Towards Regional Independent Operators – a main driver for successful market integration.

Slides:



Advertisements
Similar presentations
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
Advertisements

The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Completing the EU internal energy market
1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Electricity Infrastructure Workshop Brussels, 13 February 2007 The framework for a Single European Electricity Market Mrs Asta Sihvonen-Punkka, CEER EWG.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas Third Package Progress GIE conference
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Update on electricity market Baltic Mini Forum 1 October, 2010.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
The Energy Package:– The New Regulatory Framework for Europe International Energy Conference, 12 March 2008 David Halldearn Senior Advisor European Affairs.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
The 3rd package for the internal energy market
ERGEG GRI South South East – , Maribor
Incentives for electricity infrastructure – ERGEG view
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Towards Regional Independent Operators – a main driver for successful market integration

Setting the scene 3 rd liberalisation package – 2 options proposed by the Commission: –Ownership Unbundling –National ISO model as second best solution Rationale: guarantee fair access to networks and remove discriminatory behaviour of vertically integrated companies BUT Ownership unbundling NOT conducive to market integration + 2 nd step needed to bring TSO activities together National ISO model not sufficient for market integration

Rationale for proposing a RIO Need to speed up market integration –To alleviate concerns of market concentration thereby increasing the number of market participants –To enhance price convergence –To reinforce trust in price formation and markets’ abilities to deliver –Etc. Close TSO cooperation needed for development towards an internal electricity market  RIO-model will drive market integration + solve the issue of fair access to networks

Tasks of a RIO – I Clear separation of the responsibilities of the RIO and the TSOs needed Access to the networks Day-ahead scheduling activities Calculation of grid capacity Procurement of balancing services Capacity allocation Secondary capacity markets Nomination of capacities Cross-border intra-day Invoicing for network usage

Tasks of a RIO – II Real-time operations Real-time system management Counter trading and redispatching Balancing of the grid System planning System adequacy report Investment plan Execution of investments = RIO to make a binding decision on the needs for additional capacity + set a timeframe for fulfilment by TSOs –TSOs obliged to fulfil capacity needs –Competent regulatory authority to approve decision

Remaining tasks for the asset owners (TSOs) Asset management as owner of the transmission assets Provide maximum availability of grid capacity (capacity adequacy) Execution of investments = Fulfilling the request for additional capacity (based on RIO’s binding decision on capacity needs) –For TSO to decide concrete technical investment project, i.e. how to practically fulfil the capacity needs, in close cooperation with the RIO Execution of maintenance work Provision of information to the RIO Tariff administration

Tasks and structure of the RIO

Governance and independence of the RIO – I Set-up of the RIO through legislation Independent Management of the RIO –Sole responsibility for day-to-day decision-making –Rules for management unbundling will apply Independent Supervisory Board –No conflict of interest with interests of RIO –Trustee organisation: correct balance to be found when appointing the trustees; no majority for any stakeholder group on regional level –Transparent decision-making process Advisory Committee(s) –To provide necessary technical input to the management of the RIO –Transparent decision-making process Supervision by the competent regulatory authorities on regional level

Governance and independence of the RIO – II Regulated organisation –Management incentives to achieve efficiency Separate accounting for different activities Remuneration of the expenses of the RIO via grid fees Liability: need for further discussion

Fair access to networks – I NOWWith RIO Generator 1Generator 2 TSO 1TSO 2 Regulator 1 Regulator 2 Access request by market participants owns Controls fair access Generator 1Generator 2 TSO 1TSO 2 Competent regulatory authority Access request by market participants owns RIO Controls fair access

Fair access to networks – II Fair access is guaranteed through strict governance rules for RIO (via independent management and independent supervisory board) Fair access also to be guaranteed through strict application of Directive 2003/54 –Effective and consistent implementation in Member States to be ensured –Rules for management unbundling to apply to Management of RIO –Supervision by competent regulatory authority Clear & transparent complaint mechanisms based on Directive 2003/54 Supervision by the competent regulatory authority

Regional market integration RIO to drive regional market integration  No geographical overlaps between RIOs, but responsibility for well-defined regional markets RIO should cover neighbouring TSOs Markets should not be split up but remain part of the same RIO Responsibility for inter-regional coordination Definition of regions: use EC Strategy Paper as a basis

Investments – Decision-making process RIO, with input of amongst others asset owners, carries out multi-annual regional adequacy analysis = basis for investment decisions –Optimisation of the regional grid RIO defines capacity needs which have to be fulfilled by the TSOs within a clear timeframe set by the RIO  –Approval by competent regulatory authority on regional level Leads to a concrete (technical) investment project decided by the asset owner (in close cooperation with RIO) –Obligation of the TSO to carry out investments which meet the capacity needs identified by the RIO (i.e. for TSO to decide how to practically meet the capacity needs) –Approval by competent regulatory authority on regional level

Investments – Decision-making principles Criteria in the decision-making process of the RIO Network situation in neighbouring areas Grid integrity Security of supply Value of enhanced system security and better system operation Socio-economic value of reduced generation costs for the region, taking account –Value of a better functioning market, e.g. price convergence and price correlation –Optimization of network losses Value of accommodating sustainable energy system changes Value of a more flexible network that can cope with changes in the market

Investments – Who pays for investments? Financing in general via network tariffs 2 ways to distribute the costs for investments: –New investment paid for by the customers benefiting from the investment OR –Socialisation of new investments to all customers of the region covered by the RIO Further discussion needed

Regulatory oversight Regional and ultimately European regulatory function to supervise RIO European mindset and mandate of (national) regulators needed as precondition Regional/European regulatory function to carry out the following tasks: –Approve the statutes of the RIO –Supervise network access to guarantee non-discriminatory access –Approve decisions on capacity needs and for the concrete investments –Approve the operational costs of the RIO –Ensure inter-regional cooperation of regulators responsible for different RIOs –Etc. A way to do it: create regional sub-committees within an ERGEG+ with active role of the Commission and clear fall-back powers