STEPS TO COMPLETING THE SRF LOAN PROCESS

Slides:



Advertisements
Similar presentations
Sales Project Reports (Student Activity Reports) Activity Purpose Statement and Budget Sales Project Report for Distribution Purchase Request Form CPS.
Advertisements

Contamination Cleanup Grant Program Implementation Workshop.
Local Agency Bonds. Issuing a Bond  The municipality decides they need an influx of cash and a bond issue is how they decide to get it.  Working with.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
COMMUNITY ENHANCEMENT AND ECONOMIC DEVELOPMENT FUND (CEED PROGRAM) A HUD SECTION 108 LOAN PROGRAM Indiana Office of Community and Rural Affairs 2014 Regional.
How to Use the Clean Water State Revolving Fund SRF Overview Planning Intended Use Plan Application Environmental Review Bidding and Construction Construction.
By Law Offices of Wayne D. Gerhold One Gateway Center, 18 th Floor Pittsburgh, PA (412)
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
1 U.S. EPA State Revolving Fund: Providing Affordable Financing George Ames U.S. EPA IADF Conference on Financing Municipalities and Sub-National Governments,
KENTUCKY INFRASTRUCTURE AUTHORITY Office of the Governor Governor’s Office for Local Development 1024 Capital Center Drive, Suite 340 Frankfort, Kentucky.
ARRA Training Accountability and Reporting Water Quality/Drinking Water Program Overview OCTOBER 05, 2009 Trenton, New Jersey NJ Environmental Infrastructure.
Helping Massachusetts Municipalities Create a Greener Energy Future Compliance under the Energy Efficiency and Conservation Block Grant (EECBG) Program.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
MassDEP Municipal Services
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
Procurement and Food Service Contracts Pages
Bob Schneider & Kelly Green Michigan Department of Environmental Quality Revolving Loan Section.
STEPS TO COMPLETING THE SRF LOAN PROCESS June 2011.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Presentation to the Oversight Board Santa Clara County Auditor-Controller 1.
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
Understanding WIFA Presented by: Steve Wene Moyes Sellers & Hendricks.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Redevelopment Grant Program Implementation Workshop Spring 2010.
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
Like a Home Mortgage Refinancing:. Issued to construct HS 2004 Bonds (mature 2013 – 2029) 4.8% average interest rate Call Date Bonds.
Guidelines for Leases and Maintenance Agreements Procure to Pay Services Updated 2/2/2012.
Water Resource Restoration Sponsored Projects Approval Process Sponsored Projects Overview Project Initiation Technical Review Bidding and Construction.
2004 REGULAR LEGISLATIVE SESSION Prepared by: Office of Contractual Review.
KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August , 2011.
How to Use the Drinking Water State Revolving Fund SRF Overview Planning Intended Use Plan Application Environmental Review Bidding and Construction Construction.
1 The American Recovery and Reinvestment Act of 2009 (ARRA) California Department of Public Health Safe Drinking Water State Revolving Fund.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
BRP Program Compliance and Reporting November 18, 2015.
Welcome! February 10, Presented by: Steve Dunk (Public Works Board) Cathy Brockmann (Contracts Administration Unit) 2.
OPERATING ISSUES FOR MUNICIPAL AFFORDABLE HOUSING TRUSTS
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
Office of Procurement Services.  Vendor Application Website: 
Stockton University Purchasing and Grants 11/4/15.
BASIC BUDGET CONCEPTS By Kenneth Kelly June 2008.
Contract Compliance Training. Department Personnel Office of the General Counsel (OGC) Mario K. Castillo General Counsel John Guest Deputy General Counsel.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
PTA Treasurer Ensure the unit’s financial records are audited according to the bylaws before assuming his or her duties; Ensure the filing of the unit’s.
Contract Compliance Training
Local Agency Bonds.
Becky Sabie – Program Coordinator
County Highway Accountant’s Conference 2015
Administration of a FIDIC Contract - Award to Commencement -
Texas Military Preparedness Commission
Contract Compliance Training
Texas Military Preparedness Commission
State Aid Construction
WGFOA Spring Conference Egg Harbor, WI April 20, 2017
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Completing the State Aid Payment Request
Qualified Zone Academy Bonds (QZABs): An Introduction
ACEC Environmental Business &
Working Session on American Iron and Steel (AIS) Requirements for the Clean Water and Drinking Water State Revolving Funds WWEMA 109th Annual Meeting.
Sheri Bozic, Director Department of Planning & Development
EFC FUNDING OPPORTUNITIES
State Aid Construction
Bond Basics Bradley D. Viegut, Director / Fax.
A Presentation to: Wisconsin Government Finance Officers Association
Recognized Obligation Payment Schedule (ROPS) Certification Process
Dollars and Cents: Ways to Save and be More Resourceful
State Revolving Fund Loan Program
Presentation transcript:

