Project Management Techniques.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Chapter 7 Project Management
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Finding the Critical Path
Project Management CPM/PERT Professor Ahmadi.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
MGMT 483 Week 8 Scheduling.
Project Management Chapter 13
Prepared by Lee Revere and John Large
Chapter 10 Project Scheduling: PERT/CPM
6. Project Management.
Project Management. Maintenance and Reliability 14 Aug 2001.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
© 2008 Prentice-Hall, Inc. Chapter 13 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
Roberta Russell & Bernard W. Taylor, III
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lean Project Management
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Operations Management Project Management Chapter 3.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Welcome to MM305 Unit 7 Seminar Dr. Bill Wood Project Management.
Chapter 16 – Project Management
Project Management Project Controlling
PROJECT MANAGEMENT.
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Project Management Chapter 13
Project Planning & Scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Welcome to MM 305 Unit 8 Seminar!
Prepared by Lee Revere and John Large
General Foundry Example of PERT/CPM
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

Project Management Techniques

Introduction Project management can be used to manage complex projects. The first step in planning and scheduling a project is to develop the work breakdown structure. This involves identifying the activities that must be performed in the project. Each detail and each activity may be broken into its most basic components. The time, cost, resource requirements, predecessors, and person(s) responsible are identified.

Project Management Definition: It is nothing more (or less) than knowing what the status of a project is: when it should be done, how much (and if) it has slipped from the original schedule, what the bottlenecks are, and what you might drop to save some time.

Project Management Models: History One of the earliest techniques was the Gantt chart (Used by US Navy). This type of chart shows the start and finish times of one or more activities, as shown below:

Project Planning, Controlling and Scheduling 1. Setting goals. 2. Defining the project. 3. Tying needs into timed project activities. 4. Organizing the team. Project Scheduling: 1. Tying resources to specific activities. 2. Relating activities to each other. 3. Updating and revising on regular basis. Before Project Project Controlling: 1. Monitoring resources, costs, quality and budgets. 2. Revising and changing plans. 3. Shifting resources to meet demands. During Project

PERT and CPM The program evaluation and review technique (PERT) and the critical path method (CPM) are two popular quantitative analysis techniques that help managers plan, schedule, monitor, and control large and complex projects. They were developed because there was a critical need for a better way to manage.

Framework of PERT and CPM There are six steps common to both PERT and CPM. Define the project and all of its significant activities or tasks. Develop the relationships among the activities. Decide which activities must precede others. Draw the network connecting all of the activities. Assign time and/or cost estimates to each activity. Compute the longest time path through the network; this is called the critical path. Use the network to help plan, schedule, monitor, and control the project.

Questions answered by PERT When will the entire project be completed? What are the critical activities or tasks in the project, that is, the ones that will delay the entire project if they are late? Which are the non-critical activities, that is, the ones that can run late without delaying the entire project’s completion? What is the probability that the project will be completed by a specific date?

Questions answered by PERT At any particular date, is the project on schedule, behind schedule, or ahead of schedule? On any given date, is the money spent equal to, less than, or greater than the budgeted amount? Are there enough resources available to finish the project on time? If the project is to be finished in a shorter amount of time, what is the best way to accomplish this at the least cost?

General Foundry: Example of PERT Background: General Foundry, Inc., a metal works plant has long been trying to avoid the expense of installing air pollution control equipment. The local environmental protection group has recently given the foundry 16 weeks to install a complex air filter system on its main smokestack. General Foundry was warned that it will be forced to close unless the device is installed in the allotted period. They want to make ensure that installation of the filtering system progresses smoothly and on time.

Steps One and Two: Define the project and all project activities. Immediate predecessors are determined in the second step.

Step Three Activities and events are drawn and connected.

Step Four The fourth step is to assign activity times. Time is usually given in units of weeks. Without solid historical data, managers are often uncertain as to activity times. The developers of PERT thus employed a probability distribution based on three time estimates for each activity: Optimistic time Pessimistic time Most likely time

Step 4 - Beta Probability The beta probability distribution is often used when there is no solid historical data upon which to base activity time estimates Found to be appropriate in many cases for determining an expected value and variance for activity completion times

Step Four Three time estimates are provided for each activity: Optimistic time (a): time an activity will take if everything goes as well as possible. There should be only a small probability (say, 1/100) of this occurring. Pessimistic time (b): time an activity would take assuming very unfavorable conditions. There should also be only a small probability that the activity will really take this long. Most likely time (m): most realistic time estimate to complete the activity.

Calculations with PERT To find the expected activity time, the estimates are weighted as follows: Variance for activity completion time is computed as

General Foundry - Time Estimates Activity a m b E(t) 2 A B C D E F G H 1 2 3 4 6 7 9 11 5 25

Step Five The fifth step is to compute the longest path through the network— the critical path.

