GOES-14 Science Test December 2009 Don Hillger, Deb Molenar, Dan Lindsey, John Knaff NOAA/NESDIS/Satellite Applications and Research Regional And Mesoscale.

Slides:



Advertisements
Similar presentations
1 GOES-14 Science Test December 2009 Don Hillger, Deb Molenar, Dan Lindsey, John Knaff NOAA/NESDIS/STAR/RAMMB Dave Watson, Mike Hiatt, Dale Reinke, etc.
Advertisements

Overview of GOES and MTSAT Platforms: Fire Monitoring Characteristics
24 bit GeoColor Product CIRA GOES and JPSS RGB Product Development Updates for AWIPS II D2D and NCP Debra A. Molenar 1, Scott P. Longmore 2 IntroductionArtifacts.
1 GOES-14 Imager and Sounder a preliminary look Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite Products Branch (ASPB)
ABI Scan Modes 1 Scan mode (3) or ‘flex mode’ for the ABI: - Full disk every 15 minutes + 5 min CONUS + 1-min mesoscales (2 locations). [Scan mode (4)
UW-CIMSS/UAH MSG SEVIRI Convection Diagnostic and Nowcasting Products Wayne F. Feltz 1, Kristopher M. Bedka 1, and John R. Mecikalski 2 1 Cooperative Institute.
GOES-15 Science Test: Starting 11 August 2010 Don Hillger, John Knaff, Dan Lindsey, Deb Molenar NOAA/NESDIS/STAR/Regional And Mesoscale Meteorology Branch.
Preliminary Noise Estimates for Infrared Data from the GOES-13 Imager Don Hillger NOAA/NESDIS/StAR/RAMMB Tim.
Severe Weather Applications with GOES-R: What will severe weather look like through the “eyes” of GOES-R? Dan Lindsey NOAA/NESDIS/STAR/RAMMB Fort Collins,
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu December 18, 2009.
GOES-N Science Test Timothy J. Schmit NOAA/NESDIS/STAR Advanced Satellite Products Branch (ASPB) and many others UW-Madison May 2005.
STAR Calibration Support for GOES Post Launch Test (PLT) X. Wu & F. Yu NOAA/NESDIS/STAR/SPB & NOAA.
GOES-13 First Infrared radiances Data from SSEC Data Center T. Schmit ASPB.
GOES-13 Sounder Striping Don Hillger NOAA/NESDIS/StAR/RAMMB CIRA/Colorado State University Tim Schmit NOAA/NESDIS/StAR/ASPB CIMSS/University of Wisconsin.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
GOES-R Synthetic Imagery over Alaska Dan Lindsey NOAA/NESDIS, SaTellite Applications and Research (STAR) Regional And Mesoscale Meteorology Branch (RAMMB)
Synthetic Satellite Imagery: A New Tool for GOES-R User Readiness and Cloud Forecast Visualization Dan Lindsey NOAA/NESDIS, SaTellite Applications and.
GOES-R Proving Ground Product Development at CIRA Project Overview The GOES-R Satellite Proving Ground project engages the National Weather Service in.
H-8 Project Update COPC May 27, H-8 Project Update JMA planning for full H-8 operations in July 2015 – Commissioning progressing well Data quality.
GOES-R highlights Bernie Connell Cooperative Institute for Research in the Atmosphere Colorado State University December 2013.
GOES Instrument CONOPS Considerations
Gene Legg Office of Satellite Data Processing and Distribution Asia Pacific Satellite Data Exchange and Utilization Meeting Honolulu, HI, September 20-22,
Data Changes from GOES- 12/NOP Imagers Timothy J. Schmit NOAA/NESDIS/STAR (formerly ORA) SaTellite Applications and Research (STAR) Advanced Satellite.
GOES-R Proving Ground GOES-R Proving Ground Demonstration of Imagery Products at NOAA’s Storm Prediction Center and Hazardous Weather Testbed Chris Siewert.
1 CIMSS Participation in the Development of a GOES-R Proving Ground Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite.
GOES-R ABI PROXY DATA SET GENERATION AT CIMSS Mathew M. Gunshor, Justin Sieglaff, Erik Olson, Thomas Greenwald, Jason Otkin, and Allen Huang Cooperative.
Thanks also to… Tom Wrublewski, NOAA Liaison Office Steve Kirkner, GOES Program Office Scott Bachmeier, CIMSS Ed Miller, NOAA Liaison Office Eric Chipman,
GOES-R ABI New Product Development Donald W. Hillger NOAA/NESDIS, SaTellite Applications and Research (STAR) Regional And Mesoscale Meteorology Branch.
PLANS FOR THE GOES-R SERIES AND COMPARING THE ADVANCED BASELINE IMAGER (ABI) TO METEOSAT-8 UW-Madison James J Gurka, Gerald J Dittberner NOAA/NESDIS/OSD.
GOES-13 Sounder Noise Don Hillger NOAA/NESDIS/StAR/RAMMB CIRA/Colorado State University.
GOES and GOES-R ABI Aerosol Optical Depth (AOD) Validation Shobha Kondragunta and Istvan Laszlo (NOAA/NESDIS/STAR), Chuanyu Xu (IMSG), Pubu Ciren (Riverside.
