Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.

Slides:



Advertisements
Similar presentations
Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
Advertisements

Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Accelerated Post-Fire Flood Analyses Hydraulics URS Group Inc ASFPM National Flood Conference May 19, 2010.
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
Update on Use of Hazus for FEMA Risk MAP Flood Risk Products Shane Parson – RAMPP PTS (URS)
Update on Hazus AAL Study and Data
3-D Flood Risk Visualization Beth Norton December 21, 2011.
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Northwest Florida Water Management District Monday, August 22, 2011.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
1 Floodplain Management SESSION 15 Risks to Human Settlements What Are Hazards? Prepared By Rod Emmer CFM, PhD Larry Larson, CFM, PE.
HAZUS ®MH Coastal Flood Hazard Analysis FATIH C. DOGAN ABS CONSULTING.
1 A GIS-Based Flood Inundation Mapping and Analysis Pilot Project Indiana GIS Conference February 19-20, 2008 John Buechler, The Polis Center Moon Kim,
Idaho Risk MAP Activities Ryan McDaniel, CFM Cooperating Technical Partners Coordinator Idaho Department of Water Resources.
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Changes to FEMA Mapping John Grace, CFM Coastal Engineer - FEMA Region 1 - Boston March 14, 2014 – The Soil and Water Conservation Society – Winter Conference.
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
Implementing HAZUS-MH in Pre-Disaster Mitigation
FLOOD STUDY Chemung County, NY FEMA REGION II November 18, 2010.
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in “Slide Show” view.
May 17, 2011 True Flood Loss Analysis: Integrating Both Depth Grid and Specific Building Inventories Jason Rutter, CFM CoreLogic.
Flood Risk Datasets & Products in Greenville County, South Carolina Agenda Greenville Co, SC Overview Process, Examples, Lessons Learned, and Community.
‘Community Resilience Toolbox’ Training Series: Leveraging Public and Community Data to Assess Local Flood Risk Thursday, September 26, :00–1:00.
The Diversity of Hazus Uses for Hazus Beyond Planning ASFPM 2011 National Conference Louisville, KY Tuesday, May 17, 2011 ASFPM 2011 National Conference.
Risk Reduction/Building Science Tools Integrating RiskMAP Products John Ingargiola, EI, CBO, CFM FEMA Headquarters 2010 ASFPM Conference – May 19, 2010.
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
Risk MAP National Outreach Strategy and Community Engagement 2010 National Flood Conference April 14, 2010 Presented by: Vince Brown, Courtney Partlow.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
Dr. Shane Parson, PE, CFM, URS (RAMPP Team)
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Wave Height Estimate for Multi- Frequency Flooding Events Elena Drei-Horgan, PhD, CFM Darryl Hatheway, CFM Paul Carroll, PE May 24, 2012.
Risk MAP Early Demonstration Projects in Region II 2011 Association of State Floodplain Managers May 17, 2011 Louisville, KY.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
Mid-Course Adjustment Overview. Flood Map Modernization The Question “The committee understands that the 5-year, $1,000,000,000 program will not update.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
1 Welcome North Dakota State University Emergency Management & Planning Donald Borgen ND Division of Emergency Services ND GIS Users Conference.
Benefit Cost Analysis for Flood Hazard Mitigation: The Federal Emergency Management Agency (FEMA) Method (selected excerpts from FEMA EMI Training Course)
Discovery Meeting FEMA Region [#]. 2 Introductions.
Map Mod Indiana Status Next counties up Fountain Parke Randolph Martin Ripley.
1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX.
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
Land Subject to Coastal Storm Flowage Rebecca Haney Coastal Geologist Massachusetts Office of Coastal Zone Management.
Hazards, Vulnerability, and Mitigation Sub-Committee.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
Northwest Florida Water Management District Monday, August 22, 2011.
Examples in Quantifying Flood Risk Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
Oregon Statewide Flood Hazard Framework Geodatabase and Web Library, version 1.0 Seamless statewide GIS floodplain element that conforms to standards adopted.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
West Virginia GIS Conference WV Flood Risk Mapping Status and Needs Lee Brancheau, GISP FEMA Region III, Risk Analysis Branch May 5, 2016 West Virginia.
Prince George’s County Flood Forum March 23, 2017
Flood Hazard Area, Flood Insurance and Stormwater Management
Flood in Austin - Economic losses assesment
North Carolina Lumber River Basin Plan
Multi-Hazard Risk Report for Tillamook County
FEMA and Geospatial Coordination in West Virginia
Overview of FEMA’s Risk MAP Program & Taming the Terrain Beast
Risk MAP & the Little River Basin
Presentation transcript:

Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011

Outline  Overview of Risk MAP  Early Demonstration Project Scope  Summary and Results  Questions

Risk MAP Vison Through collaboration with State, Local, and Tribal entities, Risk MAP will deliver quality data that increases public awareness and leads to action that reduces risk to life and property.

Early Demo Project Scope  Develop Risk MAP Products Changes Since Last FIRM Multi Frequency Raster Flood Datasets  3D Flood Elevation  Flood Depth Risk Communication Datasets  % Annual Chance Layer  Probability of Flooding in 30 years Layer Areas for Potential Mitigation

Early Demo Project Scope  Develop Risk MAP Products Risk Assessment Analysis  Using FEMA’s HAZUS Software Flood Risk Database Flood Risk Report Flood Risk Map

Changes Since Last FIRM -CSLF-  What is it? GIS layer depicting the changes in SFHA and Floodway since previous mapped FIRM Quantifies Land Area Zone Changes Contributing Engineering Factors (Why?)  Uses: Communication and Outreach Public Notification through Mailings Internet Outreach Applications

Changes Since Last FIRM -CSLF- Early Demo Results  SFHA Changes Total Area: 18 sq. miles Increase: 6.35 sq. miles Decrease: sq. miles Net Change: sq. miles  Floodway Changes Total Area: 2.57 sq. miles Increase: 2.35 sq. miles Decrease: 0.0 sq. miles Net Change: 2.35 sq. miles

Water Surface Grids Multiple Return Periods  What is it? GIS datasets showing 3D flood elevations every 20 feet throughout the floodplain. Developed using results from computer modeling and is basis for flood depth grids. Developed for multiple flooding events (10%, 2%, 1%, 0.2%) countywide, where applicable. AE and A Zones  Uses: Hazard Communication and Outreach Efficient BFE Determination Could be paired with building specific data (FFE, values, etc.) for loss estimations

Depth Grids Multiple Return Periods  What is it? GIS datasets showing flood depths every 20 feet throughout the floodplain. Developed by subtracting 3D flood layer from ground surface. Developed for multiple flooding events (10%, 2%, 1%, 0.2%) countywide, where applicable. AE and A Zones  Uses: Hazard Communication and Outreach Loss Estimation Using FEMA’s HAZUS software.

Velocity Grids Multiple Return Periods  What is it? GIS datasets showing average flow velocities throughout the floodplain. Developed for new detail study only. Developed for multiple flooding events (10%, 2%, 1%, 0.2%) countywide, where applicable.  Uses: Hazard Communication and Outreach Risk Assessment. Combined with Depth Information for damage potential.

Percent Annual Chance Grid  What is it? GIS layer showing the “threshold” flood that inundates a given land area (ex. 75-year flood) Also known as the “Percent Annual Chance Grid”  Uses: Hazard Probability Communication Efficient / real-time flood mapping of non-standard flood events. Used as basis of developing the percent 30-year grid.

Percent Chance of Flooding in 30 Years Grid  What Is it? Estimates the probability of flooding at least once during a 30 year period Developed using the percent annual chance grids  Uses: Probability Communication Goes beyond the traditional “in or out”phylosophy

HAZUS Loss Estimations Flood Losses (per census block) Computed using Census Data and multi- return depth grids Separate scenarios created for each return period

Areas of Mitigation Interest -AOMI- Dataset which identify areas where mitigation efforts could be potentially effective Locations were determined from the effective FIS as well as the local Hazard Mitigation Plan

Flood Risk Database

Flood Risk Report

Flood Risk Map

Questions Thank You