My wound is Argentina… Harvard Electricity Policy Group May 20, 2005 Jeffrey D. Roark Sr. Strategic Planning Advisor Tennessee Valley Authority Harvard.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Wholesale Restructuring 1.PURPA 2.Market based wholesale rates 3.Incentive rates 4.Energy Policy Act of 1992 Clarified power to order third party wheeling.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Participant Funding Does Competitive Generation Require Competitive Transmission? Robert J. Michaels California State University, Fullerton and Tabors.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
My wound is Argentina… Harvard Electricity Policy Group May 19, 2005 Jeffrey D. Roark Sr. Strategic Planning Advisor Tennessee Valley Authority Harvard.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
Marcy Mealy Procurement Specialist CDBG Program
The Brazilian Electricity Market: Achievements and Challenges
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
EIUG – Wheeling Methodologies
Towards Regional Independent Operators – a main driver for successful market integration.
Ranci Highways Nov.261 Highways: Cost and Regulation in Europe Università degli studi di Bergamo November 26 th -27 th, 2004 Applying a Price Cap: RAB.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Revenue Decoupling: A proposed solution to the utilities’ traditional incentive to encourage wasteful energy use Christopher Grubb
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Argentine Power Sector Market operation - facing stress situations CAMMESA Compañía Administradora del Mercado Mayorista Eléctrico APEX Conference October.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Bulk Power Transmission System
OMS GOALS PLANNING October 14, 2010Commissioner Monica Martinez.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
1 SMD and Efficiency Programs Standard Market Design (SMD) –Implemented March, 2003 –Major feature, locational assignment of costs and locational price.
Illinois Wholesale Market Update December 10, 2003.
Presentation to Select Committee on Economic Development
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
APPA 2007 National Conference Session #10: LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? June 25, 2007 Long-Term Transmission Rights.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Strategies of Reliable Transmission of Energy In A Competitive Market
FERC Order 1000 One Transmission Owner’s Perspective
Transmission Pricing & Regional Electric Markets
Generation Expansion Daniel Kirschen
Presentation transcript:

My wound is Argentina… Harvard Electricity Policy Group May 20, 2005 Jeffrey D. Roark Sr. Strategic Planning Advisor Tennessee Valley Authority Harvard Electricity Policy Group May 20, 2005 Jeffrey D. Roark Sr. Strategic Planning Advisor Tennessee Valley Authority Expansion of Transmission by Market Participants in the World’s First LMP Market Disclaimer: Opinions and ideas are my own, derived from experience under prior employers.

2 Jeffrey D. Roark 5/05 Argentina: The First LMP Market Argentina implemented locational marginal pricing, with congestion and losses, in late In early 1993, I went to Argentina as part of a bid team to purchase hydroelectric plants.  There was no observable history, little data.  There were no market rules written in English.  There were no applicable handy industry acronyms. (ISO, LMP, FTR, etc.)  There were people being “truthful but not helpful.” Argentina implemented locational marginal pricing, with congestion and losses, in late In early 1993, I went to Argentina as part of a bid team to purchase hydroelectric plants.  There was no observable history, little data.  There were no market rules written in English.  There were no applicable handy industry acronyms. (ISO, LMP, FTR, etc.)  There were people being “truthful but not helpful.” Note: Chile had earlier implemented pricing with locational loss adjustments, but without congestion. I am one of the world’s first LMP casualties.

3 Jeffrey D. Roark 5/05 Learned From the First LMP Market Importance of marginal losses in LMP Meaning of congestion in an LMP market* Implications of congestion pricing (violence, bloody wounds, pain, scar tissue…) The importance of LMP to Successful Market Design Importance of marginal losses in LMP Meaning of congestion in an LMP market* Implications of congestion pricing (violence, bloody wounds, pain, scar tissue…) The importance of LMP to Successful Market Design * Distinct from its meaning in the physical bilateral markets.