GOES-R ABI Synthetic Imagery at 3.9 and 2.25 µm 24Feb2015 Poster 2 Louie Grasso, Yoo-Jeong Noh CIRA/Colorado State University, Fort Collins, CO
Advanced Baseline Imager (ABI) will be flown on the next generation of NOAA Geostationary Operational Environmental Satellite (GOES)-R platform. The sensor.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
Survey of OSPO Efforts to Improve Operational GOES Imagery S. Hadesty*, K. Ludlum**, N. Sanders*, C. Thomas* * ASRC Federal Contractor – Engineering and.
P1.85 DEVELOPMENT OF SIMULATED GOES PRODUCTS FOR GFS AND NAM Hui-Ya Chuang and Brad Ferrier Environmental Modeling Center, NCEP, Washington DC Introduction.
NESDIS Center for Satellite Applications and Research Air Quality Products from GOES-R Advanced Baseline Imager (ABI) S. Kondragunta, NOAA/NESDIS/STAR.
60 West – A Wisconsin Perspective Timothy J. Schmit Gary S. Wade NOAA/NESDIS/STAR Advanced Satellite Products Branch (ASPB) Madison, WI GOES-10:
Improvements of the Geostationary Operational Environmental Satellites (GOES)-R series for Climate Applications GOES-R data and products will support applications.
The GOES-10 Overview UW-Madison Tim Schmit and Gary Wade Research Satellite Meteorologist NOAA/NESDIS/ORA(STAR) Advanced Satellite Products Branch (ASPB)
Near-Real-Time Simulated ABI Imagery for User Readiness, Retrieval Algorithm Evaluation and Model Verification Tom Greenwald, Brad Pierce*, Jason Otkin,
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 The GOES-14 Science Test Timothy Schmit (GOVERNMENT PRINCIPAL INVESTIGATOR)
GOES-R Air Quality Proving Ground H. Zhang 1, R. M. Hoff 1, S. Kondragunta 2, A. Huff 3, M. Green 4, S. A. Christopher 5, B. Pierce.
Jinlong Li 1, Jun Li 1, Timothy J. Schmit 2, Fang Wang 1, James J. Gurka 3, and W. Paul Menzel 2 1 Cooperative Institute for Meteorological Satellite Studies.
As components of the GOES-R ABI Air Quality products, a multi-channel algorithm similar to MODIS/VIIRS for NOAA’s next generation geostationary satellite.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
Transitioning research data to the operational weather community Overview of GOES-R Proving Ground Activities at the Short-term Prediction Research and.
Real-time Display of Simulated GOES-R (ABI) Experimental Products Donald W. Hillger NOAA/NESDIS, SaTellite Applications and Research (STAR) Regional And.
What does it cover? This session addresses “Why?”, “When?”, and “What Sensors?” will be on GOES- R, and presents examples of what to expect. If is a look.
GOES N, O, P Pre-launch Overview Timothy J. Schmit NOAA/NESDIS/ORA Advanced Satellite Products Team (ASPT) Madison, WI and many others UW-Madison MUG Meeting.
GOES-R ABI AS A WARNING AID Louie Grasso, Renate Brummer, and Robert DeMaria CIRA, Fort Collins, CO Dan Lindsey, Don Hillger, NOAA/NESDIS/RAMMB, Fort Collins,
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
Solar X-ray Imager (SXI) Current and Future Requirements 22 May 2001 Steve Hill Solar Causes and Effects... Operational Requirements Improvements for GOES-R+
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Combining GOES Observations with Other Data to Improve Severe Weather Forecasts.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Non-Meteorological Application for Himawari-8 Presented.
1 PG-UR Annual Meeting: Welcome from the GOES-R Program Scientist Steven J. Goodman GOES-R Program Senior Scientist NOAA/NESDIS Annual NOAA Satellite Proving.
Hands-on exercise showcasing ABI’s 16 channels with improved spatial resolution and temporal refresh rate (plus RGB ABI examples) Mat Gunshor1, Tim.
NWA Annual Meeting Joint Satellite Workshop
GOES-R Resources from NOAA, NASA & CIMSS
GOES-14 Imager and Sounder
Synthetic GOES-R Imagery of Agricultural Burning and Forest Wildfires
SPSRB Information Brief
Cal/Val Activities at CIRA
Satellite Data Resources: Browsing and Accessing Archived Datasets
GOES-16 ABI Lunar Data Preparation to GIRO
GOES-R Hyperspectral Environmental Suite (HES) Requirements
Meteosat Second Generation
AIRS/GEO Infrared Intercalibration
GOES -12 Imager April 4, 2002 GOES-12 Imager - pre-launch info - radiances - products Timothy J. Schmit et al.
Presentation transcript:

