1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.

Slides:



Advertisements
Similar presentations
1 Front End rf and Gas Cavities David Neuffer Fermilab f October 2011.
Advertisements

1 Neutrino Factory Front End (IDS) -Chicane & Absorber David Neuffer C. Rogers, P. Snopok, C. Yoshikawa, … January 31, 2012.
Bunched-Beam Phase Rotation David Neuffer Fermilab.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
1 Optimization of baseline front end for a neutrino factory David Neuffer FNAL (August 19, 2009)
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
Taylor Models Workhop 20 December 2004 Exploring and optimizing Adiabatic Buncher and Phase Rotator for Neutrino Factory in COSY Infinity A.Poklonskiy.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
1 Front End Studies and Plans David Neuffer FNAL (November 10, 2009)
1 Front End Studies and Plans David Neuffer FNAL (October 27, 2009)
1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
1 Energy-Phase Rotation with a proton absorber David Neuffer September 27, 2011.
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
NF Front End Meeting, April 27, 2010 Initial Cooling with HFOFO Snake Y. Alexahin, FNAL APC.
1 Neutrino Factory Front End (IDS) and Variations David Neuffer November 23, 2010.
1 Ionization Cooling – neutrinos, colliders and beta-beams David Neuffer July 2009.
MuCool Test Area RF Workshop 111/15/2010 Muons, Inc. Loaded Pillbox Cavity Milorad Popovic & Katheryn Decker French (with Mike, Chuck, Katsuya, Al and.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
Helical Cooling Channel Simulation with ICOOL and G4BL K. Yonehara Muon collider meeting, Miami Dec. 13, 2004 Slide 1.
1 Front End Capture/Phase Rotation & Cooling Studies David Neuffer Cary Yoshikawa December 2008.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed,
1 Front End – present status David Neuffer March 31, 2015.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Muon cooling with Li lenses and high field solenoids V. Balbekov, MAP Winter Meeting 02/28-03/04, 2011 OUTLINE  Introduction: why the combination of Li.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 The 325 MHz Solution David Neuffer Fermilab January 15, 2013.
1 Front End for MAP Neutrino Factory/Collider rf considerations David Neuffer May 29, 2014.
Harold G. Kirk Brookhaven National Laboratory Progress in Quad Ring Coolers Ring Cooler Workshop UCLA March 7-8, 2002.
1 Front End – present status David Neuffer March 17, 2015.
1 International Design Study Front End & Variations David Neuffer January 2009.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
NuFACT06 Summer School -Factory Front End and Cooling David Neuffer f Fermilab.
Bright muon sources Pavel Snopok Illinois Institute of Technology and Fermilab August 29, 2014.
1 Front End – present status David Neuffer March 3, 2015.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
1 Muon Capture for a Muon Collider David Neuffer July 2009.
1 Alternative options for beam cooling for a muon accelerator front-end Diktys Stratakis Physics Department Brookhaven National Laboratory Front-End Phone.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Adiabatic buncher and (  ) Rotator Exploration & Optimization David Neuffer(FNAL), Alexey Poklonskiy (FNAL, MSU, SPSU)
Pros and Cons of Existing Cooling Schemes David Neuffer Fermilab.
Final Cooling Options For a High- Luminosity High-Energy Lepton Collider David Neuffer FNAL Don Summers, T. Hart, … U. Miss.
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
1 Bunch Recombiner for a μ + μ - Collider Cooling Scenario David Neuffer FNAL (July 7, 2010)
Muons, Inc. 3/5/2012MAP Collab. Meeting at SLAC Cary Y. Yoshikawa 1 Bunch Coalescing in a Helical Channel* Cary Yoshikawa Chuck Ankenbrandt Dave Neuffer.
1 Front End – present status David Neuffer December 4, 2014.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
1 6D Cooling Chris Rogers, ASTeC-STFC Topical Workshop 23 Oct 2007.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC
Integrating Chicane in G4BeamLine
+-- Collider Front end- Balbekov version
David Neuffer Cary Yoshikawa March 2009
The Accelerator Complex from the International Design Study
Muon Front End Status Chris Rogers,
Design of the MANX experiment
Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC
Presentation transcript:

