LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
LHC “progress” Wednesday 29 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday March 4th 08h32: Access for beam dump system.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Friday morning 10:30 Optics measurements and corrections.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Programme for Friday 9 July
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 10th December - morning
Presentation transcript:

LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle

Plan Wednesday 29 th April Interlock BPMs in IR6, set-up & validation of intensity range and with bumps RF Long. Blow-up Commissioning (smooth algorithm) ULO steering ULO scan at 450 GeV with cold beam screen Loss maps and collimation checks at 450 GeV Ramp with 2 probes / per beam, loss maps at 6.5 TeV, MUFO check Ramp with 1 nominal per beam Revisit interlocked BPMs

Timeline (1) 7:00 Intensity scraping tests for Interlock BPMs in IR6 9:34 cryo starts cooling down BS in 15R8 9:40 SPS MPS tripped (door) 9:56 SPS MPS tripped again (cooling BA1) 11:12 setting-up of bump for ULO 12:11 de-bunching beam 2 13:38 Long. Blow-up Commissioning starts 13:38 cryo informs that beam screen is at nominal temperature 14:10 cryo maintain lost during tests in R6 15:13 cryo turbine point 8 lost & saved (4x during afternoon/night), 2x transparent, piquet changed cable at 4 th time

Timeline (2) 17:24 Quench of RQ4.R5 due to bad temperature regulation 20:59 Pre-cycle started 21:55 Beam back 23:02 Collimation loss maps with ADT 23:36 cryo point 8, turbines 00:42 start of partial ULO Scan 01:37 SIS interlock dumped (triplet motors in point 5) 01:40 cryo lost in point 8, ML8 (piquet called to change cable) 04:52 pre-cycle MSL8 06:00 beam back 06:15 Injection handshake with experiments (dip) 06:41 mismatch of functions in prepare for ramp (Fidel)

Cardiogram last 24 h not necessarily tracking the faults that stop beam SPS MPS cryo turbine point 8cryo RQ4.R5 dip all IPQs pre-cycled

BPMSX/I Tests Summary of intensity scrapping tests of interlocked BPMSX/I channels: B1 and B2 interlock channels in high sensitivity mode trigger the interlock system at intensities 1.5e9 p/bunch. High sensitivity works perfectly with nominal bunches on these channels. In low sensitivity, limits for B1 and B2 BPMSX/I trigger the interlock system at 1.5e10 p/bunch. BE-BI

Interlock BPM – Scraping both one pilot and one nominal to measure the dynamic range of the high and low sensitivity ranges of BPMint – High sensitivity: Beam dumped at 1.5E9, can handle the nominal bunch intensities: Need higher bunch intensity to check where is the upper limit of our dynamic range – Low sensitivity: Beam dumped at 1.5E10 - work up to max bunch intensity (2-3E11) – Testing Beam dump functionalities changing the interlok threshold (bunch counts over 10 and 100 turns) : worked fine – Issue found on BPMint2 crate while doing MPP test with orbit bumps: suspected an hardware issue in VME crate - under investigation – Need to redo the MPP tests as soon as the problem is solved : Keep the BPM interlock masked so far - update later today BE-BI

Intensity Scraping

Long blow-up Summary of tests longitudinal blow-up: Test at 450 GeV finished. The new algorithm pre-distorts the excitation spectrum so that the core of the bunch is hit harder than the tails. Works fine at 450 GeV. We leave it on for next ramp (with pilots). If it fails: Longitudinal blow-up is not necessary to ramp probe  do not arm it BUT the nominal intensity bunch CANNOT be ramped without longitudinal blow-up. It will be unstable sometime in ramp. H. Timko, M. Jaussi, P. Baudrenghien

Longitudinal display clean injection, loops and longitudinal injection error OK

Bunch length H. Timko, M. Jaussi, P. Baudrenghien

Loss maps at 450 GeV We performed a first complete set of loss maps with injection protection devices OUT (as TDI's are not yet aligned) for both beams, comparing the results obtained by using nominal and beam- based beam sizes. This includes off-momentum loss maps. For both types of settings (beam-based vs nominal sizes) the betatron loss maps look good. We will decide which settings have to be used after detailed off-line analysis. Off-momentum loss maps showed that for beam 2 the nominal beams sizes should be used because the beam-based ones have a problem for the TCP. The alignment of this collimator should be re- checked. From the cleaning point of view, the new settings are ok for the injection of up to tens of nominal bunches! S. Redaelli & team

ULO bump The beam reference orbit is now bumped by +1mm in V and -3mm in H at the location 15R8. It is 'invisible' as long as one compares to the reference orbit. The bump has been added as a knob (--> in ramp, squeeze...) such that it can be adjusted easily. It also appears on the reference orbits as overlay bump. J. Wenninger

Aperture scan

For experts to look at Cryo point 8, PLC cable fixed by Piquet SIS dumps, lost communication (2x), once causing beam dump RF loops at injection (2x), occurred once on beam 2, and once on beam 1 (22:34): de-bunching with 1 pilot and 1 nominal (Philippe B.) Incorporation at start of ramp (Fidel, OP procedure) ADT injection oscillation display (ADT team) chirp checks for BBQ (BI) Interlocks in ramp (RF, A. Butterworth) Handshake via dip not working for some experiments, OP requested handshake in wrong beam mode Interlock BPM, to be re-visited today

RF loops ok ? 22:34, de-bunching of beam 1, ok after re-injection with probe of 7x10 9 protons