GOES-14 Science Test December 2009 Don Hillger, Deb Molenar, Dan Lindsey, John Knaff NOAA/NESDIS/Satellite Applications and Research Regional And Mesoscale Meteorology Branch (RAMMB) Dave Watson, Mike Hiatt, Dale Reinke, etc. CIRA, Colorado State University Fort Collins CO Don Hillger and Tim Schmit co-lead the NOAA Science Test 1

Last time: GOES-13 Science Test – December

Previous GOES Science Tests GOES-11 Daniels, J.M., T.J. Schmit, and D.W. Hillger, 2001: GOES-11 Imager and Sounder Radiance and Product Validations for the GOES-11 Science Test, NOAA Tech. Rep. NESDIS 103, (August), 49 pp. GOES-12 Hillger, D.W., T.J. Schmit, and J.M. Daniels, 2003: Imager and Sounder Radiance and Product Validation for the GOES-12 Science Test. NOAA Tech. Rep., NESDIS 115, (September), 70 pp. GOES-13 Hillger, D.W., and T.J. Schmit, 2007: The GOES-13 Science Test, NOAA Tech. Rep., NESDIS 125, (September), 88 pp. Hillger, D.W., and T.J. Schmit, 2009: The GOES-13 Science Test: A Synopsis. Bull. Amer. Meteor. Soc., 90(5), (May), Acknowledgements The GOES Science Tests occur at the end of long Post Launch Test (PLT) periods for each satellite and are possible because of the cooperation of NASA and NOAA/OSD and OSO personnel, who in particular prepare the satellite schedules and enable the daily changes that are requested by the science team. Thanks as well to all who contribute to the analysis of the data collected during the Science Tests. 3

GOES Science Test Goals For all GOES check-outs, the goals of the Science Test include the following: 1)To assess the quality of the GOES radiance data. This is accomplished by comparison to other satellite measurements or by calculating the signal-to-noise ratio compared to specifications, as well as assess the striping in the imagery due to multiple detectors. 2)To generate products from the GOES data stream and compare to those produced from other satellites. These included several Imager and Sounder products currently used in operations. 3)Rapid-scan imagery of interesting weather cases are collected with temporal resolutions as fine as every 30 seconds, a capability of rapid-scan imagery from GOES-R that is not implemented operationally on current GOES. 4

GOES-14 NOAA/Science Test Website 5

GOES-O baseline plan – 2009 June Launch – 6/26/09 LAM burn 1 – 6/28/09 LAM burn 2 – 7/1/09 LAM burn 3 – 7/3/09 LAM burn 4 – 7/5/09 LAM burn 5 – 7/7/09 Solar array deployment – 7/8/09 Magnetometer boom deployment – 7/12/09 PLT Start – 7/16/09 Engineering Handover – 7/17/09 SXI 6.29 Load – 7/20/09 XRP Deploy – 7/23/09 XRS/EUV Power-on – 7/23/09 First Public Imager Full Disk Images – 7/27/09 First Public SXI Image – 8/5/09 Drift Control maneuver – 8/6/09 Imager/Sounder Cooler Cover Deployment – 8/14/09 First Public IR Image – 8/16/09 INR Start-up – 8/27/09 to 9/3/09 Contingency Operations Readiness Review (CORR) – 9/10/09 IMC Spec Testing – 9/13/09 to 10/29/09 NSSK 1 Maneuver – 10/30/09 EWSC to 105W Maneuver – 11/9/09 to 11/21/09 NSSK 2 Maneuver – 11/27/09 NOAA Science Testing – 11/30/09 to 12/14/09 Operations Acceptance Review (OAR) – 12/14/09 PLT End – 12/14/09 6

