Solutions to Chapter 12 Exercises

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Chapter 6 Scheduling. 222 Learning Objectives Estimate the duration for each activity Establish the estimated start time and required completion time.
Chapter 7 Project Management
Finding the Critical Path
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Scheduling the Project
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
pert and cpm ch 9 Learning objectives:
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
MGMT 483 Week 8 Scheduling.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
LINE DIAGRAMS Learning objectives After this lecture you will be able to: Prepare and use line diagrams Demonstrate the effect that making activities ‘continuous’
Project Management Techniques.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 HW # Due Day: Sep 27.
Chapter 7: Schedule Management1 Solutions to Chapter 7 Exercises.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.
Project Management Methodology Project monitoring and control.
Lecture Note 4 Managing Analysis and Design Activities
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
1 Selected Topics on Project Management The Critical Path Dr Marc Conrad 1Marc Conrad.
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
PROJECT MANAGEMENT Approaches
PERT/Activity Diagrams, Completion Probability and the Z Score
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Chapter 6 Scheduling. 222 Learning Objectives  Estimate the duration for each activity  Establish the estimated start time and required completion time.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 7 : Risk Management – part 2
TK3333 Software Management Topic 6: Scheduling. Contents  Estimate the duration for each activity  Establish the estimated start time and required completion.
By: Matthew Forbes DO 1: PROJECT MANAGEMENT.  Taking last weeks do 1 to the next level  Duration and completion  Planned expenses  To be able to know.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Management Chapter Topics
Chapter 6 Scheduling
Earned Value Management
Hospital Establishment
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project Management 9. Performance Management
Problem solving.
CHAPTER 8: SCHEDULING (PENJADUALAN)
Chapter 6 Scheduling
Welcome to MM 305 Unit 8 Seminar!
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Fine-Tuning your plan and obtaining approval
Exercise – A small building.
PERT/Activity Diagrams, Completion Probability and the Z Score
Presentation transcript:

Solutions to Chapter 12 Exercises Chapter 12: Project Management

Chapter 12: Project Management Exercise 1 There are four paths: A-C-I (7 days) A-D-G-J (13 days) B-E-G-J (11 days) B-F-H-J (10 days) Thus, the critical path is A-D-G-J and these are the activities that should be monitored most closely because if they slip, the entire project will be delayed. Chapter 12: Project Management

Chapter 12: Project Management Exercise 1 concluded The time to complete the four paths is now: A-C-I (5.5 days) A-D-G-J (11.5 days) B-E-G-J (12.5 days) B-F-H-J (11.5 days) The critical path is now B-E-G-J and the project completion is expected to be 12.5 days. Activities G and J remain as critical activities while A and D are no longer critical. Chapter 12: Project Management

Chapter 12: Project Management Exercise 2 Chapter 12: Project Management

Chapter 12: Project Management Exercise 2: Path Slacks Path A-C-I: Slack = 6 Path A-D-G-J: Slack = 0 Path B-E-G-J: Slack = 2 Path B-F-H-J: Slack = 10 Chapter 12: Project Management

Exercise 3: Network Diagram 2 6 1 3 7 4 5 Chapter 12: Project Management

Exercise 3: Activity Expected Times, Variances and Standard Deviations Chapter 12: Project Management

Exercise 3: Path Expected Times, Variances, and Standard Deviations Chapter 12: Project Management

Exercise 3: Probability Project Finishes within 17 Weeks All paths must be considered since they all have a reasonable chance of taking longer than 17 weeks. Thus, there is a very small chance (i.e., .005%) that the project can be completed in 17 weeks or less. Chapter 12: Project Management

Exercise 3: Probability Project Finishes within 24 Weeks Only paths 1-2-6-7 and 1-3-5-7 need be considered. However, all paths can be easily included by simply changing cell B1 from 17 to 24. With all paths considered, there is a over an 86% chance of completing the project in 24 weeks. Chapter 12: Project Management

Exercise 3: Should the Project be Pursued? Using the spreadsheet it can be easily determined that the probability of finishing within 18 weeks is .176% and the probability of the project taking 22 weeks or longer is 48.321%. The expected value of the project is thus: (.176%  $10,000) + (48.321%  -$5,000) = -$2398.40 Given the negative expected value, the firm should not bid. Chapter 12: Project Management

