PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.

Slides:



Advertisements
Similar presentations
1 Group 1 Meeting, Catania, Sept,16, 2002 STATUS REPORT ON DAFNE P. Raimondi for the DAFNE team.
Advertisements

KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
Short Review HERA Run 2002 / 2003 Luminosity Polarization Backgrounds Shutdown Activities Plans for Restart Report on HERA 64th Meeting of the DESY PRC.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
HERA Running 2005 F. Willeke, DESY 60 th Meeting of the DESY PRC November Luminosity Polarization Backgrounds Improvements Technical Issues.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SLAC Accelerator Department B-Factory Operations and Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
PEP- II Linac Accelerator Systems Department PEP-II Overview and Future Plans John Seeman SLAC Particle and Particle-Astrophysics DOE PEP-II Operations.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
(on behalf of the DAFNE team)
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Summary of Washington DOE Review
Super-B Accelerator Overview
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division SLAC DOE HEP Review June 14, 2005

PEP- II Linac Accelerator Systems Department Topics Highlights of Run 5 of PEP-II Run plan through 2008 How to increase the luminosity to 2.1 x Future down work

PEP- II Linac Accelerator Systems Department The PEP-II Team August 2004

PEP- II Linac Accelerator Systems Department Beam Lines

PEP- II Linac Accelerator Systems Department PEP-II arc section

PEP- II Linac Accelerator Systems Department PEP-II HER RF cavities

PEP- II Linac Accelerator Systems Department PEP-II Interaction Region Components near BaBar HER LER Collision point BaBar

PEP- II Linac Accelerator Systems Department PEP-II Machine Advisory Committee Reviews PEP-II Machine Advisory Committee –1) Jan 4-6, 1995 –2) August 24-25, 1995 –3) April 11-13, 1996 –4) January 6-8, 1997 –5) November 10-13, 1997 –6) December 14-16, 1998 –7) October 9-11, 2003 –8) April 15-17, 2004 –9) December 13-15, 2004 –10) October 5-7, 2005

PEP- II Linac Accelerator Systems Department Other Program Reviews DOE Operations Review in June 2004 PEP-II End of Run Review August 2004 PEP-II Restart Validation Review February- March 2005 SPC May 2005 DOE Operations Review in late Summer- early Fall 2005

PEP- II Linac Accelerator Systems Department PEP-II Safety Planning and Restart Plan Electrical accident at SLAC on October 11, All running of accelerators stopped. Safety training with new procedures October 2004 – March Type A Investigation October-December, Corrective Action team: December 2004-January Restart Validation Review: February “Pre-restart” conditions completed March Linac and PEP-II operations start up April 15, Power outage: May Beams returned about May 25. FFTB beam line revalidated June 2, FFTB beam started June 3, 2005.

PEP- II Linac Accelerator Systems Department 230 kV Lines

PEP- II Linac Accelerator Systems Department The cable break area 230 kV lines

PEP- II Linac Accelerator Systems Department The tree that fell (100 ft tall) Neighbor’s tree Stanford tree

PEP- II Linac Accelerator Systems Department Power line loose cables

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department String new wires by crane

PEP- II Linac Accelerator Systems Department Summer 2004 PEP-II Improvements IR2 south forward shield wall: Backgrounds Add another new LER RF station: Higher current Add a HER RF station by splitting up a current 4 cavity station into two 2 cavity stations: Higher current Two new “Frascati” longitudinal kickers in LER: More stability New electrodes for transverse kickers: More stability Add fans to all HER bellows: Cool Higher Order Modes (HOMs) Alignment work (quadrupole rolls): Smaller vertical emittance New LER synchrotron light monitor: Smaller vertical emittance IR NEG pump HOM reduction: Better lifetime and backgrounds New Support Tube Chiller: Higher currents

PEP- II Linac Accelerator Systems Department PEP-II Run Schedule PEP-II Run 5 started April 15, Will collide steadily from April 2005 through July 2006 with a one month break in October Next ROD (repair day) about August 3, Down in 2006 August through November for BaBar, PEP-II, and LCLS upgrade work. Three month down in Summer-Fall 2007 for LCLS work. Collide through September 2008.

PEP- II Linac Accelerator Systems Department October Down Tasks Safety –PPS recertification –PEP-II NIT lighting –Linac switch gear work –New K1A/B and K10B substations Routine maintenance PEP-II Upgrades –New x-y BPMs –RF work –IR vacuum chambers LCLS installation –Beam pipe through Sector 20 wall –Beam stoppers –Waveguide work –Accelerating section work –Sector 24 stairs installation

PEP- II Linac Accelerator Systems Department Daily Integration Record with Trickle Injection 710/pb LER I HER I Luminosity

PEP- II Linac Accelerator Systems Department PEP-II Monthly Peak Luminosity

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department Prediction July 2003 Actual

PEP- II Linac Accelerator Systems Department Prediction April 2005 Actual Power outage

PEP- II Linac Accelerator Systems Department PEP-II Issues Recent issues: –Positron source coil short –Positron source vacuum leak –PEP-II HER arc vacuum chamber water plugs –PEP-II LER trouble with orbit steering –PEP-II klystron failure (collector damage) –Power outage changed conditions Present issues: –Changing machine conditions over hours (orbits?) –Luminosity droop along mini-trains: (wakefields, parasitic collisions, electron cloud, RF loading?)