First GOES-14 Visible Image 1730 UTC 27 July

First GOES-14 IR Images 1730 UTC 17 August

First GOES-14 Solar X-ray Image 1400 UTC 13 August 2009 The NOAA Science Test does not involve the solar instrumentation. 9

GOES-14 Science Test December 2009 Five (5) weeks: – Starting: 30 November 2009 – Ending: 04 January 2010 Eight (8) pre-determined schedules (See Daily schedule changes (at 1630 UTC), determined by test coordinators, based on feedback from participating scientists GOES-14 will be located at 105°W during the Science Test Afterwards, GOES-14 will be kept in normal mode and the solar instruments only will be operational. 10

GOES-O Test Schedules Test ScheduleImagerSounderPurpose C5RTNEmulation of GOES-East routine operations Radiance and product comparisons C4RTNEmulation of GOES-West routine operations Radiance and product comparisons C1CONContinuous 5-minute CONUS sector26-minute CONUS sector every 30 minutes Test navigation, ABI-like (temporal) CONUS scans C2SRSOContinuous 1-minute rapid-scan (with center point specified for storm analysis) 26-minute sector every 30 minutes (with center point same as Imager) Test navigation, ABI-like (temporal) mesoscale scans C3SRSOContinuous 30-second rapid-scan (with center point over either Huntsville AL, Normal OK, or Washington DC areas) three locations only 26-minute sector every 30 minutes (with center same as Imager) To coordinate with lightning mapping arrays in Huntsville AL, Norman OK, or Washington DC C6FDContinuous 30-minute Full Disk (including off-earth limb/space view measurements) Alternating east and west limb/space views every hour Noise, detector-to-detector striping, fires, etc. C7MOONCapture moon off edge of earth (when possible) Emulation of GOES-East routine operations Test ABI lunar calibration concepts C8Emulation of 2 km ABI through spatial over-sampling (continuous 19 minutes for same sector per specific line-shifted scan strategy) Emulation of GOES-East routine operations ABI-like higher-resolution product development 11

Limb Sounding (for noise/striping) 12

CONUS Imager (product generation) 13

CONUS Sounding (product generation) 14

Imager rapid-scan (lightning/radar) 1-minute interval30-second interval Example of center location over Huntsville AL 15

Overlapping (ABI 2 km emulation) 16

GOES-14 Coordination/Timing EventTime (UTC) Time (EST) Washington DC Time (CST) Wisconsin/CIMSS Huntsville/NASA Time (MST) Colorado/CIRA Coordinators send schedule requests (30 min before actual request) 1500 UTC1000 EST0900 CST0800 MST Primary coordinators request daily schedule (1 h before start) 1530 UTC1030 EST0930 CST0830 MST Start of new daily schedule (specified by operations) 1630 UTC1130 EST1030 CST0930 MST 17

Participating Sites SitePrimary CoordinatorsOther Coordinators RAMMB/CIRA/ColoradoDon HillgerDan Lindsey John Knaff ASPB/CIMSS/WisconsinTim SchmitGary Wade Scott Bachmeier NASA/MSFC/Huntsville (mainly for rapid-scan imagery, coordination with radar/lightning mapping arrays) Walt Petersen 18

GOES-14 Science Test Preliminary Results First official GOES-14 images were collected from Imager (visible and IR) and Sounder Improved (4 km) resolution of 13.3 µm band required changes to GVAR format. Several issues with implementing the new GVAR format were discovered and are being rectified, both at the front end, and at GVAR receiving sites. Paired detectors on the higher-resolution 13.3 µm band were inadvertently swapped. Now fixed. Image navigation issues have been addressed (McIDAS server software was upgraded.) 19

GOES-14 Science Test Questions? One stop GOES-14 Science Test shopping: Tim Schmit presentation to follow! 20