1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon

2Outline  Front End for the IDS Neutrino Factory  baseline design for IDS Developed from study 2A, ISS  Basis for engineering/costs Rf requirements  Variations  rf gradient/ B concerns alternatives  gas-filled rf/insulated rf/low-B/  Losses – control Chicane, proton absorber  μ + -μ - Collider Front End  Shorter bunch train Larger V ’, rebunching  Rebuncher Time reverse front-end

3 IDS Baseline Buncher and φ-E Rotator  Drift (π → μ)  “Adiabatically” bunch beam first (weak 320 to 232 MHz rf)  Φ-E rotate bunches – align bunches to ~equal energies  232 to 202 MHz, 12MV/m  Cool beam MHz 18.9 m~60.7 m FE Targ et Solenoid DriftBuncherRotatorCooler ~33m42 m ~80 m p π→μ

4 Neutrino Factory Front End 23 bunches 0m Drift - 80m Bunch-110m Rotate-155m Cool-240m 700 MeV/c 0 MeV/c -30m 30m v  Drift from target ~80m  Beam lengthens  Buncher (~33m)  N=10  P 0 =233 MeV/c, P N =154 MeV/c  330 → 235 MHz  V’= 0→9 MV/m  Rotator (~42m)  N=10.05 – accelerate/decelerate bunches  235 → 202 MHz,V’= 12 MV/m  Cooler (~80m)  MHz, ASOL lattice  15MV/m in rf cavities  LiH or H 2 cooling  Captures both μ + and μ - Δ= 10 λ rf Δ= λ rf

5 ICOOL - G4beamline  P. Snopok has run the IDS front end with both ICOOL & G4 beamline  High statistics (>10 5 tracks)  Obtains ~0.1 μ + and μ - /8 GeV p within acceptances ε T < 0.03, ε L < 0.15  Validation of simulation codes  Simultaneous simulation of both signs

6 Parameters of IDR baseline  Initial drift from target to buncher is 79.6m  18.9m (adiabatic ~20T to ~1.5T solenoid)  60.7m (1.5T solenoid)  Buncher rf – 33m  320  232 MHz  0  9 MV/m (2/3 occupancy)  B=1.5T  Rotator rf -42m  232  202 MHz  12 MV/m (2/3 occupancy)  B=1.5T  Cooler (50 to 90m)  ASOL lattice, P 0 = 232MeV/c,  Baseline has 15MV/m, cm LiH absorbers /cell

7 IDS : hardware specification  Specify front end in specific rf cavities, frequencies  Buncher – 13 rf frequencies  , , , , , , , , , , , , (13 f)  ~100MV total Keep V’ < ~7.5MV/m  Rotator – 15 rf frequencies  , , , , , ,212.28, ,208.64, , ,204.25, , , (15 f)  336MV total, 56 rf cavities 12MV/m at 2/3 occupancy  Cooler  MHz –up to 75m ~750MV ~15 MV/m, 100 rf cavities Magnet Requirements:

8 Rf Buncher/Rotator/Cooler requirements  Buncher  37 cavities (13 frequencies)  13 power supplies (~1—3MW)  RF Rotator  56 cavities (15 frequencies)  12 MV/m, 0.5m  ~2.5MW (peak power) per cavity  Cooling System – MHz  m cavities (75m cooler), 15MV/m  ~4MW /cavity Front End section Length#rf cavities frequencies# of freq. rf gradientrf peak power requirements Buncher33m to to 7.5~1 to 3.5 MW/freq. Rotator42m to ~2.5MW/cavity Cooler75m MHz115 MV/m~4MW/cavity Total drift)~240m19329~1000MV~550MW

9 How Long a Bunch Train for IDS?  ISS study alotted space for 80 bunches (120m long train)  For IDS 80m (54 bunches) is probably plenty 100 ~60m ~80m Study ISS 120m 80m ISS IDS Muon Decays IDS: ~3 bunch trains simultaneously -both μ+ and μ -

10 Possible rf cavity limitations V’ rf may be limited in B-fields  800 MHz pillbox cavity  200 MHz pillbox test (different B)  NF needs up to ~1.5T, 12 MV/m More for cooling Potential strategies:  Use Be Cavities (Palmer)  Use lower fields (V’, B)  <10MV/m at 1.5T?  Need variant for cooling ?  Cooling channel variants  Use gas-filled rf cavities  Insulated rf cavities  Bucked coils (Alekou)  Magnetic shielding 201MHz 805MHz Need More Experiments !

