CEPC/SppC and FCC Collaboration J. Gao On behalf of CEPC+SppC Group IHEP, CAS, China Pre-FCC ICB Meeting Sept. 9-10, 2014.

Slides:



Advertisements
Similar presentations
CEPC Machine Optimization and Final Focus Design Dou Wang, Jie Gao, Ming Xiao, Sha Bai, Yiwei Wang, Feng Su (IHEP) October 2013, CERN. Geneva, Switzerland.
Advertisements

CEPC BoosterDesign CEPC Booster Design FCC Week 2015, March, 2015 Marriot Georgetown Hotel Huiping Geng Presented for Chuang Zhang.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
On CEPC-SppC Accelerator international Collaboration Issues Jie Gao On behalf of CEPC+SPPC Institute of High Energy Physics, Beijing Feb. 14, 2014 , Geneva.
The strategy of Accelerator based High Energy Physics of China J. Gao On behalf of CEPC+SppC Group IHEP, CAS, China Roundtable discussion: “Future machines“
Qingjin XU Institute of High Energy Physics (IHEP)
Future Accelerators at the High Energy Frontier
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
The IR lattice design and optimization of the dynamic aperture for the ring Yiwei Wang, Huiping Geng, Yuan Zhang, Sha Bai, Dou Wang, Tianjian, Jie Gao.
CEPC/SppC with ILC ( FCC) J. Gao Institute of High Energy Physics Beijing, CAS Panel discussion, Nov. 5, at LCWS 2015 Nov. 2-6, 2015, Whistler, Canada.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
Lattice design for CEPC main ring H. Geng, G. Xu, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, Y. Zhang, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai, Q. Qin,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Preliminary Result on L*=1.5m CEPC Interaction Region Yiwei Wang, Dou Wang, Sha Bai Yingshun Zhu, Teng Yue CEPC acc. meeting, 5 September 2014.
CEPC Interaction Region design and Dynamic Aperture Optimization Yiwei Wang, Yuan Zhang, Dou Wang, Huiping Geng, Xiaohao Cui, Sha Bai, Tianjian Bian, Feng.
CEPC/SppC Status -Report from Accelerator Group J. Gao On behalf of CEPC/SppC Group IHEP The 4 th CEPC Meeting Shanghai Jiaotong University, Sept. 13,
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
CEPC Accelerator Design Issues and International Collaboration J. Gao For the CEPC Accelerator Group Institute of High Energy Physics Beijing, CAS The.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
CEPC Status Yifang Wang Institute of High Energy Physics, Beijing Munich, May 2, 2016.
CEPC parameter choice and partial double ring design
MDI and head-on collision option for electron-positron Higgs factories
Interaction region design for the partial double ring scheme
Design study of CEPC Alternating Magnetic Field Booster
100km CEPC parameter and lattice design
The Studies of Dynamic Aperture on CEPC
CEPC parameter optimization and lattice design
Large Booster and Collider Ring
The 13th Symposium on Accelerator Physics
Issues in CEPC pretzel and partial double ring scheme design
CEPC pretzel scheme study
Pretzel scheme of CEPC H. Geng, G. Xu, Y. Zhang, Q. Qin, J. Gao, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai,
J. Gao, M. Xiao, F. Su, S. Jin, D. Wang, S. Bai, T.J. Bian
Optimization of CEPC Dynamic Aperture
Status of CEPC lattice design
CEPC Booster Design Dou Wang, Chenghui Yu, Tianjian Bian, Xiaohao Cui, Chuang Zhang, Yudong Liu, Na Wang, Daheng Ji, Jiyuan Zhai, Wen Kang, Cai Meng, Jie.
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
DA study for CEPC Main Ring
DA Study for the CEPC Partial Double Ring Scheme
Progress of SPPC lattice design
CEPC partial double ring scheme and crab-waist parameters
CEPC Injector Damping Ring
CEPC parameter optimization and lattice design
Interaction region design for the partial double ring scheme
CEPC partial double ring scheme and crab-waist parameters
Comparison of the final focus design
CEPC main ring magnets’ error effect on DA and MDI issues
LHC (SSC) Byung Yunn CASA.
ILC 3.2 km DR design based on FODO lattice (DMC3)
CEPC APDR and PDR scheme
ILC 3.2 km DR design based on FODO lattice (DMC3)
CEPC advanced partial double ring scheme
Optics Design of the CEPC Interaction Region
CEPC parameter optimization and lattice design
Design study of CEPC Alternating Magnetic Field Booster
Design study of CEPC Alternating Magnetic Field Booster
CEPC Partial Double Ring Lattice Design and DA Study
CEPC parameter and DA optimization
CEPC Partial Double Ring Parameter Update
CEPC optics and booster optics
Lattice design for double ring scheme of CEPC main ring
Update of lattice design for CEPC main ring
Update on CEPC pretzel scheme design
Lattice design and dynamic aperture optimization for CEPC main ring
Lattice design for CEPC PDR
Lattice design for CEPC
CEPC APDR and PDR scheme
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

