SNS Target Systems Operational Experience and Upgrade Plans T. J. McManamy October 2009 Workshop on Applications of High Intensity Proton Accelerators.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Managed by UT-Battelle for the Department of Energy 3 MW Solid Rotating Target Design T. McManamy F. Gallmeier - Neutronics M. Rennich – Mechanical design.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
ILE, Osaka Concept and preliminary experiment on protection of final optics in wet-wall laser fusion reactor T. Norimatsu, K. Nagai, T. Yamanaka and Y.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy PASI_2012_Flowing_Target_Challenges Challenges for Flowing Targets Bernie Riemer (ORNL) (Jan.
ISIS Second Target Station
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Study of a new high power spallation target concept
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
SNS Target R&D Presented by Mark Wendel Transformative Hadron Beamlines Workshop July 2014 Brookhaven National Laboratory.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
BL1U at TRIUMF UCN Beamline Spallation Target & Remote-Handling System (Aug/2010) L.Lee.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GRAPHITE SUBLIMATION TESTS with Inert Gas Mitigation C. C. Tsai, T. A. Gabriel, J. R.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Beam Instrumentation in Monolith Stephen Molloy PBI Taskforce Leader.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
ORNL is managed by UT-Battelle for the US Department of Energy SNS mercury target fatigue life prediction with Fe-Safe/Verity High Power Targetry Workshop.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
Spallation Neutron Source Tony Gabriel - SID, ORNL/SNS-Retired (Thanks to Phil Ferguson and Mike Dayton)
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Materials – Status Report TAC-10 Yongjoong Lee Group Leader – Materials Target Division November 5, 2014.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
ISIS operational update
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
News and brief overview of Beamline plans for the next few months
Target and Horn status report
EUROnu Beam Window Studies Stress and Cooling Analysis
Experimental equipment Edgar L. Black February 17, 2019
APTM and GRID interface requirement PBIP and PBW
Test Beamline System Requirements and Charge to PDR Committee
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

SNS Target Systems Operational Experience and Upgrade Plans T. J. McManamy October 2009 Workshop on Applications of High Intensity Proton Accelerators October 19-21, 2009 Fermi National Accelerator Laboratory, Batavia, IL, USA

2Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Overview Overall Power and Availability History Target Systems Availability and Operational Issues Proton Beam Window Replacement Target Imaging System Mercury System Development Power Upgrade Planning Second Target Station Planning

3Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Energy and power on target from October 2006 First Target & PBW Replacement

4Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 SNS Performance Relative to Design The “Best” values were not necessarily achieved simultaneously x x

5Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Overall Unscheduled Downtime - FY09 Good availability has been achieved for the Target Systems

6Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Operational Issues The mercury pump required repairs in 2007 to fix a failed gas seal on the shaft and leaking oil seals but has operated well since then The moderator 7.5 kW helium refrigerator was repaired in December 2007 by installing the heat exchanger core in a vertical cold box – This stopped the trend of a loss of capacity with time and allowed 4-5 month run cycles – Recently the problem has reappeared at higher flow rates and is under investigation A cryogenic hydrogen flow problem with the bottom downstream moderator was fixed by installing a flow guide (spring) through the transfer line using a 10 m fiber optic probe from outside the monolith

7Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target & PBW Replacement The first target accumulated 3055 MW hours with an estimated peak damage of 7.5 dpa in the 316L material While up to ~ 10 dpa was considered acceptable, it was replaced early during the July shutdown to avoid unscheduled loss of neutron production during the next run cycle The Inconel 718 Proton Beam Window (PBW) was also replaced during this shutdown with an estimated peak damage of 6. 5 dpa. The PBW replacement was done early to avoid scheduling conflict with other remote handling work planned for the next shutdown. The target and PBW replacement also allowed deployment of a new Target Imaging System (TIS) which could improve estimates of the peak beam intensity on the target

8Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Proton Beam Window Replacement Shielded Cask and Hoist Old PBW during retraction into cask Cooling lines cut prior to removal with long handle tools New PBW with guide can and counterweight being installed

9Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 First target replacement No observed corrosion Internal Boroscope examination in progress ~ 50 mm diameter samples to be cut from target nose around the end of October Beam power on target [kW] Operating hours Hours above power level First Target after removal First Target in 2006

10Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target Operational Experience The first target performed very well – No mercury leak indications in the target or other connections – No water leaks – Inflatable seal to the core vessel worked well and the helium concentration in the vessel was typically maintained at >99.97% – No evidence of any corrosion on the target after removal – Neutronic performance appears consistent with predictions based on moderator performance The second target has accumulated > 400 MW-hrs as of 10/12/09 – The inflatable seal does not appear to be expanding fully, but core vessel helium is being maintained >99.97% using a small helium flow instead of vacuum for the interstitial region

11Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Source seems to be performing as predicted Neutron flux at sample location Bottom downstream coupled hydrogen moderator (post Jan09 repair) Includes guide modeling in McStas and MCNPX

12Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target Lifetime Considerations The first target operated for >1700 hours at or above 600 kW and up to 800 kW without a failure R&D by the SNS and J-PARC teams has shown that the target wall is likely to experience pitting damage by the collapse of cavitation bubbles – This has been shown for short pulse (< 1  second ) operation – The rate of damage is sensitive to beam power ( P 4 ?) A target imaging system (TIS) is being developed to give improved measurement of the beam profile which could improved beam control and target lifetime Mitigation methods using small distributed bubbles or bubble walls near the surface are being developed by the R&D programs Test plate from 2008 WNR experiment 100 pulses with proton flux equivalent to 2.7 MW SNS

13Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target Imaging System System Deployed during July 2009 Shutdown Parabolic mirror 25 mm ID viewport turning mirror and focusing elements Proton Beam Window

14Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Second PBW view from downstream side Thermocouples for Halo monitoring & Beam Centering Parabolic diamond turned aluminum mirror Cylindrical double wall Inconel 718 window 115 mm

15Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Imaging Fiber routing Radiation Hard Fiber 38 ft overall length 10,000 fibers, ~1 mm diameter Camera located outside of shutter drive equipment room Standard camera with GigE interface used Camera mounted outside shielding

16Managed by UT-Battelle for the Department of Energy Flame Spray (Al 2 O % CrO) development Torch Drives Exhaust Sensor Air jet on each side Portable Flame Spray Coating and Ventilation System Developed by the Center for Thermal Spray Research ( SUNY at Stony Brook) Heat shield and mask over target

17Managed by UT-Battelle for the Department of Energy Completed Target Coating Nominal Thickness 0.25 mm, 200mm x 70 mm pattern Mockup testing established parameters and showed substrate temperatures were < 120 C with air cooling Pattern to scale image with beam

18Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 False color target images at 800 kW Case 1: image with potential gas scintillation Case 2: image with shutter delayed by 4 microseconds to gate out suspected gas Data analysis of profiles in progress Initial results similar to previous projections No beam tilt ~10% higher peaking than previous estimates

19Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 SNS R&D on cavitation damage mitigation began in 2001 The program includes experimental, simulation and theoretical activities – Five full time staff members at ORNL and ~12 part time contributors (Bernie Riemer is the team leader) – Contributions from universities and industries – Collaborations with JPARC and RAL Goal is to develop technologies to mitigate damage such that it is not the life limiting mechanism for the target Key points: – The damage erosion rate is strongly sensitive to beam power … perhaps as much as P 4 – Target vessel materials and surface protecting treatments have limited potential to significantly extend the life and power capacity of the vessel – Power threshold for damage to begin is uncertain for SNS

20Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Window Flow Vulnerability Test Loop (WFVTL) experiments (WNR 2008) In-beam experiment examined narrow mercury channel damage under conditions more prototypic to SNS – Previous in-beam test results for channel damage indicated this region is especially vulnerable Investigated damage reduction vs. flow velocity – Previous in-beam test indicated damage reduced by flow Sought confirmation that water in channel is benign Channel flow Test surfaces (3 each location) SNS mercury vessel WFVTL module section

21Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 WFVTL target module and mercury loop Hg length: 325 mm Variable speed centrifugal pump employed for channel flow speeds for up to 7 m/s – Only ca. 4.3 m/s achieved Test targets connected to loop via flexible hoses

22Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, Damage patterns - Front inside plate – Channel side

23Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Next WNR Hg target experiment is planned for late 2010 This will investigate small gas bubble mitigation with improved bubblers Flowing mercury system required Will be done in close collaboration with JPARC team Pump system Bubblers & damage test plates

24Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target Upgrade Experience with targets at or above 1 MW is needed to determine if gas mitigation methods are needed – Post Irradiation Examination (PIE) will be done on samples from the nose region of the first target (which did not fail) – Subsequent Targets will be run until mercury is detected in the interstitial region (or to 10 dpa) and PIE performed to locate the leaking region and remove samples – At 1 MW with the nominal beam profile, 10 dpa would be reached after 5000 hours of operation If cavitation damage does not limit lifetimes unacceptably, structural analysis of the current target design indicates it can operate at 1.4 MW

25Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 SNS Power Upgrade Plan Power upgrade plan has been revised – Formerly, Power Upgrade Project (PUP) doubled SNS power – DOE directed us to restructure the elements of the PUP Proton energy increase to 1.3 GeV (30%) forms the new PUP Beam current increase (60%) and target improvements will be accomplished through R&D and Accelerator Improvement Projects (AIPs) Conceptual design for PUP completed, and R&D underway – BES review held in August 2008 and Critical Decision-1 (start preliminary design) approved in Jan 2009 Net result of PUP + R&D + AIPs will be a doubling of the SNS beam power by 2016

26Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 SNS Second Target Station (STS) Scope of STS includes design, build, install, test, and commission a second target station at SNS consisting of: – New spallation target and supporting systems – Extended SNS accelerator systems – Conventional support buildings – Initial neutron beam instruments Mission Need Critical Decision-0 approved in January 2009! – Current plan: Start construction project in 2012; complete in 2019

27Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Two STS Target Options Mercury Target – Similar configuration as the first SNS target station. Mercury process installed in a shielded service bay downstream of the monolith. Moderators and reflector mounted in a vertically accessed plug. Target /Moderator/Reflector optimized to improve cold neutron production Process equipment optimized based on FTS experience. Cavitation damage is not likely to be an issue with long pulse operation Rotating Target Target, moderators and reflectors mounted in a single large vertical plug Target driven with assembly mounted 3.5 meters above the disk.

28Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Solid Rotating Target Option for STS A preconceptual design study for a 3 MW tantalum clad tungsten target with water cooling which gave promising results 1 – Target lifetime of ~ 5 years for 10 dpa on the shell window – Equal or better neutronic performance compared to a mercury target – Greatly reduced remote handling requirements compared to a mercury target A mockup of the drive unit including seals and bearings was fabricated and tested for > 1000 hrs A 4 meter shaft and 1.2 m diameter mockup target has been fabricated by the ESS-Bilbao team as part of a collaboration and will be tested within 6 months with the ORNL drive unit 1.

29Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Target Plug Configuration Core Vessel Target Disk Moderator/Reflector Proton Beam Neutron Beam Ports Cooling Water Pipe Chase Rotating Couplings Fixed Shielding Shield Plug Assemblies Drive/Target Joint

30Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Rotating Target Drive Configuration A Prototype drive module has been built and successfully tested for > 1000 h. Drive designed to be removed independently of the target module Testing with shaft and target disk planned for FY10

31Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 STS –Rotating Target Development Recent power upgrade accelerator studies have indicated that 1.5 MW is a likely upper bound for power on the second target station for reasonable costs with ~2 MW on the first target station Rotating Target design studies have started based on this power level with long pulse operation at 20 Hz and 1.3 GeV, consistent with the Power Upgrade Planning and Accelerator Improvement Projects Design Studies – Optimize target neutronic & thermal hydraulic design for 1.5 MW – Develop safety basis for passive decay heat removal – Develop integrated monolith and hot cell structures

32Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Configuration Studies Target Parameters 1.2 m diameter ~60 mm W height ~ 12 mm steel shell ~ 1.5 mm flow channel 1mm Ta clad Tungsten ~30 RPM Gaussian or flat beam profile

33Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Rotating target vacuum operation The proton beam window (PBW) is a credited engineering boundary for containing mercury in case of target failure For a rotating target with water cooling an option under evaluation is eliminating the PBW and operating the target in vacuum Ferrofluidic seals on the shaft are under consideration – 10 4 Gray/year estimated dose should be acceptable based on testing at Riken to 1.8 x 10 5 Gy Improved neutronic performance and reduced remote handling maintenance are expected from this change

34Managed by UT-Battelle for the U.S. Department of Energy AHIP Workshop – Oct, 2009 Summary SNS Target Systems are achieving good availability (>99%) The mercury loop and first target performed well R&D is proceeding on cavitation damage mitigation methods which could be needed at higher power The first target and proton beam window replacements have been successfully accomplished with a lot of “lessons learned.” The Power Upgrade Project and Accelerator Improvement Projects are projected to double the SNS power by 2016 Conceptual design work has started for the Second Target Station with mercury and rotating target options under consideration