11 Cooling Lattice variations  Gas-filled rf  With LiH absorbers  Magnetically shielded  Small B at rf  Magnetically Insulated  B  rf surface  Bucked Coil  Reduced B in rf  Alekou

12 Problem: Beam losses along Front End  Start with 4MW protons  End with ~50kW μ + + μ - plus p, e, π, … ~20W/m μ-decay  ~0.5MW losses along transport >0.1MW at z>50m  Want “Hands-on” maintenance  hadronic losses < 1W/m  Booster, PSR criteria  Simulation has >~100W/m With no collimation, shielding, absorber strategy Drift Cool

13 Control of Front End Losses  Add shielding  Resulting losses ?  Chicane and proton absorber to localize losses (C. Rogers)  Removes most protons  Most desired μ’s survive  Greatly reduces downstream activation problem Shielding ? 12.7 m~60.0 m FE Tar get Solenoid DriftBuncherRotatorCooler ~33m42 m ~90 m p π→μ

14 Muon Collider/NF Beam Preparation  Baseline Muon Collider beam preparation system identical to that for Neutrino Factory  downstream portions (6D cooling, acceleration, collider) are distinct much more cooling and acceleration needed for collider Neutrino Factory Muon Collider

15 Front End for Muon Collider  Muon Collider front end is different  must capture μ + and μ -  want single bunches (not trains) Bunches are recombined …  Maximum μ/bunch wanted  Longitudinal cooling needed;  Larger rf gradient can be used (?) NF will debug gradient limits Cost is less constrained  Use shorter BR system, more gradient, and capture at higher momentum  230  270 MeV/c  150m  120m  9/12/15 MV/m  15/16/18 or 15/18/20 MV/m  1.5T  2T

16 Muon Collider variants  ΔN: 10  8  Rf gradients: 12.5  15  18 MV/m  Or 15  18  20 MV/m  Shorter system ~102m m~33m FE Targ et Solenoid Drift Buncher RotatorCooler ~25.5m27 m ~80 m p π→μ

Variant front ends for muon collider Front end Scenario Drift, Buncher, Rotator Length Rf VoltagesFull length ( w 75m cooling)  + /p (  t <0.03,  L <0.3m)  - /p (  t <0.03,  L <0.3m) Core bunches, N B, all  - /p IDS/NF80.6, 33, 42m0  9, 12, 15230m /0.107 N=1055.3, 31.5, 330  12, 15, /0.141 N=847.8, 35.5, 27 m0  15, 18, / Table 1: Comparison of muon source front end systems.

Integrate into 6-D cooling system  Initial Cooling transition  NF transverse cooling only  Transition to 6-D cooling needed Snake ? HCC? “Guggenheim”? Split μ + - μ - Cool 6-D by large factors  Recombine Bunches After cooling to small bunches  Front end splits 1 huge emittance bunch into string of smaller ε – bunches Can we time reverse to combine cooled bunched to single bunches ? 18

Bunch Recombination: Helical Channel  Would like a large dependence of path length on energy  Helical channel naturally has that  Linear dependence is nicest …  η=0.43 looks possible  HC – B= 4.2T b d =0.75, b q =0.4  κ=1, λ=1.6m, P 0 =290MeV/c  Dˆ=1.7, D=0.44m “γ t ”=

Longitudinal Dynamics in Helical Channel  Set up an HCC & see if bunch recombination is possible  κ=1, η=0.43 λ=1m  Very linear bunching over T=150—280 MeV  See if one can set up HC line for rebunching with this case  Defer matching problem by using constant HCC 20

 Obtain beam from end of 3-stage HCC channel - K. Yonehara  13 bunches, ε L =0.0011m  η=0.43 transport  40m 1MV/m rf  204  270 MHz (+45° to -45° ) (N=12.25) η=0.43  60m drift  200MHz rf -10MV/m  >95% capture  ε L = ~ Simulate in 3-D- G4BL –C Yoshikawa 60MeV 60ns z = 0 m z = 40 m z = 100 m z = 105m

Summary  Muon Collider:  Need to integrate bunch combiner into complete cooling scenario  ν-Factory front end  costing exercise for IDR “Most Likely” cost range?  rf in magnetic fields ? adapt to rf measurements  manage losses chicane/absorber/… simulation studies 22

Questions? 23