Lecture(2) Instructor : Dr. Abed Al-Majed Nassar 2009-2010.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

NETLIPSE Infrastructure Project Assessment Tool Stuart Baker, Deputy Director of National Rail Projects Department for Transport, UK Zagreb, November 10,
Planning: Processes and Techniques
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
1 An Introduction to Collaboration Louis Rowitz, PhD Director Mid-America Regional Public Health Leadership Institute.
Development of internal control: methodology and responsibility
1 Module 2: Promoting Compliance with Environmental Law.
Strategic Management in Action Mary Coulter
Planning and Strategic Management
TRM 450 X Research Methodology Spring Semester 2004 Dr. Zongqing Zhou.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Lecture(11) Instructor : Dr. Abed Al-Majed Nassar
IACT901 - Module 1 Planning Theory - Scope & Integration ABRS Hong Kong 2004 Penney McFarlane University of Wollongong.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Planning and Strategic Management
Internal Auditing and Outsourcing
Financing Urban Public Infrastructure
Role and Components of Project Evaluation
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Planning for Economic and Industrial Development Managing Your Update Bruce Hunt Planners Forum 2014.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
1. 2 Learning Objectives To understand: the elements or stages of the strategic management process the different perspectives on strategy development.
Strategic Planning & the Duty to Co-operate Andrew Pritchard Director of Policy & Infrastructure.
Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Planning and Strategic Management Chapter 04.
1 Introduction and Basic Elements of Advocacy. 2 What is advocacy? A systematic approach to changing policies and programs to reflect the needs of individuals.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
CAPACITY BUILDING : LITHUANIA’S EXPERIENCES FROM 10 YEARS OF REFORM Vilnius, Lithuania March, 2007.
1 Delivery Mechanisms and Scoping Joint Response Team - DWAF, SALGA, NT and dplg Using Section 78.
PREPARED BY ASSISTANT PROFESSOR REHAN MASOOD
1 Palestinian Integrated Rural Environmental Protection Plan By Hossam Zaqoot June 2005 European Commission LIFE Third Countries Palestinian National Authority.
Large-scale organisations in context VCE Business Management Unit 3.
Introduction to the Research Framework Work-in-progress Conceptualizing the Criteria to assess ‘appropriateness’ of actions in given ‘national’ circumstances.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Business Responsibility and Sustainability Dr Eshani Beddewela Week 04.
Neighbourhood Planning. Frequently Asked Questions What is Neighbourhood Planning? What can a Neighbourhood Plan do – and what can it not do? What are.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
Environmental Impact Assessment in the Slovak republic.
Feasibility Study.
1 Stakeholders involvement in BDP. 2 ContentsContents MRC & Public Participation History, Policy and Strategy BDP & Stakeholder Involvement – Stakeholders:
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
Evaluation Research Dr. Guerette. Introduction Evaluation Research – Evaluation Research – The purpose is to evaluate the impact of policies The purpose.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
International Federation of Accountants Audit Policy: A Global View Russell Guthrie, Executive Director Dakar, Senegal May 5, 2011.
EU Politics CHAPTER 13: Other Institutions. Outline 1) European Economic and Social Committee (EESC) 2) Committee of the Regions (CoR) 3) European Agencies.
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
Challenge Grant Funding And SB  The Challenge Grant program is authorized by section (4), Florida Statutes, to provide grant funding to.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Neighbourhood Planning training for Parish Councils in Harborough District Session A: Setting a Vision.
Governance and Institutional Arrangements What they have to do with Regional Water Planning (RWP)
BLM Decision Making Process
EVALUATION IN THE PUBLIC SECTOR
Translating political objectives into sound policy proposals
Strategies Achieving our Goals
GCF business model.
Definition of Project and Project Cycle
Strategic Environmental Assessment (SEA)
Presentation transcript:

Lecture(2) Instructor : Dr. Abed Al-Majed Nassar

Planning Sequences Generic Programming and Budgeting

Expected results from Planning Sequences 1 How alternative projects are identified and selected for further examination. 2 How projects prepared at different times by different investigators are compared. 3 How a major project proceeds from preliminary study through construction and operation. 4 What should be the scope of various types of studies and reports. 5 What are the appropriate methodologies to employ to produce the details of the studies and reports.

Basic contexts for planning public works and infrastructure The responsibility for public infrastructure planning, development, implementation, and operations and management, generally rests with an agency that has been granted statutory authority for a particular type of facility or system of facilities. Early planning may be done in a very broad context by state or regional planning organizations, with input from operating agencies. The need for, and the performance of an infrastructure facility may have wide-ranging impacts and involve many persons and organizations. Example

Basic contexts for planning public works and infrastructure The objectives of a project must be viewed from several different standpoints, depending on the nature and extent of the project. Several different contexts may be considered with geographic or political boundaries: global, national, state, and local.

Basic contexts for planning public works and infrastructure Global Issue The global context of a major project, plan, or program of projects may be considered in terms of sustainability or globalization of the economy. National Issue National objectives and concerns are usually expressed in federal legislation, which affects the actions of agencies at all levels of government.