STEPS TO COMPLETING THE SRF LOAN PROCESS April 2015 Massachusetts Department of Environmental Protection 2015 Borrower Presentation

Heather Saxelby O’Donnell Sue Perez Nate Keenan Heather Saxelby O’Donnell Steven McCurdy Joe Delaney 2015 Borrower Presentation

The State Revolving Fund is an Intergovernmental Partnership 2015 Borrower Presentation

Steps to Financing Intended Use Plan - Done Local Authorization by June 30, 2015 Loan Application to MassDEP by Oct. 15, 2015 Project Approval Certificate - MassDEP Loan Commitment from MCWT Procurement Process - Authorization to Award - MassDEP Project Regulatory Agreement - MassDEP Financing Agreement - MCWT Loan Closing- MCWT Short Term Loans (Interim Loans) Permanent Loans 2015 Borrower Presentation

2015 Borrower Presentation

Local Authorization Town Meeting/City Council Vote: Must be voted by June 30, 2015 General Obligation Pledged as Security Authorization to Borrow Appropriation Make sure you ask for enough. Include: Eligible and ineligible costs Construction Management Fees Police Details Inflation 2015 Borrower Presentation

Borrower Loan Application Due to MassDEP October 15, 2015 – Can be submitted earlier Loan Application has three parts: Application Information - Authorized Representative, Loan Appropriation, etc. Project Requirements - Plans and Specifications, Costs, Schedule, etc. Supplemental Requirements - Permits, Planning, Professional Service Agreement, etc. 2015 Borrower Presentation

MassDEP Project Approval Certificate PAC Issued by MassDEP to MCWT A copy is sent to the Borrower PAC certified that the project eligibility, costs and lists conditions 2015 Borrower Presentation

Loan Commitment Package Board of Trustees approval vote creates Commitment to Borrower Board meets on the first Wednesday of every month The Board consists of: State Treasurer Deborah Goldberg, Chair Secretary of Executive Office for Administration and Finance, Kristen Lepore Commissioner of Department of Environmental Protection, Martin Suuberg The Loan Commitment Package Includes: Loan Commitment Document Requirements Letter Outlining step by step process to close the loan Loan Questionnaire to be filled out by Borrower Borrower needs to: Request Green Light Letter- from local bond counsel Return one (1) signed questionnaire to MCWT 2015 Borrower Presentation

Loan Questionnaire Borrower provides: Updated, accurate information in order for MCWT to comply with the tax code as it applies to tax exempt bonds One (1) completed questionnaire loan process and one (1) verification form before permanent financing Accurate wiring instructions for loan disbursements Please notify MCWT if you change your wiring instructions 2015 Borrower Presentation

Green Light Letter and Bond Borrower’s Bond Counsel prepares: “Green Light Letter,” which is sent to MCWT certifying that the local vote is legal Local bond and Interim Loan Note for delivery to the MCWT for interim and permanent loan MCWT does not finance local costs for bond counsel 2015 Borrower Presentation

Borrower Procurement Process Before bidding, MassDEP must give “Permission to Advertise” Bid Specifications and Contracts must be approved by MassDEP After bid opening, MassDEP Civil Rights Section reviews and approves Disadvantaged Business Enterprise (DBE) participation MassDEP reviews bid results and issues “Authorization to Award” Please note – for projects receiving principal forgiveness (Environmental Justice communities and renewable energy projects), contracts must be awarded by April 30, 2016 to be eligible. 2015 Borrower Presentation

MassDEP Project Regulatory Agreement (PRA) Contract between MassDEP and the Borrower Establishes MassDEP control over project Outlines project eligibility and funding Establishes disbursement procedures Outlines the loan closeout process Includes the legal requirements of the Borrower Discusses project defaults and how to remedy 2015 Borrower Presentation

