Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
Review of Detector Solenoid Effect to the Beam Effect on Beam Orbit Effect on Beam Size S.Kuroda(KEK)
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
IR Optics and Nonlinear Beam Dynamics Fanglei Lin for MEIC study group at JLab 2 nd Mini-workshop on MEIC IR Design, November 2, 2012.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
Grahame Blair, Tomoyuki Sanuki, Andrei Seryi
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Large Booster and Collider Ring
Alternate Lattice for LCLS-II LTU Y
First Look at Nonlinear Dynamics in the Electron Collider Ring
NEW DESIGN OF THE TESLA INTERACTION REGION WITH l* = 5 m
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Compensation of Detector Solenoid with Large Crossing Angle
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
Design of Interaction Region
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
IR Lattice with Detector Solenoid
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Upgrade on Compensation of Detector Solenoid effects
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005

Final Focus Optics 1. Beam size blow-up due to energy spread( chromatic effect )  Generally  is large for FF. (  =10 3 ~10 4, mainly from final Q) 2. Chromaticity correction introducing SX. 3. SX also introduces geometric aberration(GA).  Need another SX and special optics for the GA cancellation Two Cancellation Scheme “Traditional” :GA cancelled by -I optics between SXs “Local Correction” :  corrected locally

Traditional Optics TESLA TDR  correction by SX far upstream of IP Transfer matrix of -I between SXs  =  ’=0 at IP

Local Correction Optics [J.Payet, O.Napoly] NLC BDS [A.Seryi et al] New TESLA BDS  corrected locally  GA must be corrected by optics  2nd order  correction also required  c=0  Long drift space for dump Collimator in FFS  OCT tail folding works good

Summary of Optics ‘Traditional Optics’‘Local Correction Optics’ Easy to understand Tested at FFTB Wide momentum band width Expandability to high energy Compact beam line Recent design tendency is ‘Local Correction Optics’

Collimator Machine( Detector ) Protection Background to Detector SR of Beam Halo at Final Q Collimation with spoiler+absorber Energy Collimation Betatron Collimation Non-linear field in beam line  Simulation is required for performance check [TESLA]

Energy Collimation SR protection x+Lp = (  +L  ’)  < r Detector protection  Background study High dispersion & low beta section

Betatron Collimation High beta & dispersion free section Need iterative collimation for action variable cut in phase space (Optional use) Periodic Optics with  = 45°  emittance measurement SR by e  of (x, p) at distance L x+Lp= (in action-angle var.) < aperture

Performance of Collimator Better collimation performance in NLC/CLIC  (beta+  collimation+local correction FF is better than (  +beta)collimation+traditional FF ? [A.Drozhdin et al]

Other Machine Protection Magnetic Energy Spoiler(MES) OCT+skew SX Large  beam kicked by OCT horizontally large  x in skew SX  x-y coupling & beam blow-up Fast Extraction Line Long bunch spacing in Cold machine  much enough time to detect error and fire kicker [TESLA]

Other Issue for Collimator Spoiler & Absorber Wake field Heat load  survivability/life time Muon collimation survivable spoiler [A.Seryi] Fast emergency extraction line is necessary

Final Doublet Normal Electric Magnet Established technology Heat load  cooling Crossing angle  c & L* is the critical parameters for design Outgoing beam go inside or outside of the bore [T.Mihara,O.Napoly 1st ILCWS]

Super-conducting Magnet High gradient/Low power consumption Large bore radius ( common with outgoing beam ) Vibration?  He flow in cryostat Various type of SC magnets are proposed LHC Small bore/double aperture Compact SC magnet Flat inner tube 

Permanent Magnet High gradient w/o power consumption Compact/small bore Fine tuning for temperature/ rad. Damage Adjusting for big E change( e.g. Z-pole )  Hybrid Field compensation mover

Summary for Final Doublet EMSCPM Established technology Power consumption  cooling High gradient Large bore( generally ) Vibration? High gradient Compact/small bore Adjustability / tunability

Beam Extraction/Dump Charged beam extraction Boundary condition by  c and L* Diagnostic section 1) Energy 2) Polarization ……  Chicane for photon separation 2nd focusing point for Laser collision Machine protection by beamstrahlung  Dump for beamstrahlung? Background( neutron ) study from the extraction/dump ……

TESLA Extraction Head-on scheme Irradiation of septum magnet No beam diagnostic after collision is considered optics Beam size when no collision

GLC Extraction Geometry optics 7mrad crossing Superconducting final Q is assumed (out-going particle goes inside of Q ) Diagnostic section is considered. Transmission and background study  need more to do [K.Kubo]

Extraction for 20mrad crossing 2nd focal point in vertical chicane for beam diagnosis Good transmission for disrupted beam [Y.Nosochkov]

Others Straw-man layout for ILC BDS Yuri’s ILC 20 mrad dump lines IR1 20 mrad IR2 2 mrad Andrei’s 20 mrad ILC FF (x 4) NLC BSY dump lines 11 mrad NLC-style Big Bends 200 m drifts IP separation: 150 m (Z), 22 m (X) Design done except Pre-IP E-spectrometer FEXL Extraction for 2mrad [M.Woodley]

Solenoid Field Compensation LD model,  = 20 mrad LD model,  = 0 Solenoid field at FD  beam size blow-up ( independent on crossing angle ) With antisolenoids and linear knobs,  y = 0.9% Total field with and w/o antisolenoids Anti-solenoids provide good compensation, and it is considered as a part of detector More effective with skew Q [ Y. Nosochkov, A. Seryi ] Anti-solenoid compensation