Radiation Physics Beam Tests J. Bauer, J. Liu, L. Nicolas, S. Rokni, M. Santana ESTB Workshop 2011 March 17, 2011.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Energy deposition and neutron background studies for a low energy proton therapy facility Roxana Rata*, Roger Barlow* * International Institute for Accelerator.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Discussion and Conclusions C. Hast and M. Pivi ESTB Workshop.
Test of the SSD Electronics for the STAR HFT Upgrade Howard Matis - LBNL 1SLAC ESTB Workshop – March 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
R.M. Jones (University of Manchester/Cockcroft Inst.) on behalf of CLIC Collaboration., ESTB Workshop, SLAC, 17 th March Collimator Wakefield Measurements.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
Design on Target and Moderator of X- band Compact Electron Linac Neutron Source for Short Pulsed Neutrons Kazuhiro Tagi.
Discussion session Carsten Hast, Mauro Pivi SLAC.
1 A.I.Ryazanov, E.V.Semenov and A.Ferrari DPA calculations in irradiated graphite collimator materials under 7 TeV and 450 GeV proton beams ,
Chalmers University of Technology, Sweden
AS Diagnostic Collaboration Mark Boland
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
ELI-NP: the way ahead, March Anna Ferrari An overview of the shielding problems around high energy laser-accelerated beams Anna Ferrari Institute.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
Plans for Radiation Damage Studies for Si Diode Sensors Subject to 1 GRaD Doses SLAC Testbeam Workshop August
Low Emittance RF Gun Developments for PAL-XFEL
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
The T506 Experiment: Electromagnetically-Induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
Radiation damage calculation in PHITS
VIEW on RAD HARDNESS TESTS of STS FEE IN MEPHI. Simakov A.B. – Head of “Special Microelectronics” Lab.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
1 Authored by Jefferson Science Associates, LLC under DOE Contract # DE-AC05-06OR23177P. Degtiarenko 12/13/2009 GEANT3/4 Simulations for Radiation Budget.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Initial Results from the SLAC ESTB T-506 Irradiation Study International Workshop on Future Linear Colliders University of Tokyo, November 2013 Bruce.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Plans for Radiation Damage Studies for Si Diode Sensors Subject to GRaD Doses International Linear Collider Workshop University of Texas at Arlington October.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS2 Bulk Shielding calculations Methodology P.K. Job Radiation Physicist Peer Review 2007 March 27, 2007.
FLUKA Meeting Milan Jul 2010 Work in the frame of the LHC Phase II Upgrade Previous work was dedicated to the study of the.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
An introduction Luisella Lari On behalf of the FLUKA collaboration CAoPAC: Computer-Aided Optimization of Particle Accelerator Workshop March 2015.
Radiation Shielding Assessment for MuCool Experimental Enclosure C. Johnstone 1), I. Rakhno 2) 1) Fermi National Accelerator Laboratory, Batavia, Illinois.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
ASW August 12, 2008 Impact of amended 10CFR835 on neutron calculations and measurements at high energy electron accelerators A. Fassò SLAC, Radiation Protection.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
Iowa Test Plans for ESTB B. Bilki, Y. Onel University Of Iowa.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
The T506 Experiment: Electromagnetically-induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Crystal Channeling Radiation and Volume Reflection Experiments at SLAC Robert Noble, Andrei Seryi, Jim Spencer, Gennady Stupakov SLAC National Accelerator.
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Plans for Radiation Damage Studies for Si Diode Sensors Subject to 1 GRaD Doses SLAC Testbeam Workshop March
“hot spots” SIS100 internal beam dump Super-FRS production target
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
Inter-comparison of Particle production (2)
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
A summary of world-wide test beam facilities
End Station Test Beam (ESTB) at SLAC
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Experiments on CSR Effects at CTF II
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
LCLS Radiological Considerations Sayed H. Rokni, SLAC April 24, 2002
FACET Accelerator Overview
T-489: Induced Activity and Residual Dose Rates
IPBI-TN R. Arnold (with help from T. Fieguth)
Low Energy Electron-Ion Collision
Presentation transcript:

