HLT & Calibration.

Slides:



Advertisements
Similar presentations
High Level Trigger (HLT) for ALICE Bergen Frankfurt Heidelberg Oslo.
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
Time Projection Chamber
TOF offline and calibration A. De Caro (University and INFN of Salerno)
HLT - data compression vs event rejection. Assumptions Need for an online rudimentary event reconstruction for monitoring Detector readout rate (i.e.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg 1 Tag Database for HLT Micro-ESDs.
CHEP03 - UCSD - March 24th-28th 2003 T. M. Steinbeck, V. Lindenstruth, H. Tilsner, for the Alice Collaboration Timm Morten Steinbeck, Computer Science.
Normal text - click to edit Status of implementation of Detector Algorithms in the HLT framework Calibration Session – OFFLINE week ( ) M. Richter,
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg 1 HLT and the Alignment & Calibration DB.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
7/19/2004FTPC Review - J. Seyboth1 FTPC Review - Software Janet Seyboth for the FTPC group DAQ Online Calibration Databases Offline Documentation FTPC.
FTPC calibration status Joern Putschke for the STAR FTPC group STAR Analysis Meeting 2002 October 22-24, 2002.
1 TPC online  offline calibration November 2002.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The High-Level Trigger of the ALICE Experiment Heinz Tilsner Kirchhoff-Institut für Physik Universität Heidelberg International Europhysics Conference.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Simulation of GOSSIP/GridPix Nominal Detector, and GOSSIP in ATLAS.
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
TPC in Heavy Ion Experiments Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Nov 2002T. Ljubicic DAQ100 Calibration Needs 10 to 8 bit (and back!) conversion table Gain correction per pad T0 correction per pad.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
FTPC calibration status & plans for Y03 Joern Putschke for the STAR FTPC group STAR Calibration Meeting 2002 November 7, 2002.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Alignment in real-time in current detector and upgrade 6th LHCb Computing Workshop 18 November 2015 Beat Jost / Cern.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Normal text - click to edit CHEP Mumbai ALICE High Level Trigger Interfaces … 1/22 ALICE High Level Trigger Interfaces.
15 December 2015Alan Norton, NA62, LKR WG 1 LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses LKR.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
AliRoot survey: Calibration P.Hristov 11/06/2013.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Marian Ivanov TPC status report.
CALGO: Software Tasks cal software:
The Silicon Drift Detector of the ALICE Experiment
TOF CALIBRATION DATABASE
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
HLT & Calibration.
TPC sector alignment Marian Ivanov.
Bi-Weekly Meeting 2004/09/08 Susumu Oda
Presentation transcript:

HLT & Calibration

HLT as Calibration Data Source Among the main tasks of HLT (especially in the first years) Monitoring of the detector performance Analysing calibration data (real events and calibration triggers) Calculation of a (first) set of calibration parameters Applying calibration to online event reconstruction Storing parameters in relevant databases Procedures are being developed in collaboration with TPC, TRD, PHOS, and Dimuon detector HLT is open for calibration tasks for all participating detectors Compatibility w. Computing Power / Financial Budget

HLT & Databases The HLT will have contact to different databases, which are for different purposes as well as under different administration. For now, it is foreseen to have contact to three different DBs: Configuration DB (DCS) Condition DB (DCS) Calibration DB (Detector Specific)

HLT DB Remarks Use of dedicated HLT portal nodes to contact DBs Redundancy of these nodes to avoid single-point-of-failures Data of the DBs is cached (where possible) and distributed to the appropriate places inside the HLT cluster (using its publisher- subscriber framework) Output data to DBs will be written from the global layer of the HLT cluster. Contact to the databases will be performed via ODBC or similar techniques.

TPC Calibration Example (1) Pedestal run analysis and download Pulser runs Accumulation of pulser events Gain calibration and timing alignment Map hot/dead pads Laser runs Online reconstruction of laser tracks Drift velocity map ExB map static E-field distortion map Electron attachment / gas contamination Online reconstruction of particle tracks / laser tracks Cluster charge loss per drift length

TPC Calibration Example (2) Drift velocity map Nuclear collisions Accumulate charge per timebin Calculate charge step at central electrode E.g. NA49 data NA49 charge step

TPC Calibration Example (3) Space charge effects Online reconstruction of tracks Histogram of track impact parameters E.g. STAR TPC – fluctuations on second timescale

TPC Calibration Example (4) Histogram of track residuals E.g. STAR TPC – grid leak distortions Ion leakage at gating grid gap

PHOS Calibration Example Pedestal run analysis and download LED runs Accumulation of pulser events Gain calibration and timing alignment Map hot/dead channels Gain/energy calibration Nuclear collisions Online pulse shape analysis Timing alignment (using fastest particles) Online reconstruction and accumulating of showers Relative gain calibration by equalizing channels Absolute energy calibration by monitoring pi0-peak

HLT Questions/Open Points To plan connections from HLT to DBs, HLT needs to know: At which places (processing steps) in the HLT cluster is DB data needed? What is the estimated processing budget for online calibration? What data for or/and from which databases? Which detector needs what data? How large is which data? (different for different data -> detailed list wanted) How often is data updated? (once (caching)  regular requests to DB) Output data General e.g. Drift Velocity: Type of measurement (once, continuous spectrum, every X sec., average, ...) Write to DB (continously, at end of run, ...) Who has access to data (online, offline)?