General Foundry - PERT Network Start Finish A 2 C 2 F 3 E 4 H 2 B 3 D 3 G 5 Act. t ES EF LS LF

Finding The Critical Path To find the critical path, we need to determine the following quantities for each activity in the network: 1. Earliest start time (ES): the earliest time an activity can begin without violation of immediate predecessor requirements. 2. Earliest finish time (EF): the earliest time at which an activity can end. 3. Latest start time (LS): the latest time an activity can begin without delaying the entire project. 4. Latest finish time (LF): the latest time an activity can end without delaying the entire project.

Earliest Times – Calculations Earliest finish time = earliest start time + t EF = ES + t Before any activity can begin all of its predecessor activities must be completed ES = Largest EF of Immediate Predecessors A t=2 ES=0 EF=0+2=2 Start B t=3 ES=0 EF=0+3=3

PERT Network Earliest Start & Finish 0 2 C 2 2 F 3 E 4 H 2 B 3 0 3 D 4 3 G 5 Act. t ES EF LS LF

PERT Network Earliest Start & Finish 0 2 C 2 2 4 F 3 4 E 4 H 2 B 3 0 3 D 4 3 7 G 5

PERT Network Earliest Start & Finish B 3 0 3 D 4 3 7 G 5 8 13 Start Finish A 2 0 2 C 2 2 4 F 3 4 7 E 4 4 8 H 2 13 15

Latest Times – Calculations Work backwards from the Finish Latest start time = latest finish time – activity time LS = LF - t LF = Smallest LS of activities that immediately follow

PERT Network Latest Start & Finish B 3 0 3 D 3 3 7 G 5 8 13 Start Finish A 2 0 2 C 2 2 4 F 3 4 7 13 E 4 4 8 H 2 13 15 Act. t ES EF LS LF

PERT Network Latest Start & Finish B 3 0 3 1 4 D 4 3 7 4 8 G 5 8 13 Start Finish A 2 0 2 C 2 2 4 F 3 4 7 10 13 E 4 H 2 13 15

Slack Slack indicates how long an activity may be delayed without delaying the entire project. LS – ES or, LF – EF The activities with no slack time can not be delayed without delaying the entire project This makes them critical activities and they are said to be on the critical path

General Foundry Schedule & Slacks Activity ES EF LS LF LS-ES On Critical Path? A 2 Yes B 3 1 4 No C D 7 8 E F 10 13 6 G H 15

Critical Path A 2 0 2 C 2 2 4 F 3 4 7 10 13 Total Time = 15 E 4 4 8 0 2 C 2 2 4 F 3 4 7 10 13 Total Time = 15 E 4 4 8 H 2 13 15 Start Finish B 3 0 3 1 4 D 3 3 7 4 8 G 5 8 13

Project Variance The term “project variance” refers to the critical path variance since the time to complete the project is the time to complete the critical path. This is found by summing the variances of the activities on the critical path.

Probability Distribution for Project Completion Times Computing the standard deviation

What PERT Was Able to Provide The project’s expected completion date is 15 weeks. Assume that the total project completion time follows a normal probability distribution Chart on previous slide tells us that there is a 50% chance of completing the entire project in less than 15 weeks and a 50% chance it will exceed 15 weeks There is a 71.6% chance that the equipment will be in place within the 16-week deadline. Z=(16 weeks – 15 weeks)/1.76 weeks=.57 PERT can easily find the probability of finishing by any date they are interested in.

What PERT Was Able to Provide Five activities (A, C, E, G, H) are on the critical path. If any one of the critical activities is delayed for any reason, the entire project will be delayed. Three activities (B, D, F) are not critical but have some slack time built in. They can borrow from their resources, if needed, possibly to speed up the entire project. A detailed schedule of activity starting and ending dates has been made available.

PERT/COST Although PERT is an excellent method of monitoring and controlling project length, it does not consider another very important factor, project cost. PERT/Cost is a modification of PERT that allows a manager to plan, schedule, monitor, and control cost as well as time. Using PERT/Cost to plan, schedule, monitor, and control project cost helps accomplish the sixth and final step of PERT.

Critical Path Method (CPM) CPM is a deterministic network model. This means it assumes that both the time to complete each activity, and the cost of doing so are known with certainty. Unlike PERT, it does not employ probability concepts. Instead, CPM uses two sets of time and cost estimates for activities: A normal time and cost and A crash time and cost.

CPM The normal time estimate is like PERT’s expected time. The normal cost is an estimate of cost to complete an activity in normal time. The crash time is the shortest possible activity time. Crash cost is the cost of completing the activity on a crash or deadline basis. The critical path calculations for a CPM network follow the same steps as used in PERT. All required is to just find the early start times (ES), late start times (LS), early finish (EF), late finish (LF), and slack.

Another Example Task Duration Predecessor(s) A 2 - B 5 C 1 D 10 E 3 A,D F 6 G 8 E,F

Gantt Chart TASK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A   B C D E F G

PERT Chart START DONE A 2 0 13 15 B 5 D 10 E 3 G 8 0 5 15 18 26 5 26 C 0  13  15    B 5 D 10 E 3 G 8 START  0  5  15  18 26  DONE 5   26 C 1 F 6 1   1 7  11  12