From Students… …to Professionals The Capstone Experience 09/14: Team Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan.

Slides:



Advertisements
Similar presentations
Submission Instructions – Delete this slide This slide is designed to help you fill out the pro-forma for the 2012 Energy Chamber CSR Awards. Remember.
Advertisements

Read Me Carefully (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower.
From Students… …to Professionals The Capstone Experience 11/20: Team Project Video Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering.
Read Me (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower left footer,
Read Me (Delete this slide.) (1 of 2) Presenting  The purpose of the alpha presentation is to demonstrate the alpha version of your software in order.
Read Me (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower left footer,
Read Me (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower left footer,
Instructions (Delete this slide.) 1.Required Template a.Do not edit the master slides. b.Do not change the organization or number of slides. c.Make your.
Read Me (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower left footer,
What’s up? (Delete this slide.) 1.What follows is the required skeleton for your presentation. 2.Do not change the organization or number of slides. Make.
Team READ THIS SLIDE CAREFULLY Alpha Demonstrations will be given by each team at our all-hands meeting on the dates listed at All-Hands Meeting Agendas.All-Hands.
Team READ THIS SLIDE CAREFULLY Beta Demonstrations will be given by each team at our all-hands meeting on the dates listed at All-Hands Meeting Agendas.All-Hands.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Team : READ THIS SLIDE CAREFULY Project Plan presentations will be given by each team at our all-hands meeting on the dates listed at All- Hands Meeting.
7. Team Project Schedules September 22, 2004 Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Fall 2004.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Spring 2007 Team : CSE 498, Collaborative Design.
6. Team Project Architectures September 20, 2004 Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Fall.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Team : CSE 498, Collaborative Design.
6. & 7. Teams: Technical Specification / Schedule Project Title Team Member 1 Team Member 2 Team Member 3 Team Member 4 Department of Computer Science.
6. & 7. Team Technical Specifications and Schedule Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Spring.
What’s up? (Delete this slide.) 1.What follows is the required skeleton for your presentation. 2.Do not change the organization or number of slides. Make.
0-1 Team 1 Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auto-Owners.
Read Me (Delete this slide.) (1 of 2) Presenting  The purpose of the beta presentation is to demonstrate that the software portion of the project is complete.
Read Me (Delete this slide.) (1 of 2) Presenting  The purpose of the beta presentation is to demonstrate that the software portion of the project is complete.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Ashley Montebello – CprE Katie Githens – SE Wayne Rowcliffe – SE Advisor/Client: Akhilesh Tyagi.
Read Me Carefully (Delete this slide.) Required Template  Do not edit the Slide Masters.  Do edit the Handout Master (6 Slides Per Page) o In the lower.
From Students… …to Professionals The Capstone Experience 01/25: Team Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan.
PowerPoint Template –
EPGS Research Night Submission Guidelines
Read Me (Delete this slide.) [1 of 2]
Read Me (Delete this slide.) [1 of 2]
Read Me (Delete this slide.) [1 of 2]
11/30: Team Project Video Status Reports
Read Me (Delete this slide.) [1 of 2]
Read Me (Delete this slide.) [1 of 2]
Read Me (Delete this slide.) [1 of 2]
The Capstone Experience
11/29: Team Project Video Status Reports
04/20: Team Project Video Status Reports
Read Me (Delete this slide.) [1 of 2]
The Capstone Experience
Read Me Carefully (Delete this slide.)
The Capstone Experience
The Capstone Experience
Read Me (Delete this slide.) [1 of 2]
Team [Team Name] Project Plan Presentation
Capstone Presentation Title (Template)
Team [Team Name] Alpha Presentation
Status Report Presentation Team [Team Name]
11/28: Team Project Video Status Reports
Team [Team Name] Beta Presentation
Read Me (Delete this slide.) (1 of 2)
Read Me Carefully (Delete this slide.)
CSE 498, Collaborative Design
Read Me (Delete this slide.) (1 of 2)
The Capstone Experience
Status Report Presentation Team [Team Name]
Team [Team Name] Alpha Presentation
Read Me (Delete this slide.)
Team [Team Name] Project Plan Presentation
04/18: Team Project Video Status Reports
Read Me (Delete this slide.) (1 of 2)
Team [Team Name] Beta Presentation
Read Me (Delete this slide.) (1 of 2)
A short guide to using the ETSI PowerPoint Template
Read Me Carefully (Delete this slide.)
Read Me (Delete this slide.) (1 of 2)
PITCHING Presentation Template
Presentation transcript:

From Students… …to Professionals The Capstone Experience 09/14: Team Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan State University Fall 2011

Instructions (Delete this slide.) Required Template  Do not edit the master slides.  Do not change the organization or number of slides.  Make your presentation fit within these four slides. Content  For the slide titles, replace with your company name as in “Team Auto-Owners”.  All presentations will be posted on the course web site so do not include company confidential information or anything that your client would not want posted.  Delete this slide from the presentation. Presenting  The order of the presentations during our meeting will be team numerical order.  The time limit for your presentation is 5 minutes, which will be strictly enforced. Practice your presentation to ensure that you will finish within the allotted time. Submission by  All presentations are due via to me by midnight, Tuesday, September 13.  For subject, use “Team : Status Report” as in “Team Urban Science: Status Report”.  Attach the PowerPoint source file named “team- -status-report-presentation.ppt” as in team-auto-owners-status-report-presentation.ppt. The Capstone ExperienceTeam Status Reports2

Status Report Team Project Description  Description Point 1  Description Point 2  Description Point 3  Description Point 4 Project Plan Document  Status Point 1  Status Point 2  Status Point 3  Status Point 4 The Capstone ExperienceTeam Status Reports3 (1 of 4)

Status Report Team Server Systems / Software  Description &/or Status Point 1  Description &/or Status Point 2  Description &/or Status Point 3 Development Systems / Software  Description &/or Status Point 1  Description &/or Status Point 2  Description &/or Status Point 3 The Capstone ExperienceTeam Status Reports4 (2 of 4)

Status Report Team Client Contact  Status Point 1  Status Point 2 Team Meetings  Status Point 1  Status Point 2 Team Organization  Description Point 1  Description Point 2 The Capstone ExperienceTeam Status Reports5 (3 of 4)

Status Report Team Risks Risk 1  Description  Mitigation Risk 2  Description  Mitigation Risk 3  Description  Mitigation Risk 4  Description  Mitigation The Capstone ExperienceTeam Status Reports6 (4 of 4)