Financing Agreement As with the Project Approval Certificate, the Financing Agreement is voted at a Board of Trustees meeting. The Financing Agreement is: Contract between MCWT and the Borrower Outlines MCWT and Borrower’s responsibilities State how a loan default can occur and how to cure the default Once the Financing Agreement is approved, the questionnaire is returned and the green light is received, the Borrower will receive a package containing: Two (2) copies of the PRA Two (2) copies of the Financing Agreement Sign and Return to MCWT: One (1) copy of the PRA One (1) copy of the Financing Agreement 2015 Borrower Presentation

Interim Financing Preferable to BANs Lower interest rate Interest rate = ½ MMDT Index (currently 0.09%) Loan origination fee of $500-$1000 Bond counsel issues interim loan note to MCWT Is permanently financed usually within one year Most borrowers use interim financing If you don’t use interim financing you won’t receive any disbursements until the Trust goes to market for permanent financing. 2015 Borrower Presentation

Loan Terms and Fees *Rate calculated at time of bond sale, estimated between 2.4-2.9% ** To be determined at time of bond sale to offset costs 2015 Borrower Presentation

Disbursements Proceeds of the loan are generally disbursed to the Borrower monthly “Payment requisition” is completed by the Borrower and forwarded to MassDEP with the appropriate documentation (receipts, invoices, etc.) MassDEP reviews the request and approves eligible costs MassDEP forwards the request to the Trust MCWT wires to Borrowers every Thursday with funds often available the next day 2015 Borrower Presentation

Sample Disbursement Loan Number and MassDEP Project Number Disbursement Number Total Interim Loan Amount Payment Request Amount Signed and dated by Borrower Approval Signature from MassDEP 2015 Borrower Presentation

Loan Repayment Payments due July 15 and January 15 MCWT will send an invoice 30 days in advance Invoice will include wiring instructions Debt Service Payments Administrative Fee Payments Loan Origination Fee Payment- due at first debt service payment 2015 Borrower Presentation

Debt Service Schedule (Schedule C) 2015 Borrower Presentation

Why borrow from the Trust? Benefits of Using the Trust 2% Loan v. Market Rate What does the 2% rate mean for your community? On an average, a $5 million loan the community would save $738,144 over the life of the loan (using current market rates) Equates to a 40% interest subsidy Savings generated through economy of scale Underwriters fees Financial advisor fees Bond Counsel fees 2015 Borrower Presentation

MassDEP 2015 Project Requirements American Iron and Steel Price Adjustment Clauses Chapter 30 projects (horizontal construction) must include price adjustment clauses for fuel, liquid asphalt and portland cement in CIP concrete P&S checklist has suggested language for contracts Clean Water Act Amendments - 2014 Made Davis Bacon prevailing wage requirements and American Iron and Steel permanent for the Clean Water program – both also continue to be applicable to Drinking Water program Clean Water projects on 2016 IUP and forward must have asset management plans and must provide cost and effectiveness certifications. 2015 Borrower Presentation

American Iron and Steel (AIS) None of the funds made available by a State revolving loan fund shall be used for the construction, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States. ‘‘Iron and steel products’’ means the following products made primarily (> 50% by cost) of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. 2015 Borrower Presentation

AIS Applicability Applicable to all DW and CW construction projects except for non-point source projects A number of items are specifically exempted such as pumps, motors and electrical equipment among others EPA may issue site specific waivers if iron and steel products are not produced in the US in sufficient quantity or quality Waivers must be submitted through the SRF program EPA issued a DeMinimis waiver for small low-cost items that total less than 5% of the material cost with no 1 item totaling 1% of the cost. EPA guidance available in the P&S checklist 2015 Borrower Presentation

AIS Compliance AIS contract language must be included in each contract AIS certification must be provided by manufacturer Records must be maintained on site DeMinimis items must be tracked MassDEP will be reviewing AIS documentation during regular site visits EPA will be reviewing AIS in all 50 states in 2015 2015 Borrower Presentation

Contact Information Financial Sue Perez 617-367-9333 x816 Nate Keenan 617-367-9333 x508 Heather Saxelby O’Donnell 617-367-9333 x584 Program Steve McCurdy 617-292-5779 Joe Delaney 617-292-5808 2015 Borrower Presentation