CEPC/SppC and FCC Collaboration J. Gao On behalf of CEPC+SppC Group IHEP, CAS, China Pre-FCC ICB Meeting Sept. 9-10, 2014

Lepton and Hadron Colliders’ History and China Accelerator based High Energy Physics Development in the Future 2 BEPC II LC BEPC History of BEPC and BEPC II CEPC+SppC CEPC: Ecm=240GeV e+e- Circular Collider SppC: Ecm=50-100TeV pp Collider HIEPAF : High Intensity Electron Positron Accelerator Facility Old picture! CEPC+SppC will be constructed with international collaboration and participation

Strategy on Future High Energy Colliders of China 1) On “The 464 th Fragrant Hill Meeting”, Chinese High Energy Physics Community arrived at the following consensus: a) China supports ILC and will participate to ILC construction with in-kind contributions and requests R&D fund from government b) After the discovery of Higgs, as next collider after BEPCII in China, a circular e+e- Higgs factory ( CEPC ) and a Super proton- proton Collier (SppC) afterwards in the same tunnel is an important option and historical opportunity. 2) During the meeting of Chinese High Energy Physics Association on “China High Energy Physics based on Particle Accelerators”, Feb. 28, 2014, it was concluded that:“Circular e+e- Circular Higgs Factory(CEPC) +Super pp Collider (SppC) is the first choice for China’s future high energy physics accelerator. It is considered that CEPC (250GeV upper limit) is supplementary to ILC in terms of its energy range down to W and Z boson and to the number of detectors from both machines International collaboration and participation are necessary

Preliminary Conceptual Design Report of CEPC-SppC

Writing assigned for Pre-CDR 4CEPC - accelerator physics 4.1Main parameters Guo Yuanyuan, Geng Huiping, Wang Dou, Xiao Ming, Gao Jie 4.2Lattice Geng Huiping, Wang Dou, Guo Yuanyuan, Wang Na, Wang Yiwei, Xiao Ming, Peng Yuemei, Bai Sha, Su Feng, Xu Gang, Duan Zhe, Gao Jie 4.3IR and MDI Wang Dou, Geng Huiping, Wang Yiwei, Bai Sha,, Gao Jie 4.4Beam instabilityWang Na, Wang Yiwei 4.5Beam-beam effects Zhang Yuan, Guo Yuanyuan, Wang Dou, Xiao Ming, Gao Jie 4.6Synchrotron radiationMa Zhongjian, Geng Huiping 4.7Injection and beam dumpCui Xiaohao, Su Feng, Xu Gang 4.8BackgroundYue Teng 4.9PolarizationDuan Zhe  Visitors from other labs in the world participate the Pre-CDR joint works

CEPC Layout LTB : Linac to Booster BTC : Booster to Collider Ring BTC IP1 IP2 e+e- e+ e- Linac (240m) LTB CEPC Collider Ring(50Km) Booster(50Km) BTC

SppC Layout Medium Energy Booster(4.5Km) Low Energy Booster(0.4Km) IP4 IP3 SppC Collider Ring(50Km) Proton Linac (100m) High Energy Booster(7.2Km)

CEPC/SppC Layout LTB : Linac to Booster BTC : Booster to Collider Ring BTC IP1 IP2 e+e- e+ e- Linac (240m) LTB CEPC Collider Ring(50Km ) Booster(50Km ) BTC Medium Energy Booster(4.5Km) Low Energy Booster(0.4Km) IP4 IP3 SppC Collider Ring(50Km) Proton Linac (100m) High Energy Booster(7.2Km)

Possible site (example) 300 km from Beijing 3 h by car 1 h by train 9/45 Beijing Qinhuangdao Tianjing Beidaihe

