LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Basic Refrigeration Cycle
10 June 2006MICE Collaboration Meeting CM-151 Can MICE Solid and Liquid Absorbers be Characterized to better than 0.3 Percent? Michael A. Green 1, and.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Parameter List Edda Gschwendtner Introduction Parameter list for sub-systems of MICE.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Vacuum Vessel Production Readiness Review
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
Progress on the MICE Cooling Channel Solenoid Magnet System
Thoughts on Incorporating HPRF in a Linear Cooling Channel Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory NuFact09—IIT.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
The issue: A non-standard thin window design  No closed form expression for maximum stress vs. volume pressure  FEA (finite element analysis): geometry.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Goal of MICE:   out /  in of   Assuming a standard (or agreed to) definition of 6-D cooling.  We can also assume that the tracker can give.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
LH2 Absorber Review 1.R&D Motivation 2.Windows (absorber and vacuum) 3.Absorber manifold designs and flow tests 4.System integration 5.Near term plans.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
LH2 Absorber Program and Plans Mary Anne Cummings MUTAC Review FNAL Jan 14, 2003.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Apr MUTAC 2005 LH2 Absorber Window R & D Program Mary Anne Cummings MUTAC Review LBL April 26, 2005.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Final Design Cryogenic and mechanical configurations
NPDG Liquid Hydrogen Target: Design and Safety Features
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Linac Test Area Instrumentation
MuCool Test Facility Instrumentation Update
Linac Test Area Instrumentation
Presentation transcript:

LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003

Hydrogen Absorber Design Principles Muons can focus going through material!  Absorber must handle significant head loads and maintain uniform density and temperature (huge for muon colliders!)  Beam heating must be minimized (high L R material in low ) Convection-driven liquid hydrogen absorber  Internal heat exchange, no external hydrogen loop  Need to monitor temperature, pressure and LH2 level Thin window development  Non-standard designs to minimize central thickness  Must be sufficiently strong and have robust structural attachments Location in center of high solenoidal magnetic field  Concerns for quench forces on structural stability  Heat stresses on windows below elastic tolerance Additionally.. RF between LH2 absorbers to restore forward momentum: The above goals drive the design of the absorber, its support structures, and placement in the cooling cell:

Liquid Hydrogen Safety  For safe operation, have designed with the redundant requirements: 1)LH2 and O2 separation 2)The avoidance of any ignition sources in contact with hydrogen.  The four key features of the design with respect to safety are: 1)Window thicknesses specified based on safety factors of 4.0 for the absorber and vacuum windows at maximum allowable working pressure (MAWP). Vacuum windows required to withstand 25 psi outside pressure without buckling. 2)Three layers of shielding between the outside atmosphere and the LH2; the outer surfaces are at room temperature to minimize the freezing of O2 on the absorber-system windows. 3)Separate vacuum volumes provided for the RF cavities, magnets, and LH 2 absorbers. 4)Hydrogen evacuation systems using valved vents into external buffer tanks. xx zz P1P1 P2P2    LH2 accelerator LH2 P1P1  Multiple scattering RF cavity dE/dx  +

Accommodating LH2 1.LH2-Air flammability limits: 4-75% ; detonability limits 18-59%  conventional seals and vacuum vessels can provide sufficient shield between them 2.Sufficient clearance for LH2 venting into evacuation tanks (21 liters liquid  liters at STP) 3.RF & Vacuum windows considered a “hazard/safe” barrier. 4.All safety interlocks mechanical – based on expeditious venting of LH2 5.Two sets of windows, cooling channel containment (with Ar gas seals at all flanges) RAL safe LH2 operation ISIS style safety scheme

Absorber details LH2 Volume (at 20K) 21 liters Absorber Vacuum volume 91 liters LH2 operating temp. 20.8K LH2 operating pressure 1.2 bars Allowable pressure range 1.05 – 1.7 bars Helium inlet temperature 14K Absorber Vacuum Volume: “Dome” “Magnet bore” Absorber Window: Vacuum Window: He outlet: He inlet: He heat exchange

Absorber coil system Ambient temperature on vacuum shields and outer channel wall Quench force on windows is small Static and quench forces are decoupled from the LH2 absorber Heat from quench and static sources are insufficient to cause boil-off Clearance for possible LH2 rupture into vacuum volume sufficient to prevent cascading window rupture

Thin Windows Design Progression of window profiles: “tapered” (1) and “bellows” (2 & 3) If thinnest point not at the center, where? Thin window and heavy flange of one piece … many options for absorber attachment Certification: No closed form relation between pressure and largest stress. Need to accurately confirm: Window manufacture Performance under pressure tests Two radii of curvature may not be concentric - critical to confirm minimum thickness 2 bolted options:

Photogrammetric measurements Strain gages ~ 20 “points” Photogrammetry ~1000 points CMM ~ 30 “points” Non-contact method ~ 1000 pts. measured simultaneously High accuracy for pressure tests and shape measurements Detailed enough data to confirm FEA calculations for extreme performance situations, and to confirm window manufactured as designed Portable system

Solid Absorber Changeover 1)None of the shielding requirments for LH2 2)Ambient and beam heat deposition require no special cooling requirements 3)Can be mounted and secured in existing absorber shell 4)Quench hazard?

Absorber Instrumention 1.All electronics will have to conform to European safety standards w.r.t. flammable gas. 2.Current absorber readouts:  Temperature probes  Pressure gauges  Level sensors 3.Can port through LH2 or vacuum: example: MDC Vacuum Products Corp 4/24/ UPS PC w/16chan ADC FISO Cryo(temp) IRM Barrier(s) network ACNET Sealed Conduit(s) Intrinsically safe signal conditioners and transmitters power Hazard Safe Intrinsically safe Concerns for absorber electronics: Power per channel Feedthroughs Seals Basic barrier Wire+shielding concerns: Two twisted pairs – not grounded, details depend on overall MICE grounding scheme Common mode surges due to magnets Noise/sensitivity issues

Experiment certification Windows certification done separately Certification of windows-absorber assembly Establish correct placement of absorber inside coil Pressurization tests of absorber/coil vacuum system Non-LH2 cryogenic test of absorber/coil system and instrumentation Assembly into channel: final purge before hydrogen fill LH2 absorber Coil Tranverse absorber/coil removal from channel

Exception Situations  Concern based on the potential hazards of LH2 Fire:  Large range of flammable and detonable limits  Burning velocity at STP: cm/s – MACC’s time in 200 meter run: 28.5 s = 702 cm/s  Minimum energy for ignition in air: 0.02 mJ Explosion: detonation velocity (STP): km/s Extreme cold – all the usual cryogenic hazards  Hazard analysis based system parameters: Pressure change  Leaks (rupture, seal failure, incorrect cryo. connections  Plugs (frozen LH2)  Overcooling/Undercooling of LH2 Temperature change Gas concentration  Safety failsafes based on 2 independent system failure