4 Jeffrey D. Roark 5/05 Learned from the First LMP Market Transmission enhancements can be brought into being by market participants guided by locational pricing signals.  LMP is necessary.  LMP is not sufficient.  FTRs may help, but FTRs are not enough. Market structures beyond LMP are required.  Specific assignment of transmission responsibilities among market participants  Specific, rational process for project proposal and approval  Regulatory mechanism for cost recovery, including allocation of costs to beneficiaries Transmission enhancements can be brought into being by market participants guided by locational pricing signals.  LMP is necessary.  LMP is not sufficient.  FTRs may help, but FTRs are not enough. Market structures beyond LMP are required.  Specific assignment of transmission responsibilities among market participants  Specific, rational process for project proposal and approval  Regulatory mechanism for cost recovery, including allocation of costs to beneficiaries

5 Jeffrey D. Roark 5/05 Did Argentina pioneer Participant Funding? People using the term in the U.S. would likely say it does not apply to Argentina’s method. Transmission added under Argentina’s method becomes part of the regulated system.  Revenue Requirements recovered through tariff  Tariff allocates costs to beneficiaries  Transmission owners are not dependent on outcomes in the energy market (LMPs, FTRs)  Regulatory cost recovery makes projects financeable. The proposal and approval process is key. People using the term in the U.S. would likely say it does not apply to Argentina’s method. Transmission added under Argentina’s method becomes part of the regulated system.  Revenue Requirements recovered through tariff  Tariff allocates costs to beneficiaries  Transmission owners are not dependent on outcomes in the energy market (LMPs, FTRs)  Regulatory cost recovery makes projects financeable. The proposal and approval process is key.

6 Jeffrey D. Roark 5/05 Responsibilities of the Participants The Major Transmitter  Responsible for availability of its assets  Responsible for operating transmission system  Participates in technical evaluation of proposed projects  Responsible for remunerating independent transmitters Independent Transmitters  Responsible for constructing projects to agreed-upon specifications  Responsible for availability of their assets Users of the Network (Generators, LSEs, Large Consumers)  Responsible for proposing expansion projects  Responsible for revenue requirements from projects The Major Transmitter  Responsible for availability of its assets  Responsible for operating transmission system  Participates in technical evaluation of proposed projects  Responsible for remunerating independent transmitters Independent Transmitters  Responsible for constructing projects to agreed-upon specifications  Responsible for availability of their assets Users of the Network (Generators, LSEs, Large Consumers)  Responsible for proposing expansion projects  Responsible for revenue requirements from projects

7 Jeffrey D. Roark 5/05 Process for Enhancing Network Feasibility study and full-spec proposal by market participants Approval study by Major Transmitter and ISO Determination of Beneficiaries Acceptance as a Project by ISO and Beneficiaries (70%) Project is put out for construct/own/operate bids. Revenue requirement allocation to Beneficiaries Feasibility study and full-spec proposal by market participants Approval study by Major Transmitter and ISO Determination of Beneficiaries Acceptance as a Project by ISO and Beneficiaries (70%) Project is put out for construct/own/operate bids. Revenue requirement allocation to Beneficiaries Hydro, oil, gas Hydro Nuclear Buenos Aires 800+ miles

8 Jeffrey D. Roark 5/05 Feasibility Study and Proposal Generators or Distributors suffer congestion costs or losses in an electric region Those who would benefit from an enhancement create a consortium to seek technical solutions Consortium commissions technical study of situation Proposal, complete with “design, construct, & own” bid, is submitted to ISO. Proposal specifies long-term annual revenue requirements. Generators or Distributors suffer congestion costs or losses in an electric region Those who would benefit from an enhancement create a consortium to seek technical solutions Consortium commissions technical study of situation Proposal, complete with “design, construct, & own” bid, is submitted to ISO. Proposal specifies long-term annual revenue requirements. Buenos Aires N.O.A. N.E.A. Centro Cuyo Salto Grande Comahue Electric Regions Process for Enhancing Network

9 Jeffrey D. Roark 5/05 Approval Study by Major Transmitter and ISO ISO studies feasibility of the proposed project. The ISO determines global costs/benefits, negotiates changes. The ISO identifies all beneficiaries of the project ISO studies feasibility of the proposed project. The ISO determines global costs/benefits, negotiates changes. The ISO identifies all beneficiaries of the project Buenos Aires N.O.A. N.E.A. Centro Cuyo Salto Grande Comahue Electric Regions Process for Enhancing Network

10 Jeffrey D. Roark 5/05 Beneficiaries of a Transmission Project Beneficiaries are  producers whose energy prices will rise in response  distributors or users whose energy prices will drop Beneficiaries are important because they must  Agree that the project can go forward  Pay the fixed revenue requirements for the enhancement once it is built. Fixed revenue requirements are to be allocated by pro rata share of the project benefits* Beneficiaries are  producers whose energy prices will rise in response  distributors or users whose energy prices will drop Beneficiaries are important because they must  Agree that the project can go forward  Pay the fixed revenue requirements for the enhancement once it is built. Fixed revenue requirements are to be allocated by pro rata share of the project benefits* Process for Enhancing Network * As Littlechild reports, they actually allocated by “transmission usage” rather than by “benefits.” “Usage” is a peak-load flow-based allocator that can be disproportionate to cumulative benefits.

