31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.

Slides:



Advertisements
Similar presentations
17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
Advertisements

Calice Collab., Kobe, 12-May-2007Nige Watson / Birmingham (My) Clarification of “CALICE Notes”  CALICE guidelines for results to be presented at conferences,
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
ATLAS Authorship Policy R. Voss Physics Department, CERN IUPAP C11 ICHEP’04, Beijing, China, August 18, 2004.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
The collaboration has been created in 2002 for 5 years > Developpment of the software for PFA > Design, construction of prototype to test with beam the.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CLICdp news -- CLICdp 2-day meeting June 10 th Lucie Linssen, CLICdp, 2-day meeting, June 10th
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Discussion session José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Final CALICE OsC meeting: Status and summary of project
Introductory remarks David Ward
SiD Calorimeter R&D Collaboration
CALICE News The 2007 beam tests have started!
(My personal) CALICE Report
S4 will be a “big” Collaboration:
ECAL project in the future 2-3 years
Report from the Technical Board
ScECAL+AHCAL+TCMT Combined Beam FNAL
Technical Board – DCAL Software
Rick Salcido Northern Illinois University For CALICE Collaboration
CALICE: Major Items Since September
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration

31 May 2007LCWS R&D Review - Summary2 We believe an evaluation of different calorimeter technologies is essential to make the right choices We believe this needs to be done in a systematic and coordinated manner To provide meaningful comparisons To make the most efficient use of scarce resources We have planned a major program of R&D to achieve this aim This is starting to produce results First public presentations at this workshop We estimate ~3 years to complete the full program This will produce results in time for the detector EDRs CALICE Summary

31 May 2007LCWS R&D Review - Summary3 Schedule Funding uncertainties make scheduling difficult but… Physics prototypes beam tests ECAL, AHCAL, TCMT: CERN Jul-Aug 2007 ECAL, AHCAL, TCMT: FNAL Q ScECAL, AHCAL, TCMT: FNAL Q ECAL, DHCAL, TCMT: FNAL Q onwards Technical prototypes ECAL, AHCAL: beam tests mid DHCAL: assembly and beam tests Analysis of data, understanding operational issues and incorporating results into detector optimisation will take time after the hardware programme is complete Mainly 2007/8 Mainly 2009/10

31 May 2007LCWS R&D Review - Summary4 Prototypes The CERN system is equivalent to an experiment in its own right E.g. ECAL had more channels than BaBar’s; data rate was higher than H1 We believe we have shown we have a critical mass of people We ran continuous shifts with > 90% detector uptime throughout the run We believe we have demonstrated we can deliver Around 100M events have been taken and results are appearing The main issue is; can we achieve this schedule?

31 May 2007LCWS R&D Review - Summary5 We have a well-defined collaboration structure Spokesperson (J.-C.Brient) Steering Board (chair J.Repond): one member per country Technical Board (chair J.Yu): subsystem leaders Speakers Bureau (chair D.Ward): representatives from analysis groups The collaboration has an MoU agreed by all institutes There are regular technical reviews of the subsystems There are regulations and guidelines for talks and (future) papers There is a clear management structure in place We believe we have demonstrated it to be working We believe we have the expertise to direct the work We can organise ourselves and know the issues intimately With apologies to Churchill… Given the tools, we will finish the job Management