4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.

Slides:



Advertisements
Similar presentations
Introduction Project Management.
Advertisements

TK3333 Software Management Topic 7: Schedule Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 University of Wales Bachelor of Science (Industrial Engineering and Management) Year 3 Copyright © 2012 MDIS. All rights reserved.Section
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Operations Management
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
11-1 ELC 347 project management Week Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Importance of Project Schedules
SWE Introduction to Software Engineering
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 19 Cost Management: Quality, Time, and the Theory of Constraints.
Critical Chain IOM580 Hiroshi Ochiumi 1. High Probability of Budget Overruns Time Overruns Compromising the Content 2.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Operations and Production Management
Appendix A Project Management: Process, Techniques, and Tools.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Midterm Review SE503 Advanced Project Management.
Critical Chain A Novel by Eliyahu Goldratt Product lifetimes are diminishing fast u Projects to create new products must be shortened drastically u Consider.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Quick Recap.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Software Project Management Lecture 11. Outline Brain Storming session  Some simple discussion on questions and their answers  Case studies related.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
 Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Agile Concepts - II “Agile” Estimating & Planning Nupul Kukreja 5 th November, 2014.
Overall Quality Assurance, Selecting and managing external consultants and outsourcing Baku Training Module.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
2.1 DEFINE THE PROJECT STRATEGY The project is a vehicle for the execution of strategy both organization and individual. This implies that a high level.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
The Theory of Constraints
20-1 Inventory Management: Economic Order Quantity, JIT, and the Theory of Constraints 20.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Time Management
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
303KM, Introduction to Project Management1 Chapter 1: Introduction to Project Management.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
ERP (21-550) Sharif University of Technology Session #6
Introduction Project Management.
The Theory of Constraints
Critical Chain Project Scheduling
Critical Chain Project Scheduling
Introduction Project Management.
Managing Service Projects
Presentation transcript:

4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project failures, there is the needs to find the courses and provide solutions that has significant economic importance. The first step is to identify the problems that individuals or organisations are facing. So, what are the problems?

4.2 The Effects Projects that run late, over budget or fail to meet the key needs of their stakeholders course considerable problems for businesses, government and individuals. A simple basic analysis suggests that either the methods being used for project management or their application or both must be at fault. So, the problems that we see regularly happening that the projects contain fundamental uncertainties- may be related to the process or what we achieve, where they are normally very challenging.

4.3 The Causes The reasons: a) we must first understand the techniques themselves for the shortcomings of the techniques and search for the potential solutions. b) many organisations still require the use of the original techniques. So, the techniques require some justifications as follows: All goals are based on estimates which contain uncertainties. The reality is that activities will sometimes run late and never early. Estimates of activity times generally include a large safety margin but it does not help in achieving on time of completion. Network diagram or cash flow chart. Normally, with a latest start time for activities are becoming more critical. The more critical paths in a project the greater the chance of failing to meet time goals, the less chance of ‘focus’ by the Project Manager.

By this method of scheduling activities, the situation arises where there are parallel of activities, the biggest delay is passed on to the subsequent activities.. Sometimes, we measure progress is in error. By the time the Project Manager is notified of a problem, it is already too late to prevent it having an impact. All these while, we notified the progress is satisfactory. It is usual in business projects all have multi-tasks. Everybody in the team has many tasks ongoing at any one time. Where most people were given extra time to do works, now it is all wasted at the front-end.

Figure 4.1 The Effect of Multi Tasking Project A 10 days Project B 10 days Project C 10 days Project A 20 days Project B 20 days Project C 20 days

4.4 B ACKGROUND T O A P OSSIBLE S OLUTION (TOC) The Theory of Constraint (TOC) was the result of the application of a structured logic approach to the problems of a manufacturing environment. A fundamental of this is to manage systems by focusing on the constraint/bottleneck. The importance of the constraint is that it determines the ability of the system to do work and thereby earn revenue. This focus on the throughput is the factor that differentiated it from other inventory control ideas at the same time.

The stages of the TOC approach are as follows: Identify the constraint-the critical path and the critical resources, Exploit the system constraint, Subordinate everything else to the constraint, Elevate the constraint, Go back and find new constraints, repeating the process.

4.5 A PPLICATION OF TOC TO P ROJECT M ANAGEMENT The above steps applied to project as follows: The constraints include The critical path of the project-policy of firm, The resources that are on critical paths of one or more projects, Dates that are fixed into schedule and cannot be moved.

4.6 E STIMATES The principles: o Estimate both from initial to finish. o Safety at the end of critical path. o Time plan by giving regular updates on. o Progress be monitored. 4.7 Controlling Projects Project Manager has the ultimate responsibility for control the project. To gain benefits from the early finish.