.
Preliminary Design By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
 CCRS Comprehensive Conference Registration System Software Plan September 21 st, 2012 S.E.E. Solutions 1.
Acceptance Test By Phoenix Tech AcceptanceTestAcceptanceTest.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Software Plan By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
29 September 2004Spartacus Computing Solutions1 Welcome Mr. Brian Smith, Siena College Webmaster & Ms. Kate Zimmerman, Siena College Academic Program Administrator.
Welcome Dr. LaRow & Distinguished Guests. Visual Design Technologies Meditrak Requirements Specification October 31, Visual Design Technologies.
C hevrolet A dvance- D esign S eries Paint Visualizer Detailed Design YOUR DREAM, OUR SOLUTION 1.
October 30 th /28/2013 Requirements Specification 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling.
Gateways security Aashish Sharma Security Engineer National Center for Supercomputing Applications (NCSA) University of Illinois at Urbana-Champaign.
College Catalog System
By Janet Crawford and Dam Luong Submitted to the Faculty of
Transparent Wireless Authentication For New Wireless Network
College Catalog System
Presentation transcript:

04/27/2010 Acceptance Test 1

Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 04/27/2010 Acceptance Test 2

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 3

Kelly Monroe Robert DeSarbo Timothy Egan Alexander Evanciew Alexander Johnson David Nopper Team Leader Webmaster Information Specialist Systems Administrator Database Administrator 04/27/2010 Acceptance Test 4

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 5

04/27/2010 Acceptance Test 6 Development and Testing

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 7

 Must improve current MapBuilder mashup of the oldGMCtrucks.com Discussion Board users  Allow oldGMCtrucks.com Discussion Board users ability to locate other members via map  Improve functionality: increased user capabilities and interface ease of use 04/27/2010 Acceptance Test 8

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 9

 Five subsets: › Test Case › Unit Test › Integration Test › System Test › Acceptance Test 04/27/2010 Acceptance Test 10

04/27/2010 Acceptance Test 11 MemberPassFailComments  Has the ability to access the site through secure authentication X  Has the ability to request forgotten username X  Has the ability to request forgotten password X  Has the ability to login X  Has the ability to logout X  Has the ability to view the Member tools menu X  Has the ability to use the Member tools menu X  Has the ability to view the map X  Has the ability to interact with the map X  Has the ability to zoom in on the map X  Has the ability to zoom out on the map X  Has the ability to pan the map X  Has the ability to add personal information X o Update First Name X o Update Last Name X o Update Address X o Update Geo-location X o Update Pictures X o Update Information WindowX

04/27/2010 Acceptance Test 12

04/27/2010 Acceptance Test 13

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 14

04/27/2010 Acceptance Test 15

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 16

 A CD-ROM(or DVD) with the following › Acceptance Test Documents › Test Plan & Test Results › A copy of you Acceptance Test PowerPoint Presentation › A full copy of the completed team files for the team’s directory, including all website files. › A README.TXT file that will explain where files are located. 04/27/2010 Acceptance Test 17

 Introduction  Our Model  Problem Overview  Testing Results  Demonstration  Deliverables  Conclusion 04/27/2010 Acceptance Test 18

 Completion of the Waterfall Model 04/27/2010 Acceptance Test 19 Development and Testing

04/27/2010 Acceptance Test 20 Project: N.A.T.O Date: 4/29/2010

 Academic Celebration – April 30 th  Software Engineering Party – May 3rd 04/27/2010 Acceptance Test 21

 …for your time and patience  Questions? 04/27/2010 Acceptance Test 22