Basic contexts for planning public works and infrastructure State Issue State objectives are generally expressed in legislation paralleling the federal structure, but their financial and regulatory policies may be tailored to the unique requirements within each state. State agencies are often designated as responsible for specific infrastructure facilities. Department of Transportation is responsible for a portion of the highways in the state that are designated by law as state highways. Examples

Basic contexts for planning public works and infrastructure Regional and local Issue Regional and local objectives, like state objectives, may target additional concerns. For the transportation sector.

Basic contexts for planning public works and infrastructure Performance-based planning and the use of outcome-driven performance measures have become increasingly important for public infrastructure projects. Planners must recognize and work within the nested set of stakeholders.

Solid waste Roads Water supply Other Other department Education Other department Public works director Mayor/city manager Region (organization, agencies) State Federal Global Economy

Basic contexts for planning public works and infrastructure There are more than one institution interesting in one infrastructure facility. In Gaza strip there are many institution had an interest in water (Municipality, CMWU, PWA) Example

Basic contexts for planning public works and infrastructure In most cases, decisions to provide public physical infrastructure will be made within the political decision- making process. Political decisions are made through the different funding and regulatory contexts, and through the decision processes of governing entities such as mayors, city councils, county executives, governors, state legislators, and politically appointed agency heads and boards. For any project, the planner must understand the political decision-making process that will govern the implementation of the project.

Disenchantment Uncertainties Confusion Choosing Strategically Today’s Realities Uncertainties Vacillation Inconsistency Pressures Making Progress Joint planning.. Exploring....Investigation Deciding.. Negotiating....Intervening..Turbulence..Competition..Urgency..Complexity..Conflict..Overload Arrangement for Making Policies Arrangement for Making Planes Arrangement for Making Decisions Project plans.. Physical plans.. Financial plans.. Corporate plans.. Operational decisions.. Managerial decisions.. Resources decisions.. Enterpreneural decisions..

SOME IMPORTANT PERSPECTIVES FOR PUBLIC WORKS AND INFRASTRUCTURE 1 Objectives and Values Change over Time. 2 Infrastructure Planning Involves the Concepts of Systems and a Holistic Approach to Installation, Operation, and Management. 3 The Different Infrastructure Systems Need to Be Integrated. 4 Infrastructure Planning Involves Not Only the Provision of the Physical Plant, but Also Its Operation and Management.

5 The Planning of Infrastructure Is Vital to the Economic Future of a Country. 6 The Infrastructure Is Expensive, so the Planning Process Must Be Thorough. 7 Many Different Levels of Government Are Involved. 8 There Is a Need for a Strong National Role in Infrastructure Planning. 9 Infrastructure Planning Is an Interdisciplinary Process. 10 Public Works Planning Methods Are Based on Scientific, Legal, Ethical, Judgmental, and Other Concepts.

11 Many Types of Organizations Employ Infrastructure Planners. 12 A Successful Project Frequently Requires the Support of Elected and Agency Officials. 13 Public Participation in Planning Is Vital. 14 Projects May Have Multiple Purposes and Multiple Objectives. 15 Financial Considerations Are Usually an Important Component of Infrastructure Planning. 16 Many Factors Are Involved in a Successful Project. 17 Planning Should Involve a Systematic and Logical Process.

18 Infrastructure Planning May Involve the Formulation of Alternative Plans to Meet Different Objectives, and a Methodology of Trade-offs to Select an Acceptable Plan. Environmentally Feasible Plans Economically Feasible Plans Financially Feasible Plans Legally Feasible Plans Technically Feasible Plans Institutionally Feasible Plans Politically Feasible Plans Socially Feasible Plans The set of feasible alternatives

19 Planning Objectives and Constraints Should Be Identified and Considered Together. Study authority Problems & opportunities Criteria -Federal interest. -Corps mission -Budget priority - Others Criteria -Federal interest. -Corps mission -Budget priority - Others Continuum of values, idea, concerns, facts, data, etc. “IS it so?” “ Does anyone care?” Public Technical experts Planning objectives Planning constraints

Key Question in the Decision-making Stages of Planning, Implementation, and Evaluation Planning What will it cost to take actions needed to achieve desirable performance, that is, to meet specific objectives, satisfy stated goals, or conform to specific regulations? Develop vision, set goals and objectivesDevelop, adopt performance measures Identify alternatives appropriate actions and select a preferred course (e.g., use benefit-cost analysis) Adopt plan, allocate resources, and implement plan

Key Question in the Decision-making Stages of Planning, Implementation, and Evaluation Implementation How can action best be carried out to achieve desired performance? Set productivity ObjectivesDevelop, adopt, affirm performance measuresIdentify alternative implementation strategies Execute strategy, assess costs and achievements

Key Question in the Decision-making Stages of Planning, Implementation, and Evaluation Evaluation Given that resources were used to take certain actions, are the consequences(outcomes) of these actions consistent with stated and subsequent goals, that is, performance ”adequate” “good” or “otherwise”? Identify, review outcomes of previous actions, plans, policies, regulations. Develop, adopt, affirm performance measures. Measure performance and compare results to goal, objectives, vision t o determine if change in the infrastructure system is warranted Adopt plan, allocate resources, and implement plan