Chapter 12: Project Management Exercise 4 The path with the longest expected time is a-b-dummy-f-h-i = 16. e 3 b 5 i 1 a 3 h 3 c 3 g 2 d 1 f 4 Chapter 12: Project Management

Chapter 12: Project Management Exercise 5 Chapter 12: Project Management

Chapter 12: Project Management Exercise 5a continued Chapter 12: Project Management

Chapter 12: Project Management Exercise 5b continued Chapter 12: Project Management

Chapter 12: Project Management Exercise 5c concluded Chapter 12: Project Management

Chapter 12: Project Management Exercise 6 # 1 # 6 # 4 # 5 # 9 # 7 # 3 # 2 # 8 Chapter 12: Project Management

Chapter 12: Project Management Exercise 6 continued Chapter 12: Project Management

Chapter 12: Project Management Exercise 6 concluded Path 2-3-4-5-7-8-9 has the longest expected time. Thus, the project would be expected to take 66.33. Chapter 12: Project Management

Chapter 12: Project Management Exercise 7 $ (000) Plan Plan Progress, % 40 30 Actual 35 24 20 17 55 70 55 70 Time, Days Time, Days Chapter 12: Project Management

Chapter 12: Project Management Exercise 7 concluded Spending variance = EC - AC = 17,000 - 30,000 = -$13,000. This indicates a cost overrun of $13,000. Schedule variance = EC - SC = 17,000 - 24,000 = -$7,000 indicating the project is behind. Time variance = TE - TA = 55 -70 = -15 days indicating a 15 day delay. Chapter 12: Project Management

Chapter 12: Project Management Exercise 8 $ (000) Plan 84 81 Value Actual 78 1 TE 2 3 Time, Months Chapter 12: Project Management

Chapter 12: Project Management Exercise 8 concluded Spending variance = EC - AC = 81,000 - 78,000 = $3,000. Schedule variance = EC - SC = 81,000 - 84,000 = -$3,000. TE can be estimated from chart by determining how much time should have elapsed according to the plan to achieve the current value completed. In this case TE is approximately 1.5 months. Thus, the spending variance = TE - TA = 1.5 - 2 = -0.5 month. Chapter 12: Project Management

Chapter 12: Project Management Exercise 9 Spending variance = EC - AC = 39,000 - 34,000 = $5,000. Schedule variance = EC - SC = 39,000 - 42,000 = -$3,000. Chapter 12: Project Management

Chapter 12: Project Management Exercise 10a Chapter 12: Project Management

Exercise 10a (concluded) Chapter 12: Project Management

Chapter 12: Project Management Exercise 10b From the above spreadsheet, the average project completion time is 90.33 days with a standard deviation of 5.16 days. Across the 100 replications of the simulation model, the project finished as quickly as 78.85 days and took as long as 103.51 days. Chapter 12: Project Management

Chapter 12: Project Management Exercise 10c Chapter 12: Project Management

Chapter 12: Project Management Exercise 10d Path A-C-F has an expected duration of 88.8 days with a standard deviation of 4.81 days. Based on this, the probability that it is completed in 80 days or less can be calculated as: From the z table in the Appendix A, the probability of the path being completed in 80 days or less is 3.51%. Alternatively, this can be found using Excel as follows: =normdist(80,88.8,4.81,true) = 3.37. Incidentally, the value found using Excel is actually more accurate since rounding the value of z was not required. Path B-D-F has an expected duration of 85.2 days and standard deviation of 7.31 days. Using Excel the probability it is completed in 80 days or less is found as: =normdist(80,85.2,7.31,true) = 23.84%. Path B-E has an expected duration of 59.0 days and standard deviation of 6.93 days. Using Excel the probability it is completed in 80 days or less is found as: =normdist(80,59,6.93,true) = 99.88%. The probability the entire project is completed in 80 days or less is calculated as (.0337)(.2384)(.9988) = 0.80% Chapter 12: Project Management

Chapter 12: Project Management Exercise 10e The results shown in the spreadsheet to part a are consistent with the probability calculated in part d. In only one of the 100 replications was the project completed in 80 days or less (i.e., rep number 14). One percent of the replications is quite close to the 0.8% calculated in part d. Chapter 12: Project Management