R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out https://indico.cern.ch/category/6386/ 1v1.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Injection test? Mike Lamont For initial discussion.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC status Monday 22 nd June 2015 Coordination: Wolfgang Hofle, Mike Lamont.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
R.Giachino / M.Albert Be/op 30 th March 2015 LHC Machine check out 1v1.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Jan Uythoven For discussion
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary of week 7 Hardware Commissioning:
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Thursday morning – optics correction
Yesterday Issue of injection kicker not pulsing:
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test.
Planning at 5 o’clock meeting Friday
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Planning for the week MO M P
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Can operation put the MPS in a unsafe state?
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Presentation transcript:

R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1

S 34 ● S 56 RB.A56 Circuit QPS communication problem – Reset B16R5, the crate is saturated ● Piquet called In ● Needed access ● Intervention in Pt5 finished. ● QPS in C16.R5 back to normal. 2 U_DIODE = -15 V U_MAG = -15 V

Cryo ● Cryo S34 conditions back at 2:00 pm ● All points ok 3 Cryo Maintain 78

Machine Precycle ● Precycle all sectors first time !! ● Machine at injection 4

Preparing for TL tests ● TDI in IP2 and IP8 closed: – Left jaw parallel (LU and LD) to 8 mm, – Right jaw parallel (RU and RD) to 4.5 mm – LD to 3.6 mm, RD to 0.1 mm ● TL’s handshake 5

Extraction to TED ● Extraction to downstream TED. – The extraction failed when the SPS was on LHC frequency – Succeeds when the SPS was on local frequency. ● Beam extracted downstream TED’s 6 Problem fixed by Thomas

Machine check & Beam Permit Loop ● Opening vacuum valves with the sequence ● Opening valves manually around kickers 7 Beam Permit Loop Closed

Synchronisation ● Synchronisation check ● Disable injection kicker ● TCTPV4L2.B1 was too closed 8 Beam on TDI

Synchronisation ● TCTPV.4L2.B1 at parking position 9

Machine Preparation ● TI2 and TI8 TEDs back IN ● Collimators set for threading ● VVGS closed for interlock propagation test ● Interlock was correctly propagated to EXT1 BIC of SPS 10

LBDS MP tests ● LBDS machine protection tests ● LBDS commissioning test 5.1 for B1. ● LBDS commissioning test 5.1 for B2. ● LBDS commissioning test 4.2 for B1/B2. 11 N.Magnin & Jorg

Preparation BI ● BBQ and BFSU Energies are now all reported correctly 12

Tentative plan ● Friday Sector 34 circuits operational ● Beam loop closed Thursday evening ● LBDS –BIS machine protection tests ● Machine Cycle all sectors together ● Beam to downstream TED ● Check synchronization LHC-Injectors chain ● First beam not before Sunday morning 13

Plan ● For B1 & B2: ● Bring the beam to the TDI, ● Open TDI and go to next point blocked by collimator, ● Steer the trajectory, ● Open collimator, ● Repeat point by point until the beam makes one turn. ● When one turn is established try to increase the number of turns (better trajectory, move tunes etc...) until >= 40 turns. ● Try to capture the beam with the RF. 14

Plan ● When both beams circulate, check out the key instrumentation, starting with orbit and tune. ● Improve the orbit correction, steer back the transfer lines ● Measure chromaticity and dispersion. ● Try out the other instruments ● Over-night: ● Continue the commissioning and testing. ● Polarity checks of orbit correctors and tune trim circuits. 15

Tentative Plan ● Monday ● RF work: delays, loops etc ● Continue BI commissioning, including timing. ● Clean-up orbit. ● First quick test of the orbit, tune and radial feedbacks. ● Evening/night ● Splashes ● Polarities continued 16

Beams on the downstream TED’s 17