ParameterUnitValueParameterUnitValue Beam energy [E]GeV120Circumference [C]km53.6 Number of IP[N IP ] 2SR loss/turn [U 0 ]GeV3 Bunch number/beam[n B ] 50Bunch population [Ne] 3.71E+11 SR power/beam [P]MW50Beam current [I]mA16.6 Bending radius [  ] m6094 momentum compaction factor [  p ] 4.15E-05 Revolution period [T 0 ]s1.79E-04Revolution frequency [f 0 ]Hz emittance (x/y)nm 6.79/  IP (x/y) mm800/1.2 Transverse size (x/y) mm 73.7/0.16  x,y /IP 0.1/0.074 Beam length SR [  s.SR ] mm2.35 Beam length total [  s.tot ] mm2.66 Lifetime due to Beamstrahlung min80 lifetime due to radiative Bhabha scattering [  L ] min56 RF voltage [V rf ]GV6.87RF frequency [f rf ]MHz650 Harmonic number [h] Synchrotron oscillation tune [ s ] Energy acceptance RF [h]%5.56 Damping partition number [J  ] 2 Energy spread SR [  .SR ] %0.13 Energy spread BS [  .BS ] %0.07 Energy spread total [  .tot ] %0.15nn 0.22 Transverse damping time [n x ] turns81 Longitudinal damping time [n  ] turns40 Hourglass factorFh0.679Luminosity /IP[L]cm -2 s E+34 Main parameters for CEPC

ParameterValueUnit Circumference52km Beam energy35TeV Dipole field20T Injection energy2.1TeV Number of IPs2 (4) Peak luminosity per IP1.2E+35cm -2 s -1 Beta function at collision0.75m Circulating beam current1.0A Max beam-beam tune shift per IP0.006 Bunch separation25ns Bunch population2.0E+11 SR heat dipole (per aperture)56W/m SppC main parameters

Beam-beam tune shift limit analytical calculations For lepton collider: For hadron collider: where SppC (actual parameter list) FCC (pp) (theory and FCC design) Formulae from private note of J. Gao r_e is electron radius γ= is normalized energy R is the dipole bending radius N_IP is number of interaction points r_p is proton radius J. Gao, Nuclear Instruments and Methods in Physics Research A 533 (2004) 270–274 J. Gao, Nuclear Instruments and Methods in Physics Research A 463 (2001) 50–61

CEPC lattice with FFS In current design: Circumference: 52.1 km 16*arcs: 2.64 km (60 FODO) 12*short straight: 352m (8 FODO) 4*long straight: ~700 m Bending radius: 5.7 km U0: 3.77GeV Nature emittance: 7.67 nm Nature energy spread: 0.19% Nature bunch length : 2.82mm Momentum compaction: 3.3E-5 (FFS)

 Use 2 pairs of electrostatic separators  Beam separated at horizontal plane with orbit offset of 5  x  Maximum bunch number: 96 Pretzel scheme

Half Quad of dispersion suppressor IP FFS entrance condition: DX=DPX=0  x=  y=0 betax=75.6m betaY=25.6m IR optics with L*=2.5m betaX*=0.8m betaY*=0.0012m L*=2.5m We use the same method as Yunhai’s example to make a new design of CEPC FFS. 15 Total length: 170 m

IR optics with L*=1.5m betx*=0.8m, bety*=1.2mm, L*=1.5m IPFTCCYCCXMT FT: final telescopic transformer CCY: chromatic correction section y CCX: chromatic correction section x MT: matching telescopic transformer The key issue of pre-CDR is to have a working FFS in CEPC with enough off- momentum dynamic apertures Key collaboration issue now, for example

SRF parameters of CEPC unitsMain RingBooster fRFMHz U0 ( single beam )GeV33 Beam current of e-&e+mA2*16=320.9 Total beam power (SR)MW total RF voltageGV76 EaccMV/m8.815 cavity cells59 cavity numbers Input power per cavitykW13920 Total RF powerMW LLRF station numbers Cryo module numbers180 (4cav/ module) 40 Another key R&D collaboration item is on CEPC SRF systems, both for main ring and for booster

SppC Technical challenges and R&D plan (Possible collaboration items) High field magnets: both dipoles (20 T) and quadrupoles (pole tip field: T) are technically challenging, key technology to be solved in the coming two decades by a strong R&D program (see the next slide) Beam screen and vacuum: the key issue to solve the problem with very high synchrotron radiation power inside the cold vacuum. Need to develop an effective structure and working temperature to guide out the high heat load when minimizing Second-Electron-Yield, heat leakage to cold mass, impedance in the fast ramping field, vacuum instability etc. Both design and R&D efforts in the coming decade are needed to solve this critical problem. Collimation system: requiring unprecedentedly high efficiency, may need some collimators in cold sections. Perhaps need new method and structure. R&D efforts are needed.