PEP- II Linac Accelerator Systems Department Change of specific luminosity over mini-trains Mini-trains Specific luminosity Luminosity

PEP- II Linac Accelerator Systems Department Luminosity Equation  y is the beam-beam parameter (~0.065)  I b is the bunch current (1 to 3 mA)  n is the number of bunches (~1600)  y * is the IP lattice optics function (vertical beta) (10 mm)  E is the beam energy (3.1 and 9 GeV)  Luminosity (10 33 cm -2 s -1 )

PEP- II Linac Accelerator Systems Department Future luminosity increase factors ParameterPresentFutureLuminosity gain ratio Hardware and work needed LER current2450 mA4500 mATwo RF stations, new IR vacuum chambers HER current1550 mA2200 mA 1.61Two RF stations, new IR vacuum chambers y*y* 10.5 mm8.5 mm 1.24HER higher tunes, RF & power supplies work yy L H L H 1.17Tune plane, coupling, & IR work Total x 2.3

PEP- II Linac Accelerator Systems Department Overall Parameters and Goals ParameterUnitsDesign Best in collision Future 2007 goal I+mA I-mA Number bunches y*y* mm Bunch length mm yy Luminosityx Int lumi / day pb Over five times design!Over three times design Twice design

PEP- II Linac Accelerator Systems Department PEP-II Future Luminosity Parameters xx yy xx yy nI x*x* y*y* Lumi xx yy Unitscmmmnm mA mm mm x1E33 LER now LER HER now HER

PEP- II Linac Accelerator Systems Department Future PEP-II Improvement Activities New transverse digital feedback processors (Summer 2005) New RF comb filters (Fall 2005) New klystron linearizer (Spring 2006) Install LER-5 RF station (Fall 2006) Install HER-10 RF station (Fall 2006) Upgrade several high-power IR vacuum chambers (Q2, Q4, Q5, Q2 bellows, LER abort spoiler, straight section bellows …) (Fall 2006) HER lattice upgrade for lower momentum compaction and shorter bunches (Fall 2006)

PEP- II Linac Accelerator Systems Department

Local Chamber Area Dots show new chamber locations.

PEP- II Linac Accelerator Systems Department New IP Be bellows design SiC Cooling

PEP- II Linac Accelerator Systems Department New Q2 Chamber Forward

PEP- II Linac Accelerator Systems Department Forward Q2 Chamber (HER/LER) LER leg HER leg

PEP- II Linac Accelerator Systems Department Straight HOM Bellows -Design Details GlidCop Stub Inconel Spring Finger GlidCop RF Shield Finger Welded Bellows Absorbing Tile 2.75” long by.24” wide HOM Trapping Slots Modes in the chamber propagate through the slots & are absorbed by the AlNiSiC. Bellows Cavity Modes that leak past the RF shield finger and are trapped in this area still see the absorber Beam Direction

PEP- II Linac Accelerator Systems Department New Q5 HER Chamber

PEP- II Linac Accelerator Systems Department Q5 HER details

PEP- II Linac Accelerator Systems Department HER Q4 Chambers Q5R BPM Q4R BPM 27.5 inches 14 inches e- Looking upbeam BPM Timing BPMs Electron BPMs

PEP- II Linac Accelerator Systems Department Q4/Q5 Bellows Layout Q4 side, 10” flange Q5 side 12” flange GlidCop Stub Inconel Spring Finger GlidCop RF Shield Finger Welded Bellows Cooling – not shown Absorbing Tile

PEP- II Linac Accelerator Systems Department IR Q4-Q5 bellows with HOM Absorbers

PEP- II Linac Accelerator Systems Department Accelerator Physics Studies Needed for 2x10 34 Better understanding of beam-beam effects –Parasitic crossings –Small crossing angles –Higher tune shifts Reduce beam aborts –RF trips –Longitudinal instabilities –Transverse instabilities –Better backgrounds Better magnetic lattice optics –Lower  y* –Reduce  beats –Improve luminosity tuning knobs Increase LER emittance with wigglers Continue to improve HOM damping at higher currents Determine instability growth rates in LER/HER at high currents –Transverse –Longitudinal –Electron cloud Machine-detector interface –Reduce backgrounds in trickle charge –Reduce IP pressure with current

PEP- II Linac Accelerator Systems Department Expected PEP-II Delivered Integrated Luminosity End of fiscal year Total PEP-II Projection Delivered “Yearly change” Peak Luminosity x FY /fb117/fb9.2 FY FY FY FY Projection May 2005

PEP- II Linac Accelerator Systems Department Integrated Luminosity Goals Now

PEP- II Linac Accelerator Systems Department Conclusions Restart Validation Process for PEP-II has been completed. Run 5 plan has started. PEP-II turn on in Run 5 is going well (in spite of the power outage). PEP-II has delivered over 14 fb -1 in Run 5 and over 270 fb -1 since May Trickle injection in both rings all of the time. Planned upgrades towards 2.1  are on track. Goal is more than 1 ab -1 in Run and down schedules have been mapped until 2008.