2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)

Slides:



Advertisements
Similar presentations
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Optics modeling and correction Yiton T. Yan Stanford Linear Accelerator Center Thanks to: Y. Cai, W. Colocho, F-J. Decker, M. Donald, Y. Nosochkov, J.
Slides from Mike Sullivan’s Presentation at the 2E34 Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
MIA optics knobs and IP knobs for PEP-II optics (+ dispersion) improvement and IP matching, and its fast iteration during MD for accommodating orbit drift.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Vibration of the Support Tube: Luminosity Lost and Found Alan Fisher, Jim Turner, Franz-Josef Decker, Mike Sullivan, Clive Field
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Status of the LHC optics T. Persson on behalf of the OMC-team.
Optics measurement, modeling, and correction - PEP-II experience Yiton Yan SLAC.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
MDI meeting, March 19, 2004 Categorizing radiation aborts Livio Piemontese When something really bad happens to the beams, they are aborted. An optimized.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
U. Wienands, Y. Cai, F.-J. Decker, M. Donald, W. Kozanecki, Yu. Nosochkov, T. Raubenheimer, J. Safranek, D. Sagan., A. Seryi, K. Sonnad, C. Steier, P.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Orbits, Optics and Beam Dynamics in PEP-II Yunhai Cai Beam Physics Department SLAC March 6, 2007 ILC damping ring meeting at Frascati, Italy.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Recent MIA Results Yiton T. Yan Stanford Linear Accelerator Center Acknowledgement: Y. Cai, F-J. Decker, S. Ecklund, J. Irwin, J. Seeman, M. Sullivan,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
WP3 status Interaction Region design
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
The PEP-II Interaction e+e- Factories Workshop
Status and Plan for the PEP-II Lattices
PEP-II Status and Plans e+e- Factories Workshop
Accelerator R&D Results from the B-factory
To Do list, open items as of 10-Feb \ Study threshold dependence on bunch length (Just changed Vrf to 4.5.
Orbit Bumps in PEP-II to Maximize Luminosity
IR Lattice with Detector Solenoid
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Update on MEIC Nonlinear Dynamics Work
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Some of the Points Raised During my JLAB Visit
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
IR/MDI requirements for the EIC
JLEIC Electron Ring Nonlinear Dynamics Work Plan
100th FCC-ee Optics Design Meeting
Presentation transcript:

2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)

Typical event pressures LER HER LER frangible link Detector Support tube end bellows 0.1 NEG pump Backward Q2 NEG Forward Q2 NEG M.Sullivan

Helium hosing layout LER HER Detector Support tube end bellows NEG pump Known small vacuum leak M.Sullivan

Beam Currents during He Flow Experiments Vacuum Spike Aborts

Signal from the known small leak about m in the upstream LER The flow meter says 2 SCFH for one tube M.Sullivan RGA He signal appeared ~5 min after He flow started

He flow turned on at 17:00. No signal yet. The two ion pumps 8020 and 3044 were turned off M.Sullivan

He flow still on No signal when we get a vacuum spike at 17:37 This spike reads 150 nTorr at 3027 M.Sullivan

He flow still on First He signal at 17:50 M.Sullivan

He signal getting stronger 10 min after first sign M.Sullivan

He signal getting stronger 20 min after first sign Some vacuum activity also seen on the gauges M.Sullivan

He turned off at about 18:20, at left edge of plot The two ion pumps 8020 and 3044 were turned on where the Argon trace drops A spike is seen in the He trace when we get a vacuum spike at 18:50 M.Sullivan

Status and plans More external leak checking We need to try to understand the signal we have seen Presently installing a controlled leak at the 3044 ion pump location. We are using the pump out port located there. Concentrate on improving the analysis that pinpoints the z location –More events to H. Nicholson of BaBar –Work on the IR vacuum model to see if we can get a z location from it –Study and perhaps improve B. Peterson’s analysis Hooked up one of the BPMs at 3024 to a high speed cable – did this yesterday – nothing seen yet Review the borescope videos again – still to do More… M.Sullivan

How To Improve the Specific Luminosity Beam size at the interaction point: Lower beta function Orthogonal waist knob Solenoid compensation Orthogonal IP knobs Vertical steps in the LER Solenoid compensation Vertical dispersion in arcs Coupling in arcs Closer to half integer At high currents:  1 may have to be increased Fast damping time is better Y.Cai

MAC recommendations 1.Develop a focused and schedule-oriented approach to achieving a high quality optics model and lattice correction capability. 2.Develop the machinery to allow rapid iteration between measurement and correction. 3.Aggressively pursue lattice correction in both rings to drive the actual lattices to the design. 4.Pursue model-based coupling analysis and correction. Y.Cai

Milestones March 31, 2006 –Measure machine optics and build a linear online model within a shift –Reduce beta beating down to 30% in both machine without losing luminosity –Stabilize the orbit within 200 microns in both machines –Test coupling and dispersion corrections in the machine –Calibrate IP knobs against experiment June 31, 2006 –Update beam-based on model within two hours for both machines –Reduce beta beating down to 15% in both machines without losing luminosity –Stabilize the orbit within 100 microns in both machines –Build all IP knobs within a shift based on the online model –Reduce  y bellow 1.5 nm-rad in both machines without losing luminosity These are not just straight-forward works. There are associated accelerator physics issues to be solved. Y.Cai