11 Jeffrey D. Roark 5/05 Acceptance by ISO and Beneficiaries (70%) The ISO determines global costs/benefits The ISO identifies all beneficiaries of the project IF The ISO determines global costs/benefits The ISO identifies all beneficiaries of the project IF Buenos Aires N.O.A. N.E.A. Centro Cuyo Salto Grande Comahue  the project is beneficial to the system, and  sufficient beneficiaries (70%) agree to allow it... then the project is officially approved. Process for Enhancing Network

12 Jeffrey D. Roark 5/05 Construction Project Put Out for Bids The approved project is put out for competitive bids. Substitute competing projects may be proposed! (The ISO and Transmitter will have to study competing projects.) The project may be built, owned, and operated by an independent party unrelated to the original consortium. The approved project is put out for competitive bids. Substitute competing projects may be proposed! (The ISO and Transmitter will have to study competing projects.) The project may be built, owned, and operated by an independent party unrelated to the original consortium. A B C D Line owned by an Independent Carrier Process for Enhancing Network

13 Jeffrey D. Roark 5/05 Allocation of Revenue Requirements The winning bid included annual revenue requirements. The project must perform as promised to receive full revenue requirements. The major transmitter collects the revenue requirements through the single system-wide tariff. The tariff allocates fixed costs of the transmission system to all users through a load flow method and MW-mile rates. (Note: The tariff rate/MW-mile is low relative to incremental construction.) The tariff likely will not cover full cost of the new project. The residual cost of the project is allocated directly to the project beneficiaries, pro rata to their benefits. The winning bid included annual revenue requirements. The project must perform as promised to receive full revenue requirements. The major transmitter collects the revenue requirements through the single system-wide tariff. The tariff allocates fixed costs of the transmission system to all users through a load flow method and MW-mile rates. (Note: The tariff rate/MW-mile is low relative to incremental construction.) The tariff likely will not cover full cost of the new project. The residual cost of the project is allocated directly to the project beneficiaries, pro rata to their benefits. Process for Enhancing Network

14 Jeffrey D. Roark 5/05 Comahue Transfer Limitation Buenos Aires Cerros Colorados El Chocón Market Node 4,474 MW 600 MW 2,600 MW Limit Alicurá Piedra del Aguila 500 kV Hydro Sub Fourth Line added by consortium in late 90s.

15 Jeffrey D. Roark 5/05 Special Circumstances This market was designed and implemented, then divested by the government.  Caveat emptor: They won’t change the rules for you. There were strange legacy inefficiencies that could be explained only anecdotally.  This was not a coherent optimally planned system.  Conversion to a market with LMP set corrective forces in motion. This market was designed and implemented, then divested by the government.  Caveat emptor: They won’t change the rules for you. There were strange legacy inefficiencies that could be explained only anecdotally.  This was not a coherent optimally planned system.  Conversion to a market with LMP set corrective forces in motion.

16 Jeffrey D. Roark 5/05 Re-emphasis: Only beneficiaries can propose and approve projects. Only beneficiaries (>30%) can block a project. Construction procured through a competitive process. Recovery of revenue requirements by the project owner is contingent on availability performance, not on power flows or prices. (Behaves very much like regulatory protection.) Projects can be project financed. No other special incentives are required. The ROE of a project is not known. Only beneficiaries can propose and approve projects. Only beneficiaries (>30%) can block a project. Construction procured through a competitive process. Recovery of revenue requirements by the project owner is contingent on availability performance, not on power flows or prices. (Behaves very much like regulatory protection.) Projects can be project financed. No other special incentives are required. The ROE of a project is not known.

17 Jeffrey D. Roark 5/05 Difficulties with this Approach At first: Having market participants realize their leadership role in the process.  Eventually, consultants will be all over it. Getting agreement among beneficiaries  Broad consortium building is necessary Allocation of the benefits & costs:  based on forward-looking models  plenty of room for disagreement  how to re-allocate beneficiaries over time? At first: Having market participants realize their leadership role in the process.  Eventually, consultants will be all over it. Getting agreement among beneficiaries  Broad consortium building is necessary Allocation of the benefits & costs:  based on forward-looking models  plenty of room for disagreement  how to re-allocate beneficiaries over time?