Radiation Physics Beam Tests J. Bauer, J. Liu, L. Nicolas, S. Rokni, M. Santana ESTB Workshop 2011 March 17, 2011

Introduction -RP has been a user of primary and secondary beams at SLAC test beam facilities (FFTB, ESA). Last experiments were T489, T493 -RP also conducted experiments at other labs, e.g. CERN (CERF) and PAL (PHERF) -Previous collaborations with KEK, PAL, CERN and Tsinghua -The main purpose is benchmarking of Monte Carlo codes that are used in the design/optimization of facilities (personal and environmental radiation protection) 2 ESTB Workshop 2011, March 17, 2011

Recent related research examples (I) Irradiation experiment T489 (28 GeV) at ESA. Benchmarking of activation and residual dose rates 3 ESTB Workshop 2011, March 17, 2011

Recent related research examples (II) Irradiation experiment (2.5 GeV) at PHERF in Pohang Accelerator Laboratory (S. Korea) to study activation of environmental samples and benchmark FLUKA Monte Carlo intra-nuclear cascade code. Analysis is under way. Further experiments seem necessary to better understand possible FLUKA underestimation of 3 H generation as well as of some other radio-isotopes 4 ESTB Workshop 2011, March 17, 2011

Areas of interest -Activation and damage measurements -Activation of accelerator components and environmental samples -Damage to electronics and magnets -Shielding measurements: attenuation of muons, neutrons, etc -Measurements of radiation source terms: -Photomuon production: Crucial for shielding of HE e- beams at zero degree angles (e.g. LCLS) -Neutron spectra measurements at HE (TOF) -Photonuclear production, angular spectra. 5 ESTB Workshop 2011, March 17, 2011

3 experiments in 3 years -Activation and damage measurements -Activation of accelerator components and environmental samples -Damage to electronics and magnets -Shielding measurements: attenuation of muons, neutrons, etc -Measurements of radiation source terms: -Photomuon production: Crucial for shielding of HE e- beams at zero degree angles (e.g. LCLS) -Neutron spectra measurements at HE (TOF) -Photonuclear production, angular spectra ESTB Workshop 2011, March 17, 2011

1) Activation & damage experiment Beam parametersValueComments Particle Type e- Energy 4.0 GeV, 13 GeV Rep Rate Total: 1E16 e- Preferably ~30 W Charge per pulse Energy Spread Bunch length rms Beam spot size, x-y Known within 5 % Others (emittance, …) Total charge known within 2 % LogisticsRequirements Space requirements (H x W x L) 5 m width x 5 m length Duration of Test and Shift Utilization 1 week Desired Calendar Dates Q ESTB Workshop 2011, March 17, 2011

2) Muon production & shielding Beam parametersValueComments Particle Type e- Energy 4 GeV, 13 GeV Rep Rate Max available Charge per pulse Max available Energy Spread Known within 5 % Bunch length rms Beam spot size, x-y Known within 5 % Others (emittance, …) Total charge known within 2 % LogisticsRequirements Space requirements (H x W x L) 20 m length Duration of Test and Shift Utilization 10 days Desired Calendar Dates Q ESTB Workshop 2011, March 17, 2011

3) Photo-neutron measurements Beam parametersValueComments Particle Type e- Energy100 MeV, 4 GeV, 10 GeV Rep Rate Hz Charge per pulseMax availableMonitored Energy Spread Bunch length rms Beam spot size, x-y Others (emittance, …)Total charge known within 2% LogisticsRequirements Space requirements (H x W x L)  m x 10 m x 10 m Duration of Test and Shift Utilization 2 weeks Desired Calendar Dates Q ESTB Workshop 2011, March 17, 2011