R&D plan of the 20 T accelerator magnets : Development of a 12 T operational field Nb 3 Sn twin-aperture dipole with common coil configuration and field quality; Fabrication and test of 2~3 T HTS (Bi-2212 or YBCO) coils in a 12 T background field and basic research on tape superconductors for accelerator magnets (field quality, fabrication method, quench protection) : Development of a 15 T Nb 3 Sn twin-aperture dipole and quadrupole with field uniformity; Fabrication and test of 4~5 T HTS (Bi-2212 or YBCO) coils in a 15 T background field : 15 T Nb 3 Sn coils + HTS coils (or all-HTS) to realize the 20 T dipole and quadrupole with field uniformity; Development of the prototype SppC dipoles and quadrupoles and infrastructure build-up. (Very Preliminary) 19

Timeline in 2014 CEPC Workshop in Shanghai Jiaotong University, Sept , 2014 ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders - Higgs Factory, October 8-11, 2014, Beijing Pre-CDR review: November 2014 Pre-CDR v1.0: by the end of the year 2014

CEPC/SppC long term Schedule (Preliminary) BEPC II will stop in ~2020 CPEC – Pre-study, R&D and preparation work Pre-study:  Pre-CDR by 2014 R&D: Engineering Design: – Construction: – Data taking: SPPC – Pre-study, R&D and preparation work Pre-study: R&D: Engineering Design: – Construction: – Data taking:

Collaboration Issues (1) (Common and different points) FCC is similar to CEPC/SppC in machine and particle types However, there are two main differences: (1) FCC’s priority is focusing on pp, CEPC/SppC’s priority is focusing on e+e- (2) FCC’s CDR is due in 2018, and CEPC/SppC ‘s CDR is due in 2015 (3) CERN is running LHC (pp) with LHC upgrades following and IHEP is running BEPCII (e+e-) with CEPC/SppC following

Collaboration Issues (2) (Feature of relation between FCC and CEPC/SppC) FCC and CEPC/SppC represent the landscape of future super circular accelerator centers in addition to Linear one, ILC FCC and CEPC/SppC is complementary in particle type priority and program schedules FCC and CEPC/SppC is complementary in their advantages, i.e. technologies, human resources, economical potential, etc… In short, FCC and CEPC/SppC is of collaborative relation instead of others, which is vital for both programs

Collaboration Issues (3) (The possible mode of collaboration between FCC and CEPC/SppC) 1)Exchange visitors (Ph.D students also) 2)Visitors working on both projects ( with comparisons, cross- checks, new ideas, training students, etc., design works in the first phase) 3)Joint meetings (with web-meetings), workshops, and schools, etc… 4)Help each other by taking into account of differences in time and particle type priorities… 5)Key technical parameter be better same such as rf frequency 6)Common design of key components, such as SCRF system… 7)Joint R&D on key bottle –neck design and technology development (IR FFS design , SRF systems, High field SC magnets, Prezel technology, for examples)

Summary (1) FCC and CEPC+SppC are very exciting and important in parallel to ILC, as future high energy accelerator programs High energy physics committee is booming with these projects and programs, especially for young generations who will continue to live and enrich the extraordinary high energy physics culture in 21th century Circular colliders’ beam dynamics and technologies are arrived at a good time to boom together with linear colliders, both are great heritages of high energy physics community, which are worthwhile to be preserve and to be developed

Summary (2) Future large collider projects are all of the nature international collaborations, both in design/construction and operation, and are for the community and by the community Each country, region, and the community’s efforts to probe and bridging economical resources are positive and vital to the sustainable development of the community Collaborations between institutions, programs and projects are vital for all, especially FCC, CEPC/SppC, and ILC. China HEP is open to the world for the participation and joint development

Thank you for your attention